PL/11613 - Full planning permission Under Consultation

Proposal

Installation of electric vehicle charging points – comprising chargepoint upstands, supporting electrical equipment, including a substation, cabinet infrastructure and electrical cabling Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
6 Nov 2026
✓
Validated
10 Nov 2026
Decision
Expected by 5 Jan 2027

Under consideration

No decision has been issued yet. Plota predicts a decision between 23 Dec 2026 and 11 Jan 2027, from Carmarthenshire's recent utility and infrastructure works.

Comments are open until 1 Dec 2026

Comment on this application ↗

Site constraints 5

Agricultural land, grade 3b
Not best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. A site survey can differ.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Also on the record
Radon affected area, class 4; National infrastructure project: Gwynt Glas Offshore Wind Farm, at pre-application; Special area of conservation 469 m away: Afon Tywi / River Tywi; SSSI 469 m away: Afon Tywi.
Not affected
Outside flood zones 2 and 3 · No listed building at the site · No scheduled monument at the site

Checked on 10 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Carmarthenshire - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Full planning permission
Postcode
SA31 2NF
Received
6 Nov 2026
Validated
10 Nov 2026
Ward
Llangunnor
Parish
Llangunnor
Case officer
Show
Target decision
5 Jan 2027

Decision outlook

Day 1 of the 56-day target. Carmarthenshire usually decides utility and infrastructure works by day 52.

Day 155 days to the 56-day target
54%decided within 8 weeks
89%approved
36decided in the last year

Plota live figures for utility and infrastructure works decided by Carmarthenshire in the last twelve months, from validation. Carmarthenshire decision record →

Consultation & key dates

Comments by
1 Dec 2026