The Jungle Kings Road Cleethorpes North East Lincolnshire DN35 0AG Data via plota.co.uk

DM/0440/26/CND - Discharge Condition Approved

Proposal

Details in discharge of Condition 9 (Cycle Parking), 10 (Drainage), 11 (Flood Warning and Evacuation Plan), 13 (Construction Environmental Management Plan) and 14 (Invasive Species Strategy) pursuant to DM/0113/26/FUL Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
18 Jun 2026
✓
Consultation
24 Jun 2026
✓
Validated
10 Aug 2026
✓
Approved
18 Aug 2026

Approved on 18 Aug 2026 · Delegated Decision · Last checked 26 Aug 2026

Documents 18

All documents on the council site ↗

Associated applications 3

Site constraints 6

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Special area of conservation 149 m away: Lincolnshire Coronation Coast
Work nearby can need a habitats assessment.
Harm to a protected site is only accepted where there is no alternative and an overriding public interest.
SSSI 34 m away: Humber Estuary - 2000480 SSSI
Natural England may need consulting, depending on what is proposed.
Sites of special scientific interest are the best wildlife and geological sites in the country. Development likely to harm one is rarely permitted.
Habitat network: Coastal sand dunes
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Also on the record
Inside the Cleethorpes built-up area; Priority habitat 13 m away: Coastal sand dunes.
Not affected
Not green belt · No listed building at the site · No scheduled monument at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Building

Floor area485 m² (5,220 sq ft)
Energy ratingE (asset rating 122)
UseD1 Non-residential Institutions - Libraries Museums and Galleries
HeatingHeating and Natural Ventilation

From the energy performance certificate lodged in June 2018, the latest held for this property. The building may have changed since. View the certificate

Work with planning data?

Every application in North East Lincs - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Discharge Condition
Postcode
DN35 0AG
Received
18 Jun 2026
Validated
10 Aug 2026
Ward
Haverstoe
Case officer
Show
Target decision
5 Oct 2026
Decision
Conditions Complied With
Decision date
18 Aug 2026
Decision level
Delegated Decision
Applicant
Show
Agent
Padel Plan

Public comments

No public comments yet.

Last counted 26 Aug 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-15011125
Planning Portal ref
PP-15011125
Consultation
24 Jun 2026
Comments by
18 Jul 2026
Statutory expiry
5 Oct 2026
Env. assessment
No
North East Lincs
Planning Authority Score
5.3/10
Average
#132 of 296 councils
Relevant to this application:
Householder decisions

North East Lincs ranks #151 out of 296 councils for householder decision speed. 52% of applications have the time limit extended, above the 41% national average. Householder applications are more likely to be approved here than most councils, with a 97% approval rate vs 90% nationally.

More permissive than most councils
97% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
North East Lincs decision statistics
Based on MHCLG data, the year to March 2026
95%
Overall approval rate
Above avg (87%) #22 of 296
97%
Householder approved
Above avg (90%) #35 of 296
64%
Decided in 8 weeks
Above avg (63%) #151 of 296
52%
Extended time limit
Above avg (41%) #235 of 296
95%
Minor dwellings approved
43 decided (1-9 homes)
87%
Major dwellings approved
15 decided (10+ homes)
82%
Change of use approved
22 decided
467
Total decisions
24 refused in the year to March 2026

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.