Howden Dam West Tower Roof,Derwent,, Data via plota.co.uk

NP/HPK/0826/0818 - Listed Building Consent (alter or extend) Approved

Proposal

Listed Building consent - Remedial works required to replace failed and defective flat roof covering to West Tower. Associated timber repairs to structure below where timber decay and rot detected. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
26 Aug 2026
✓
Approved
15 Oct 2026

Approved on 15 Oct 2026 · Last checked 15 Oct 2026

Documents 15

All documents on the council site ↗

Site constraints 9

Peak District National Park
The park authority decides applications here. Great weight to conserving the landscape; major development restricted.
Landscape, scenic beauty and wildlife carry great weight, and major development is only allowed in exceptional circumstances.
Special area of conservation about 11 m away: South Pennine Moors
Work nearby can need a habitats assessment.
Harm to a protected site is only accepted where there is no alternative and an overriding public interest.
Agricultural land, grade 5
Very poor quality farmland, not best and most versatile. Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. Natural England's Provisional ALC map (1:250,000, 1970s) agrees.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
SSSI about 11 m away: Rake Dike SSSI
Natural England may need consulting, depending on what is proposed.
Sites of special scientific interest are the best wildlife and geological sites in the country. Development likely to harm one is rarely permitted.
Habitat network: Other Priority Habitats - NEZ
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Also on the record
Radon affected area, class 2; Nature improvement area: Dark Peak; Priority habitat about 14 m away: Grass moorland; Open access land about 11 m away: Access Land - Combined Open Country, Registered Common Land and Section 16 Dedicated Land. MoD Byelaw, Section 28 Exclusions, Racecourses and Aerodromes and ECP Margin have been removed..
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 17 October 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Peak District - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Listed Building Consent (alter or extend)
Received
26 Aug 2026
Validated
26 Aug 2026
Parish
Hope Woodlands
Case officer
Show
Decision
GRANTED CONDITIONALLY
Decision date
15 Oct 2026
Applicant
Show

How this decision compares

Decided in 50 days from validation, 6 days faster than Peak District's median of 56 for listed building works. Approved, as 89% of listed building works here are.

53%decided within 8 weeks
89%approved
89decided in the last year

Plota live figures for listed building works decided by Peak District in the last twelve months, from validation. Peak District decision record →

Public comments

No public comments yet.

Read the comments on the council site ↗

Consultation & key dates

Consultation
26 Aug 2026
Comments by
25 Sept 2026
Statutory expiry
21 Oct 2026