22 Heath View Heath View Street Halifax Calderdale HX1 2JU Data via plota.co.uk

26/00571/COU - Change of Use Pending Consideration

Proposal

Change of use from small HMO (Class C4) to large HMO (Sui Generis) Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
21 Aug 2026
✓
Validated
16 Sept 2026
✓
Consultation
17 Sept 2026
Decision
Expected by 11 Nov 2026

Under consideration

No decision has been issued yet. Plota predicts a decision around 11 Nov 2026, from Calderdale's recent changes of use.

Comments are open until 8 Oct 2026

Comment on this application ↗

Site constraints 7

Also on the record
2 listed buildings within 150 m; Nature recovery project: Bradford and South Pennines; Radon affected area, class 2; Conservation area 69 m away: Halifax Town Centre Conservation Area; Coalfield, development low risk area; National infrastructure project 811 m away: Calderdale Energy Park, at pre-application; Inside the Halifax built-up area.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the Mining Remediation Authority, the Planning Inspectorate, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Building

Floor area177 m² (1,905 sq ft)
Energy ratingC (70 out of 100), could reach B
PropertySemi-detached house, 4 habitable rooms
Built1983 to 1990
HeatingRoom heaters, electric
WallsCavity wall, filled cavity

From the energy performance certificate lodged in June 2026, the latest held for this property. The building may have changed since. View the certificate

Work with planning data?

Every application in Calderdale - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Calderdale
Application type
Change of Use
Postcode
HX1 2JU
Received
21 Aug 2026
Validated
16 Sept 2026
Ward
Halifax Town
Parish
Not In A Parish
Case officer
Show
Target decision
11 Nov 2026
Applicant
Show
Agent
Langley Architectural

Decision outlook

Day 23 of the 56-day target. Calderdale usually decides changes of use by day 56.

Day 2333 days to the 56-day target
59%decided within 8 weeks
85%approved
59decided in the last year

Plota live figures for changes of use decided by Calderdale in the last twelve months, from validation. Calderdale decision record →

Public comments

No public comments yet.

8 neighbours consulted · Last counted 2 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Neighbours
17 Sept 2026
Consultation
17 Sept 2026
Comments by
8 Oct 2026
Statutory expiry
11 Nov 2026
Env. assessment
No
Calderdale
Planning Authority Score
2.7/10
Poor
#240 of 296 councils
Relevant to this application:
Change of use

Calderdale ranks #193 out of 296 councils for householder decision speed. 50% of applications have the time limit extended, above the 41% national average. Householder applications are slightly less likely to be approved here (87%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
Calderdale decision statistics
Based on MHCLG data, the year to March 2026
86%
Overall approval rate
Below avg (87%) #192 of 296
87%
Householder approved
Below avg (90%) #229 of 296
58%
Decided in 8 weeks
Below avg (63%) #193 of 296
50%
Extended time limit
Above avg (41%) #223 of 296
73%
Minor dwellings approved
103 decided (1-9 homes)
82%
Major dwellings approved
11 decided (10+ homes)
89%
Change of use approved
61 decided
856
Total decisions
121 refused in the year to March 2026

Freehold boundary: © Crown copyright and database rights 2026, HM Land Registry. Polygons © Crown copyright and database rights 2026 Ordnance Survey 100026316. Conditions of use

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.