Land bound by Greengate, Collier Street, Queen and King Street and Gravel Lane , Greengate, Salford, M3 7BN Data via plota.co.uk
Proposal
Application for approval of details reserved by condition 10 (Boulevard Pedestrian Protection) attached to planning permission Data via plota.co.uk
Application progress
Under consideration
No decision has been issued yet. A decision is expected by 17 Jul 2026.
Documents 3
Plans & drawings 2
Other documents 1
Associated applications 4
Part of
Conditions 10 awaiting decision · 7 decided (outcome not recorded)
- ConditionsApplication for approval of details reserved by condition 10 (Boulevard Pedestrian Protection)This applicationOTH/2026/0737
Show 2 more · 1 pending, 1 decided
Site constraints 6
Checked on 6 October 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Mining Remediation Authority and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.
Every application in Salford - and every UK council - as a live feed, an API, or a bulk CSV export.
Other new applications on this street
Land Bound By Greengate, Collier Street, Queen And King Street And Gravel Lane , M3 7BN
Request for approval of detail required by Condition 7 (SuDS Management and Main...
Collier Street Baths, Collier Street, Salford, M3 7DW
Listed Building Consent for the installation of two externally illuminated stati...
Nearby new applications
Car Park, Bloom Street, Salford, Manchester, M3 6AN
Display of 1no. double-sided internally illuminated projecting sign, 1no. non-il...
Site Between Trinity Way And Audacious Church To The West Of Bury Street And Local Blackfriars Salford M3 7DA
Request for confirmation of compliance of condition 27 (Social Value Strategy) a...
27 King Street Manchester M2 6AF
Installation of 1 externally illuminated projecting sign and 1 non-illuminated i...
New Bailey Estate, Salford
Display of 1no. illuminated digital information signs, 4no. non-illuminated dire...
New Cathedral Street Manchester M1 1AD
Alteration of roof top plant enclosure together with addition of louvres and swa...
St Ann's Square and Exchange Street Manchester
City Council Development: Creation of temporary Christmas Markets for a period o...
Important details
Public comments
No public comments yet.
Last counted 7 Oct 2026
Consultation & key dates
- Comments by
- 17 Jun 2026
Historical activity at this location
27 previous applications on record - archival context, not part of the live application.
Previous applications at this address
Nearby activity
Salford is slower than most councils at deciding householder applications, ranking #206 out of 296. 53% of applications have the time limit extended, above the 41% national average. Householder applications are slightly more likely to be approved here (95%) than the national average (90%).
Track this application
Land bound by Greengate, Collier Street, Queen and King Street and Gravel Lane , Greengate, Salford, M3 7BN
Tracking this application
Not there in a minute? Check junk - especially Hotmail and Outlook.
Go to your dashboard →Sign in to view contact details
Applicant and case-officer names are hidden from public view for privacy. Create a free Plota account - or sign back in - and we'll show them, plus you get a dashboard for alerts and tracked applications.
Check your email
Referenced application
Council archive
Land Bound By Greengate, Collier Street, Queen And King Street And Gravel Lane , M3 7BN
Application for approval of Reserved Matters (Access, Appearance, Landscaping, Layout and Scale) pursuant to Outline Planning Permission 21/78473/HYBEIA for Plot FG (Phase 3), comprising the demolition of existing buildings and a residential-led development of a 40-storey (plus ground) building containing 518 apartments together with associated residents' amenities, ground floor commercial floorspace, basement parking, public realm improvements including the delivery of parts of Boulevard West and Collier Square…
- Received
- 29 Nov 2022
- Decided
- 2 Mar 2023
- Outcome
- Approved
- Type
- Outline
- Homes
- 518

The consultation period closed on 17 Jun 2026.