06/26/0628/F - Full Approved

Proposal

Change of use of existing commercial building and associated yard to a sui generis taxi operating base, including taxi control and administrative offices, storage of up to 150 taxi and private-hire vehicles, ancillary vehicle servicing, repairs and MOT testing, use of the existing wash-down area for vehicle cleaning and valeting, installation of a 40,000-litre above-ground double-bunded diesel storage and dispensing tank, and associated staff and visitor parking. Data via plota.co.uk

View original council record ↗Last checked

Great Yarmouth Borough Council is publishing its applications late: so far it has put about half of those it has numbered since early September on its register. Plota adds each one as soon as the council publishes it.

Application progress

✓
Received
6 Aug 2026
✓
Validated
24 Aug 2026
✓
Approved
14 Oct 2026

Approved on 14 Oct 2026 · Officer Delegated Decision · Last checked 15 Nov 2026

Documents 16

Statements & assessments 1

PDF Commenter’s name hidden Show Design & Access Statement (Public) · 13 Aug 2026 View ↗

Plans & drawings 4

PDF Commenter’s name hidden Show Plans (Public) · 10 Aug 2026 View ↗
PDF Commenter’s name hidden Show Plans - Superseded (Public) · 10 Aug 2026 View ↗
PDF Commenter’s name hidden Show Plans (Public) · 10 Aug 2026 View ↗
PDF Commenter’s name hidden Show Plans (Public) · 10 Aug 2026 View ↗

All documents on the council site ↗

Site constraints 7

Article 4 direction
Article 4 Direction - Houses in Multiple Occupation Great Yarmouth. Named permitted development rights are withdrawn here.
An Article 4 direction withdraws particular permitted development rights, so work that would normally need no application needs one here. Not every council has published its directions.
In flood zones plus climate change
Inside the extent flood zones 2 and 3 could reach with climate change: the Central allowance for the 2080s on rivers, the Upper End allowance for sea level rise to 2125. From the sea. Defences are not counted.
The Environment Agency flood map for planning. Councils use it to decide when a flood risk assessment and the sequential test are needed. It is indicative and does not show whether a particular property will flood.
Flood map ↗
National infrastructure project 527 m away: Great Yarmouth Third River Crossing
The site is 527 m from the project boundary. Highway, decided. The project page says whether consent was granted.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Also on the record
Inside the Bradwell (Great Yarmouth) built-up area; Priority habitat 43 m away: Coastal and floodplain grazing marsh; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 3, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 15 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Great Yarmouth - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Full
Postcode
NR31 0NB
Received
6 Aug 2026
Validated
24 Aug 2026
Ward
Bradwell North
Parish
Bradwell North
Case officer
Show
Target decision
19 Oct 2026
Decision
Approve
Decision date
14 Oct 2026
Decision level
Officer Delegated Decision
Applicant
Show
Leaseholder
Show

How this decision compares

Decided in 51 days from validation, 13 days faster than Great Yarmouth's median of 64 for changes of use. Approved, as 59% of changes of use here are.

44%decided within 8 weeks
59%approved
6%go to committee

Plota live figures for changes of use decided by Great Yarmouth in the last twelve months, from validation. Great Yarmouth decision record →

Great Yarmouth
Planning Authority Score
4.4/10
Below average
#181 of 296 overall
Relevant to this application:
Change of use

Great Yarmouth is #125 of 296 councils on householder decision speed. 49% of applications have the time limit extended, above the 41% national average. Householder applications are slightly more likely to be approved here (92%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
Great Yarmouth decision statistics
Based on MHCLG data, the year to March 2026
87%
Overall approval rate
Above avg (87%) #171 of 296
92%
Householder approved
Above avg (90%) #154 of 296
69%
Decided in 8 weeks
Above avg (63%) #125 of 296
49%
Extended time limit
Above avg (41%) #221 of 296
69%
Minor dwellings approved
51 decided (1-9 homes)
78%
Major dwellings approved
9 decided (10+ homes)
89%
Change of use approved
18 decided
366
Total decisions
47 refused in the year to March 2026

Leaseholders: Information produced by HM Land Registry. © Crown copyright 2026. Source: HM Land Registry, UK and overseas companies that own property in England and Wales, September 2026 release.