The Vinery Arundel Road Poling BN18 9PY Data via plota.co.uk

A/145/26/PD Undecided

Proposal

Prior notification under Schedule 2, Part 14, Class J for the installation of 100 No photovoltaic panels on roof. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
18 Sept 2026
✓
Validated
21 Sept 2026
Decision
Expected by 16 Nov 2026

Under consideration

No decision has been issued yet. Plota predicts a decision around 13 Nov 2026, from Arun's recent prior approvals.

Comments are open until 22 Oct 2026

Comment on this application ↗

Site constraints 5

Agricultural land, grade 2
Best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. Natural England's Provisional ALC map (1:250,000, 1970s) agrees.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
National infrastructure project about 191 m away: Rampion 2 Offshore Wind Farm
The site is about 191 m from the project boundary. Generating station, decided. The project page says whether consent was granted.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Also on the record
National park about 152 m away: South Downs; Radon affected area, class 3.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 6 October 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Arun - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Arun
Postcode
BN18 9PY
Received
18 Sept 2026
Validated
21 Sept 2026
Parish
Angmering
Case officer
Show
Target decision
16 Nov 2026
Applicant
Show
Agent
Vision Architects Alexandra House Winchester Hill Romsey SO51 7ND

Decision outlook

Day 18 of the 56-day target. Arun usually decides prior approvals by day 53.

Day 1838 days to the 56-day target
71%decided within 8 weeks
64%approved
19decided in the last year

Plota live figures for prior approvals decided by Arun in the last twelve months, from validation. Arun decision record →

Consultation & key dates

Comments by
22 Oct 2026
Arun
Planning Authority Score
8.9/10
Excellent
#4 of 296 councils
Relevant to this application:
Householder decisions

Arun is one of the fastest councils in England for householder decisions, ranking #2 out of 296. Only 12% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Householder applications are slightly more likely to be approved here (94%) than the national average (90%).

Among the fastest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Arun decision statistics
Based on MHCLG data, the year to March 2026
86%
Overall approval rate
Below avg (87%) #187 of 296
94%
Householder approved
Above avg (90%) #97 of 296
99%
Decided in 8 weeks
Above avg (63%) #2 of 296
12%
Extended time limit
Below avg (41%) #4 of 296
45%
Minor dwellings approved
66 decided (1-9 homes)
75%
Major dwellings approved
20 decided (10+ homes)
86%
Change of use approved
35 decided
794
Total decisions
113 refused in the year to March 2026