Various sites Data via plota.co.uk

P26/V5276/16A(28) - Telecoms 28 day notification Part 16, Class A Under Consideration

Proposal

New Cabinets (Schedule 1 application under the 2026 Regulations) Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
9 Nov 2026
Decision
Expected by 7 Dec 2026

Under consideration

No decision has been issued yet. Plota predicts a decision between 30 Nov 2026 and 4 Jan 2027, from Vale of White Horse's recent utility and infrastructure works.

Site constraints 4

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Priority habitat: Coastal and floodplain grazing marsh
A habitat of principal importance. It shapes the ecology work and the biodiversity net gain a scheme has to show.
Agricultural land, grade 2
Best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. Natural England's Provisional ALC map (1:250,000, 1970s), which most planning maps still show, had this area as grade 4. The predicted grade is Defra's current estimate; only a site survey settles it.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Also on the record
National infrastructure project: White Horse Reservoir (previously known as South East Strategic Reservoir Option), at pre-application.
Not affected
Not green belt · No scheduled monument at the site

Checked on 17 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Vale of White Horse - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Telecoms 28 day notification Part 16, Class A
Received
9 Nov 2026
Validated
9 Nov 2026
Target decision
7 Dec 2026
Applicant
Show

Decision outlook

Day 15 of the 56-day target. Vale of White Horse usually decides utility and infrastructure works by day 28.

Day 1541 days to the 56-day target
61%decided within 8 weeks
97%approved
85decided in the last year

Plota live figures for utility and infrastructure works decided by Vale of White Horse in the last twelve months, from validation. Vale of White Horse decision record →

Public comments

No public comments yet.

Last counted 22 Nov 2026

Read the comments on the council site ↗

Consultation & key dates

Statutory expiry
7 Dec 2026
Vale of White Horse
Planning Authority Score
4.5/10
Below average
#176 of 296 overall
Relevant to this application:
Householder decisions

Vale of White Horse is #198 of 296 councils on householder decision speed. 51% of applications have the time limit extended, above the 41% national average. Householder applications are slightly more likely to be approved here (96%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
Vale of White Horse decision statistics
Based on MHCLG data, the year to March 2026
95%
Overall approval rate
Above avg (87%) #32 of 296
96%
Householder approved
Above avg (90%) #64 of 296
57%
Decided in 8 weeks
Below avg (63%) #198 of 296
51%
Extended time limit
Above avg (41%) #232 of 296
86%
Minor dwellings approved
83 decided (1-9 homes)
88%
Major dwellings approved
16 decided (10+ homes)
90%
Change of use approved
31 decided
1,015
Total decisions
51 refused in the year to March 2026