Hull City Council Derek Crothall Building Charlotte Street Mews Kingston Upon Hull HU1 3BP Data via plota.co.uk

26/00716/ADV - Advertisement Application Approved

Proposal

Advertisement Consent for the Display of:- coloured panels, logos and individual letters consisting of illuminated and non-illuminated signage. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
21 Jul 2026
✓
Approved
26 Aug 2026

Approved on 26 Aug 2026 · Delegated Decision · Last checked 28 Aug 2026

Site constraints 5

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
National infrastructure project 433 m away: A63 Castle Street Improvement-Hull
The site is 433 m from the project boundary. Highway, decided. The project page says whether consent was granted.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
24 listed buildings within 150 m
Nearest: Numbers 83 to 93 and Attached Railings, Grade II, 43 m away · 1 Grade I, 23 Grade II
The site itself is not listed. Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show all 24 with distances
Historic England ↗
Also on the record
Conservation area 37 m away: Georgian New Town; Inside the Kingston upon Hull built-up area.
Not affected
Not green belt · No scheduled monument at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Hull - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Hull
Application type
Advertisement Application
Postcode
HU1 3BP
Received
21 Jul 2026
Validated
21 Jul 2026
Ward
St Andrews And Dockland
Case officer
Show
Decision
Advert Approval
Decision date
26 Aug 2026
Decision level
Delegated Decision
Agent
SPACE Architects

How this decision compares

Decided in 36 days from validation, 20 days faster than Hull's median of 56 for signs and adverts. Approved, as 89% of signs and adverts here are.

66%decided within 8 weeks
89%approved
38decided in the last year

Plota live figures for signs and adverts decided by Hull in the last twelve months, from validation. Hull decision record →

Public comments

No public comments yet.

Last counted 28 Aug 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-14899924
Planning Portal ref
PP-14899924
Comments by
6 Aug 2026
Env. assessment
No
Hull
Planning Authority Score
2.6/10
Poor
#248 of 296 councils
Relevant to this application:
Other decisions

Hull is slower than most councils at deciding householder applications, ranking #231 out of 296. The council extends the time limit on 62% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are slightly more likely to be approved here (92%) than the national average (90%).

Frequently extends decision deadlines
expect longer than the statutory limit
These figures are council-wide context, not a prediction for this application. View full council performance
Hull decision statistics
Based on MHCLG data, the year to March 2026
92%
Overall approval rate
Above avg (87%) #85 of 296
92%
Householder approved
Above avg (90%) #156 of 296
51%
Decided in 8 weeks
Below avg (63%) #231 of 296
62%
Extended time limit
Above avg (41%) #273 of 296
88%
Minor dwellings approved
16 decided (1-9 homes)
86%
Major dwellings approved
14 decided (10+ homes)
88%
Change of use approved
33 decided
436
Total decisions
36 refused in the year to March 2026

Freehold boundary: © Crown copyright and database rights 2026, HM Land Registry. Polygons © Crown copyright and database rights 2026 Ordnance Survey 100026316. Conditions of use