Ham Close, Ham Village Green, Car Park To East Of Ham Village Green, And Part Of Woodville Day Centre Site… Data via plota.co.uk

PA26/3140 - Condition Approval Approved

Proposal

Details pursuant to condition NS52 - Zero Carbon (Phase 1) (Community Centre and Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
10 Sept 2026
✓
Approved
21 Sept 2026

Approved on 21 Sept 2026 · Last checked 16 Sept 2026

Site constraints 7

In flood zones plus climate change
Inside the extent flood zones 2 and 3 could reach with climate change: the Central allowance for the 2080s on rivers, the Upper End allowance for sea level rise to 2125. From rivers. Defences are not counted.
The Environment Agency flood map for planning. Councils use it to decide when a flood risk assessment and the sequential test are needed. It is indicative and does not show whether a particular property will flood.
Flood map ↗
Air quality management area: Richmond AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Also on the record
Local nature reserve 458 m away: Ham Lands; National infrastructure project 146 m away: Teddington Direct River Abstraction (TDRA), at pre-application; Inside the Richmond upon Thames built-up area; Public transport access: PTAL 1b (very poor), TfL 2023, for the 100 m square.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Richmond upon Thames - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Condition Approval
Received
10 Sept 2026
Validated
10 Sept 2026
Ward
Ham, Petersham & Richmond Riverside Ward [HMP]
Case officer
Show
Target decision
5 Nov 2026
Decision date
21 Sept 2026
Applicant
Show
Agent
Hill Partnerships Ltd

Consultation & key dates

Alt. reference
PP-15215830
Richmond upon Thames
Planning Authority Score
4.4/10
Below average
#182 of 296 councils
Relevant to this application:
Householder decisions

Richmond upon Thames ranks #130 out of 296 councils for householder decision speed. Richmond upon Thames is also one of the strictest councils - it refuses more householder applications than almost any other, with only 82% approved vs 90% nationally.

One of the strictest councils
only 82% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
Richmond upon Thames decision statistics
Based on MHCLG data, the year to March 2026
81%
Overall approval rate
Below avg (87%) #257 of 296
82%
Householder approved
Below avg (90%) #268 of 296
69%
Decided in 8 weeks
Above avg (63%) #130 of 296
35%
Extended time limit
Below avg (41%) #104 of 296
68%
Minor dwellings approved
181 decided (1-9 homes)
100%
Major dwellings approved
3 decided (10+ homes)
47%
Change of use approved
17 decided
1,888
Total decisions
358 refused in the year to March 2026