7 Corchoney Road Cookstown BT80 9HU Data via plota.co.uk

LA09/2026/0993/F - Full Awaiting decision

Proposal

Replacement of temporary tent structure and metal container with a permanent steel frame and metal clad extension to the existing building. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
25 Sept 2026
Decision
Target date was 20 Nov 2026

Under consideration

No decision has been issued yet. Plota predicts a decision between 10 Dec 2026 and 6 Jan 2027, from Mid Ulster's recent commercial and major works.

Site constraints 1

Radon affected area, class 5
An estimated 10 to 30% of homes reach the radon action level. Indicative for the 1 km square, which takes the highest class found in it; a radon test gives the answer for a building.
From the British Geological Survey and UK Health Security Agency indicative atlas. Under building regulations, as the BRE guide BR 211 (2023) sets out, new buildings and extensions need basic radon protection from class 3 in England and Wales and from class 2 in Scotland, and full protection from class 5. The class at the site itself, from the detailed BGS map, decides which.
UKHSA radon ↗
Not affected
Outside flood zones 2 and 3 · No scheduled monument at the site

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Mid Ulster - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Mid Ulster
Application type
Full
Postcode
BT80 9HU
Received
25 Sept 2026
Validated
25 Sept 2026
Ward
Oaklands
Parish
Cookstown
Decision level
Delegated Decision
Applicant
Show
Agent
ARCEN

Decision outlook

Day 59 of the 56-day target. Mid Ulster usually decides commercial and major works by day 96.

Day 5937 days to the predicted decision (day 96)
14%decided within 8 weeks
100%approved
6%go to committee

Plota live figures for commercial and major works decided by Mid Ulster in the last twelve months, from validation. Mid Ulster decision record →

Public comments

No public comments yet.

Last counted 22 Nov 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
DSFX1790265035439
Site or press notice
6 Oct 2026
Env. assessment
No