Maltby Sports Centre Braithwell Road Maltby 9999 Data via plota.co.uk

RB2025/1072 Approved

Proposal

Prior Notification for the Installation of roof mounted Solar Photovoltaics (PV) equipment. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
11 Aug 2025
✓
Validated
13 Aug 2025
✓
Approved
2 Oct 2025

Approved on 2 Oct 2025 · Delegated (Part 2A) · Last checked 15 Oct 2026

Planning committee

Decided by Rotherham Planning Board on 30 Apr 2026.

Approved

No officer report was published for this decision; this summary is from the committee minutes.

  • Members granted the application, together with another case decided at the same meeting, for the reasons they adopted and the conditions set out in the report.

Source: Plota analysis of Rotherham's committee minutes, Rotherham Planning Board minutes, 30 April 2026 .

Site constraints 5

Maltby Neighbourhood Plan | Community Facilities Area
National infrastructure project about 325 m away: Knottingley Power Project
The site is about 325 m from the project boundary. Generating station, decided. The project page says whether consent was granted.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Maltby Neighbourhood Plan | Community Facilities AreaCouncil record
Recorded by the council for this site.
Council site ↗
Also on the record
Radon affected area, class 2; Coalfield, development low risk area; Inside the Maltby built-up area.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 2 November 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Mining Remediation Authority, the Planning Inspectorate, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Rotherham - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Rotherham
Received
11 Aug 2025
Validated
13 Aug 2025
Ward
Maltby East Ward
Parish
Maltby
Case officer
Show
Decision
GRANTED
Decision date
2 Oct 2025
Decision level
Delegated (Part 2A)
Applicant
Show
Agent
EvoEnergy Ltd

How this decision compares

Decided in 50 days from validation, 18 days slower than Rotherham's median of 32 for prior approvals. Approved, as 86% of prior approvals here are.

98%decided within 8 weeks
86%approved
54decided in the last year

Plota live figures for prior approvals decided by Rotherham in the last twelve months, from validation. Rotherham decision record →

Consultation & key dates

Consultation
13 Aug 2025
Comments by
10 Sept 2025
Statutory expiry
7 Oct 2025
Rotherham
Planning Authority Score
4.7/10
Below average
#167 of 296 overall
Relevant to this application:
Householder decisions

Rotherham is #107 of 296 councils on householder decision speed. Rotherham is also one of the strictest councils - it refuses more householder applications than almost any other, with only 71% approved vs 90% nationally.

One of the strictest councils
only 71% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
Rotherham decision statistics
Based on MHCLG data, the year to March 2026
79%
Overall approval rate
Below avg (87%) #266 of 296
71%
Householder approved
Below avg (90%) #295 of 296
72%
Decided in 8 weeks
Above avg (63%) #107 of 296
32%
Extended time limit
Below avg (41%) #68 of 296
78%
Minor dwellings approved
63 decided (1-9 homes)
100%
Major dwellings approved
20 decided (10+ homes)
83%
Change of use approved
58 decided
750
Total decisions
156 refused in the year to March 2026