HS2 Construction Site West Of A412 Denham Way Chalfont Lane West Hyde Hertfordshire Data via plota.co.uk

26/1584/HS2 - HS2 schedule 17 application Pending Consideration

Proposal

Application for non-material change under Paragraph 21 of Schedule 17 to the High Speed Rail (London-West Midlands) Act 2017. Amendment to Schedule 17 Approval Ref to amend hand rail design to Tilehouse Lane overbridge wingwalls Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
1 Oct 2026
Decision
Expected by 26 Nov 2026

Under consideration

No decision has been issued yet. A decision is expected by 26 Nov 2026.

Site constraints 4

Green belt: London
Inappropriate development needs very special circumstances.
Green belt policy allows a short list of exceptions, such as limited extensions and replacement buildings. Anything else needs very special circumstances that clearly outweigh the harm. Some green belt land can count as grey belt, where it does not strongly serve the green belt's purposes. The council decides this in its green belt assessment or on each application, so we do not mark it here.
Read the government guidance ↗
Agricultural land, grade 2
Best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. Natural England's Provisional ALC map (1:250,000, 1970s), which most planning maps still show, had this area as grade 3. The predicted grade is Defra's current estimate; only a site survey settles it.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Also on the record
Radon affected area, class 2; National infrastructure project about 1493 m away: Expansion of Heathrow Airport (Third Runway), at pre-application.
Not affected
Outside flood zones 2 and 3 · No scheduled monument at the site

Checked on 6 October 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Three Rivers - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
HS2 schedule 17 application
Received
1 Oct 2026
Validated
1 Oct 2026
Ward
Chorleywood South And Maple Cross
Parish
Non-Parished
Case officer
Show
Target decision
26 Nov 2026
Decision level
Delegated
Applicant
Show
Agent
Align JV

Public comments

No public comments yet.

Last counted 6 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
ALJ-TP-2060a
Statutory expiry
26 Nov 2026
Env. assessment
No
Three Rivers
Planning Authority Score
7.3/10
Good
#54 of 296 councils
Relevant to this application:
Householder decisions

Three Rivers is faster than most councils at deciding householder applications, ranking #30 out of 296. Only 24% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Householder applications are slightly more likely to be approved here (91%) than the national average (90%).

Faster than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Three Rivers decision statistics
Based on MHCLG data, the year to March 2026
89%
Overall approval rate
Above avg (87%) #145 of 296
91%
Householder approved
Above avg (90%) #184 of 296
82%
Decided in 8 weeks
Above avg (63%) #30 of 296
24%
Extended time limit
Below avg (41%) #28 of 296
85%
Minor dwellings approved
62 decided (1-9 homes)
63%
Major dwellings approved
8 decided (10+ homes)
94%
Change of use approved
17 decided
819
Total decisions
86 refused in the year to March 2026