Land At Grid Reference 243152 126528 Abbotsham Road Bideford Devon Data via plota.co.uk

1/0998/2025/REMM - Approval of Reserved Matters Approved

Proposal

Reserved matters application for Internal Access, Appearance, Landscaping, Layout and Scale for 10 dwellings pursuant to application Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
19 Dec 2025
✓
Validated
6 Jan 2026
✓
Consultation
9 Jul 2026
✓
Approved
9 Jul 2026

Approved on 9 Jul 2026 · Delegated Decision · Last checked 9 Sept 2026

Documents 86

Statements & assessments 24

PDF DRAINAGE STATEMENT Drainage Report · 2 Jul 2026 View ↗ PDF FLOOD RISK MANAGEMENT Consultee Comment · 1 Jul 2026 View ↗ PDF ROPOSED SURFACE WATER DRAINAGE STRATEGY Revised Drawing · 5 May 2026 View ↗ PDF PROPOSED DRAINAGE PLAN Revised Drawing · 5 May 2026 View ↗ PDF ROPOSED SURFACE WATER DRAINAGE STRATEGY Revised Drawing · 5 May 2026 View ↗ PDF Ecology Report Ecology Report · 20 Mar 2026 View ↗ PDF CATCHMENT AREA & OVERLAND FLOOD FLOW ROUTES Drawing · 20 Mar 2026 View ↗ PDF CATCHMENT AREA & OVERLAND FLOOD FLOW ROUTES Drawing · 20 Mar 2026 View ↗ PDF CATCHMENT AREAS & OVERLAND FLOOD FLOW SHEET 2 Drawing · 3 Mar 2026 View ↗ PDF CATCHMENT AREAS & OVERLAND FLOOD FLOW SHEET 1 Drawing · 3 Mar 2026 View ↗ PDF BNG Statement BNG Statement · 21 Jan 2026 View ↗ PDF BNG Metric BNG Metric · 21 Jan 2026 View ↗ PDF LANDSCAPE AND ECOLOGICAL MANAGEMENT PLAN Report · 21 Jan 2026 View ↗ PDF ADOPTABLE DRAINAGE CONSTRUCTION DETAILS SHT1 Drawing · 6 Jan 2026 View ↗ PDF ADOPTABLE DRAINAGE CONSTRUCTION DETAILS SHT2 Drawing · 6 Jan 2026 View ↗ PDF PRIVATE DRAINAGE CONSTRUCTION DETAILS Drawing · 6 Jan 2026 View ↗ PDF DRAINAGE NEAR FOUNDATIONS Drawing · 6 Jan 2026 View ↗ PDF ENERGY SUSTAINABILITY STATEMENT Report · 19 Dec 2025 View ↗ PDF ARBORICULTURAL IMPACT ASSESSMENT REPORT Report · 19 Dec 2025 View ↗ PDF FOUL DRAINAGE REPORT Report · 19 Dec 2025 View ↗ PDF DRAINAGE SIMULATION RESULTS Report · 19 Dec 2025 View ↗ PDF DRAINAGE SIMULATION RESULTS Report · 19 Dec 2025 View ↗ PDF PROPOSED DRAINAGE PLAN Superseded Drawing · 19 Dec 2025 View ↗ PDF FOUL AND SURFACE WATER DRAINAGE STATEMENT Foul Drainage Assessment · 19 Dec 2025 View ↗

Plans & drawings 48

PDF STREET SCENES- PHASE 2C Drawing · 13 May 2026 View ↗ PDF MEANS OF ENCLOSURE-PHASE 2C Drawing · 13 May 2026 View ↗ PDF METER LAYOUT - PHASE 2C Drawing · 13 May 2026 View ↗ PDF REFUSE LAYOUT - PHASE 2C Drawing · 13 May 2026 View ↗ PDF SITE LANDSCAPING & SCHEDULE - PHASE 2C Drawing · 13 May 2026 View ↗ PDF SITE LAYOUT-PHASE 2C Drawing · 13 May 2026 View ↗ PDF PARKING & EV LAYOUT- PHASE 2C Drawing · 13 May 2026 View ↗ PDF MATERIALS LAYOUT-PHASE 2C Drawing · 13 May 2026 View ↗ PDF COLOUR LAYOUT - PHASE 2C Drawing · 13 May 2026 View ↗ PDF HOUSE TYPES Drawing · 20 Mar 2026 View ↗ PDF MANAGEMENT AREA PLAN Drawing · 20 Mar 2026 View ↗ PDF MATERIALS LAYOUT Drawing · 20 Mar 2026 View ↗ PDF PARKING & EV LAYOUT Drawing · 20 Mar 2026 View ↗ PDF REFUSE LAYOUT Drawing · 20 Mar 2026 View ↗ PDF MEANS OF ENCLOSURE Drawing · 20 Mar 2026 View ↗ PDF CYCLE STORAGE LAYOUT Drawing · 20 Mar 2026 View ↗ PDF SITE LAYOUT Drawing · 20 Mar 2026 View ↗ PDF SITE LANDSCAPING & SCHEDULE Drawing · 20 Mar 2026 View ↗ PDF LAYOUT PLAN Drawing · 20 Mar 2026 View ↗ PDF METER LAYOUT Drawing · 20 Mar 2026 View ↗ PDF BOUNDARY TREATMENT PLAN Drawing · 17 Mar 2026 View ↗ PDF CONSTRUCTION AND ENVIRONMENTAL MANAGEMENT PLAN Report · 21 Jan 2026 View ↗ PDF ADOPTABLE HIGHWAY CONSTRUCTION DETAILS Drawing · 6 Jan 2026 View ↗ PDF PRIVATE HIGHWAY CONSTRUCTION DETAILS Drawing · 6 Jan 2026 View ↗ PDF TREE PROTECTION PLAN Drawing · 6 Jan 2026 View ↗ PDF COLOUR LAYOUT Drawing · 6 Jan 2026 View ↗ PDF ADOPTABLE STEP DETAILS Drawing · 6 Jan 2026 View ↗ PDF STREET SCENES Drawing · 6 Jan 2026 View ↗ PDF PROPOSED TRACKING ANALYSIS Drawing · 19 Dec 2025 View ↗ PDF SITE LANDSCAPING SPECIFICATION & SCHEDULE Drawing · 19 Dec 2025 View ↗ PDF PHASING PLANS Drawing · 19 Dec 2025 View ↗ PDF LOCATION PLAN PH2C Drawing · 19 Dec 2025 View ↗ PDF PARKING AND EV LAYOUT Drawing · 19 Dec 2025 View ↗ PDF REFUSE LAYOUT Drawing · 19 Dec 2025 View ↗ PDF PROPOSED STREET SCENE Drawing · 19 Dec 2025 View ↗ PDF METER LAYOUT Drawing · 19 Dec 2025 View ↗ PDF PROPOSED SITE LAYOUT Drawing · 19 Dec 2025 View ↗ PDF SITE LANDSCAPING + SCHEDULE Drawing · 19 Dec 2025 View ↗ PDF HOUSE TYPES Drawing · 19 Dec 2025 View ↗ PDF MATERIAL LAYOUT Drawing · 19 Dec 2025 View ↗ PDF INDICATIVE CUT/FILL PLAN Drawing · 19 Dec 2025 View ↗ PDF PROPOSED SURFACING PLAN Drawing · 19 Dec 2025 View ↗ PDF EXISTING SITE PLAN Drawing · 19 Dec 2025 View ↗ PDF PROPOSED SITE PLAN Drawing · 19 Dec 2025 View ↗ PDF PROPOSED LEVELS PLAN Drawing · 19 Dec 2025 View ↗ PDF PROPOSED KERBING PLAN Drawing · 19 Dec 2025 View ↗ PDF PROPOSED HIGHWAY, TURNING HEAD AND EXISTING PATH LONG SECTIONS Drawing · 19 Dec 2025 View ↗ PDF PROPOSED IMPERMEABLE AREA PLAN Drawing · 19 Dec 2025 View ↗

All documents on the council site ↗

Site constraints 4

Agricultural land, grade 3a, surveyed
Best and most versatile land (grades 1, 2 and 3a). Source: Natural England's post-1988 ALC field survey (Bristol). Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 2; the survey is the definitive reading.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Survey report ↗
Also on the record
Radon affected area, class 2; Coalfield, development low risk area; National infrastructure project 660 m away: Xlinks Morocco-UK Power Project.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the Mining Remediation Authority, the Planning Inspectorate, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Torridge - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Torridge
Application type
Approval of Reserved Matters
Received
19 Dec 2025
Validated
6 Jan 2026
Ward
Bideford West
Parish
Bideford
Case officer
Show
Target decision
9 Jul 2026
Decision
Application Approved
Decision date
9 Jul 2026
Decision level
Delegated Decision
Applicant
Show
Agent
Turley

How this decision compares

Decided in 184 days from validation, 128 days slower than Torridge's median of 56 for new homes. Approved, as 90% of new homes here are.

52%decided within 8 weeks
90%approved
103decided in the last year

Plota live figures for new homes decided by Torridge in the last twelve months, from validation. Torridge decision record →

Public comments

No public comments yet.

8 neighbours consulted · Last counted 9 Sept 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-14569166
Planning Portal ref
PP-14569166
Neighbours
7 Jan 2026
Consultation
9 Jul 2026
Comments by
27 Mar 2026
Site or press notice
14 Jan 2026
Statutory expiry
7 Apr 2026
Env. assessment
No
Torridge
Planning Authority Score
7.6/10
Good
#40 of 296 councils
Relevant to this application:
Major dwellings

Torridge is faster than most councils at deciding householder applications, ranking #55 out of 296. Householder applications are more likely to be approved here than most councils, with a 98% approval rate vs 90% nationally.

More permissive than most councils
98% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
Torridge decision statistics
Based on MHCLG data, the year to March 2026
87%
Overall approval rate
Above avg (87%) #184 of 296
98%
Householder approved
Above avg (90%) #25 of 296
78%
Decided in 8 weeks
Above avg (63%) #55 of 296
38%
Extended time limit
Below avg (41%) #133 of 296
72%
Minor dwellings approved
155 decided (1-9 homes)
85%
Major dwellings approved
13 decided (10+ homes)
82%
Change of use approved
11 decided
554
Total decisions
71 refused in the year to March 2026