28 Pinner Road Watford WD19 4ED Data via plota.co.uk

26/00592/FUL - Full Planning Permission Pending consideration

Proposal

Proposed replacement windows Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
30 Jul 2026
✓
Validated
20 Aug 2026
Decision
Expected by 15 Oct 2026

Under consideration

No decision has been issued yet. Plota predicts a decision around 9 Oct 2026, from Watford's recent extensions.

The consultation period closed on 11 Sept 2026.

Site constraints 4

Oxhey conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Council document ↗
Also on the record
Radon affected area, class 2; Inside the Watford (Watford) built-up area; Air quality management area 19 m away: AQMA 3A Chalk Hill and Pinner Road.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Building

Floor area40 m² (431 sq ft)
Energy ratingG (5 out of 100), could reach C
PropertyEnd-terrace maisonette, 2 habitable rooms
BuiltBefore 1900
HeatingNo system present: electric heaters assumed
WallsSolid brick, as built, no insulation (assumed)

From the energy performance certificate lodged in September 2022, the latest held for this property. The building may have changed since. View the certificate

Work with planning data?

Every application in Watford - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Watford
Application type
Full Planning Permission
Postcode
WD19 4ED
Received
30 Jul 2026
Validated
20 Aug 2026
Ward
Oxhey
Target decision
15 Oct 2026
Decision level
Delegated
Applicant
Show
Agent
USL Architects

Decision outlook

Day 50, past Watford's usual 45 days for extensions. 99% are decided within thirteen weeks, so most likely by 19 Nov 2026.

Day 506 days to the 56-day target
92%decided within 8 weeks
79%approved
317decided in the last year

Plota live figures for extensions decided by Watford in the last twelve months, from validation. Watford decision record →

Public comments

No public comments yet.

3 neighbours consulted · Last counted 7 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-15104306
Planning Portal ref
PP-15104306
Comments by
11 Sept 2026
Env. assessment
No
Watford
Planning Authority Score
6.2/10
Average
#96 of 296 councils
Relevant to this application:
Householder decisions

Watford is faster than most councils at deciding householder applications, ranking #41 out of 296. Only 21% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Watford is also one of the strictest councils - it refuses more householder applications than almost any other, with only 81% approved vs 90% nationally.

One of the strictest councils
only 81% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
Watford decision statistics
Based on MHCLG data, the year to March 2026
79%
Overall approval rate
Below avg (87%) #268 of 296
81%
Householder approved
Below avg (90%) #276 of 296
80%
Decided in 8 weeks
Above avg (63%) #41 of 296
21%
Extended time limit
Below avg (41%) #21 of 296
66%
Minor dwellings approved
41 decided (1-9 homes)
100%
Major dwellings approved
5 decided (10+ homes)
43%
Change of use approved
7 decided
526
Total decisions
111 refused in the year to March 2026

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.