Kiln Court, 18 Newell Street, London E14 Data via plota.co.uk

PA/25/01856/NC - Full Planning Permission Unknown

Proposal

Proposed works comprise the recovery of the main flat roofs, including the application of tapered insulation, as well as the refurbishment of lower roofs, walkways, and balconies. Thermal insulation will be upgraded where necessary. Rainwater management will be improved by increasing the number and size of outlets across the main roofs, lower roofs, and balconies, with emergency overflows provided. All rainwater pipes will be installed externally. Steel parapet capping sheets will be fitted to all concrete parapet walls. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
around 10 Nov 2025
Decision
Target date was 20 Aug 2026

Under consideration

No decision has been issued yet. Plota predicted a decision around 23 Nov 2026; it is now day 378.

The consultation period closed on 5 Dec 2025.

Documents 77

Plans & drawings 50

PDF 5027479-RDG-XX-RF-PL-B-1101 A KILN - BLOCK A - WEST EXISTING FOURTH FLOOR Current Plan · 11 Nov 2025 View ↗ PDF 5027479-RDG-XX-01-PL-B-1601 A KILN - BLOCK C- EAST EXISTING FIRST FLOOR Current Plan · 11 Nov 2025 View ↗ PDF 5027479-RDG-XX-RF-PL-B-1801 A KILN - BLOCK C- EAST EXISTING FOURTH & ROOF PLAN Current Plan · 11 Nov 2025 View ↗ PDF 5027479-RDG-XX-03-PL-B-1701 A KILN - BLOCK C - EAST EXISTING SECOND & THIRD FLOOR Current Plan · 11 Nov 2025 View ↗ PDF 5027479-RDG-XX-RF-PL-B-1501 A KILN - BLOCK B- NORTH EXISTING ROOF PLAN Current Plan · 11 Nov 2025 View ↗ PDF 5027479-RDG-XX-01-PL-B-1201 A KILN - BLOCK B- NORTH EXISTING GROUND FLOOR Current Plan · 11 Nov 2025 View ↗ PDF 5027479-RDG-XX-03-PL-B-1301 A KILN - BLOCK B - NORTH EXISTIGN SECOND FLOOR Current Plan · 11 Nov 2025 View ↗ PDF 5027479-RDG-XX-01-PL-B-0901 A KILN - BLOCK A - WEST EXISTING GROUND FLOOR Current Plan · 11 Nov 2025 View ↗ PDF 5027479-RDG-XX-03-PL-B-1001 A KILN - BLOCK A - WEST EXISTING SECOND FLOOR Current Plan · 11 Nov 2025 View ↗ PDF 5027479-RDG-XX-01-PL-B-0901 A KILN - BLOCK A - WEST EXISTING FIRST FLOOR Current Plan · 11 Nov 2025 View ↗ PDF 5027479-RDG-XX-01-PL-B-1601 A KILN - BLOCK C- EAST EXISTING GROUND FLOOR Current Plan · 11 Nov 2025 View ↗ PDF 5027479-RDG-XX-03-PL-B-1701 A KILN - BLOCK C - EAST EXISTING SECOND FLOOR Current Plan · 11 Nov 2025 View ↗ PDF 5027479-RDG-XX-RF-PL-B-1501 A KILN - BLOCK B- NORTH EXISTING SIXTH FLOOR Current Plan · 11 Nov 2025 View ↗ PDF 5027479-RDG-XX-05-PL-B-1401 A KILN - BLOCK B- NORTH EXISTING FIFTH FLOOR Current Plan · 11 Nov 2025 View ↗ PDF 5027479-RDG-XX-05-PL-B-1401 A KILN - BLOCK B- NORTH EXISTING FOURTH FLOOR Current Plan · 11 Nov 2025 View ↗ PDF 5027479-RDG-XX-03-PL-B-1301 A KILN - BLOCK B - NORTH EXISTING THIRD FLOOR Current Plan · 11 Nov 2025 View ↗ PDF 5027479-RDG-XX-01-PL-B-1201 A KILN - BLOCK B- NORTH EXISTING FIRST FLOOR Current Plan · 11 Nov 2025 View ↗ PDF 5027479-RDG-XX-RF-PL-B-1101 A KILN - BLOCK A - WEST EXISTING ROOF PLAN Current Plan · 11 Nov 2025 View ↗ PDF 5027479-RDG-XX-03-PL-B-1001 A KILN - BLOCK A - WEST EXISTING THIRD FLOOR Current Plan · 11 Nov 2025 View ↗ PDF 5015868-RDG-Z01-XX-EL-B-0101 EXISTING ELEVATIONS E, F, G & H Current Plan · 11 Nov 2025 View ↗ PDF 5015868-RDG-Z01-XX-EL-B-0100 EXISTING ELEVATIONS A, B, C & D Current Plan · 11 Nov 2025 View ↗ PDF 5015868-RDG-XX-XX-EL-B-0000 PROPOSED ELEVATION H Current Plan · 11 Nov 2025 View ↗ PDF 5015868-RDG-XX-XX-EL-B-0000 PROPOSED ELEVATION D Current Plan · 11 Nov 2025 View ↗ PDF 5015868-RDG-XX-XX-EL-B-0000 PROPOSED ELEVATION G Current Plan · 11 Nov 2025 View ↗ PDF 5015868-RDG-XX-XX-EL-B-0000 PROPOSED ELEVATION F Current Plan · 11 Nov 2025 View ↗ PDF 5015868-RDG-XX-XX-EL-B-0000 PROPOSED ELEVATION E Current Plan · 11 Nov 2025 View ↗ PDF 5015868-RDG-XX-XX-EL-B-0000 PROPOSED ELEVATION C Current Plan · 11 Nov 2025 View ↗ PDF 5015868-RDG-XX-XX-EL-B-0000 PROPOSED ELEVATION B Current Plan · 11 Nov 2025 View ↗ PDF 5015868-RDG-XX-XX-EL-B-0000 PROPOSED ELEVATION A Current Plan · 11 Nov 2025 View ↗ PDF LOCATION PLAN OS Extract · 20 Oct 2025 View ↗ PDF 5027479-RDG-XX-03-PL-B-1001 A KILN - BLOCK A - WEST PROPOSED SECOND AND THIRD FLOOR Current Plan · 20 Oct 2025 View ↗ PDF 5027479-RDG-XX-01-PL-B-0901 A KILN - BLOCK A - WEST PROPOSED GROUND AND FIRST FLOOR Current Plan · 20 Oct 2025 View ↗ PDF 5027479-RDG-XX-03-PL-B-1301 A KILN - BLOCK B - NORTH PROPOSED SECOND AND THIRD FLOOR Current Plan · 20 Oct 2025 View ↗ PDF 5027479-RDG-XX-05-PL-B-1401 A KILN - BLOCK B - NORTH PROPOSED FOURTH AND FIFTH FLOOR Current Plan · 20 Oct 2025 View ↗ PDF 5027479-RDG-XX-01-PL-B-1201 A KILN - BLOCK B - NORTH PROPOSED GROUND AND FIRST FLOOR Current Plan · 20 Oct 2025 View ↗ PDF 5027479-RDG-XX-03-PL-B-1701 A KILN - BLOCK C - EAST PROPOSED SECOND AND THIRD FLOOR Current Plan · 20 Oct 2025 View ↗ PDF 5027479-RDG-XX-01-PL-B-1601 A KILN - BLOCK C - EAST PROPOSED GROUND AND FIRST FLOOR Current Plan · 20 Oct 2025 View ↗ PDF 0202 101.6MM CONTEMPORARY ALUMINUM RAINWATER PIPE Current Plan · 20 Oct 2025 View ↗ PDF 0521 WEATHERSTRUCK COPING AND MASONRY WALL Current Plan · 20 Oct 2025 View ↗ PDF D0000-00W002-001 E PERIMETER KERB - OPTIONS Current Plan · 20 Oct 2025 View ↗ PDF D0000-00W005-002 SURFACE PROTECTION - BENEATH EQUIPMENT Current Plan · 20 Oct 2025 View ↗ PDF D0000-00W007-001 B UPSTAND - SOIL VENT PIPE Current Plan · 20 Oct 2025 View ↗ PDF D0000-00W101-001 UNINSULATED UPSTAND - OPTIONS Current Plan · 20 Oct 2025 View ↗ PDF D0000-00W101-003 UNINSULATED UPSTAND TO DOOR - WINDOW CILL Current Plan · 20 Oct 2025 View ↗ PDF 5015868-RDG-Z01-XX-EL-B-0100 A PROPOSED ELEVATIONS A, B, C AND D Current Plan · 20 Oct 2025 View ↗ PDF 5015868-RDG-Z01-XX-EL-B-0101 A PROPOSED ELEVATIONS E, F, G AND H Current Plan · 20 Oct 2025 View ↗ PDF 5027479-RDG-XX-RF-PL-B-1101 A KILN OAST - BLOCK A- WEST PROPOSED FOURTH FLOOR AND ROOF PLAN Current Plan · 20 Oct 2025 View ↗ PDF 5027479-RDG-XX-RF-PL-B-1501 A KILN - BLOCK B - NORTH PROPOSED SIXTH FLOOR AND ROOF PLAN Current Plan · 20 Oct 2025 View ↗ PDF 5027479-RDG-XX-RF-PL-B-1801 A KILN - BLOCK C - EAST PROPOSED FOURTH FLOOR AND ROOF PLAN Current Plan · 20 Oct 2025 View ↗ PDF LTF-001 MULTI-LAYER BAUDERPIR FA G16 TAPER SCHEME Current Plan · 20 Oct 2025 View ↗

Other documents 20

PDF SPECIFICATION SUMMARY 06 Correspondence · 20 Oct 2025 View ↗ PDF SPECIFICATION SUMMARY 01 Correspondence · 20 Oct 2025 View ↗ PDF SPECIFICATION SUMMARY 02 Correspondence · 20 Oct 2025 View ↗ PDF OVERLAY EXISTING ASPHALT WATERPROOFING SYSTEM UNINSULATED ROOF - SPECIFICATION SUMMARY Correspondence · 20 Oct 2025 View ↗ PDF SPECIFICATION SUMMARY 03 Correspondence · 20 Oct 2025 View ↗ PDF SPECIFICATION SUMMARY 04 Correspondence · 20 Oct 2025 View ↗ PDF SPECIFICATION SUMMARY 05 Correspondence · 20 Oct 2025 View ↗ PDF ROOF 1 WIND LOAD CALCULATION Correspondence · 20 Oct 2025 View ↗ PDF ROOF 2 WIND LOAD CALCULATION Correspondence · 20 Oct 2025 View ↗ PDF ROOF 4 WIND LOAD CALCULATION Correspondence · 20 Oct 2025 View ↗ PDF ROOF 5 WIND LOAD CALCULATION Correspondence · 20 Oct 2025 View ↗ PDF F30 780 DALES WEATHERSTRUCK COPING ANODISED Correspondence · 20 Oct 2025 View ↗ PDF F30-780 DALES WEATHERSTRUCK COPING SYSTEMS Correspondence · 20 Oct 2025 View ↗ PDF HARMER ROOF OUTLETS TECHNICAL BROCHURE Correspondence · 20 Oct 2025 View ↗ PDF R10-370 DALES ALUMINIUM RAINWATER PIPES IN ANODISED FINISH Correspondence · 20 Oct 2025 View ↗ PDF R10-370 DALES ALUMINUM RAINWATER PIPES Correspondence · 20 Oct 2025 View ↗ PDF GRP TRIM LEAFLET Correspondence · 20 Oct 2025 View ↗ PDF SPECIFICATION - APPENDIX 01 Correspondence · 20 Oct 2025 View ↗ PDF SPECIFICATION - APPENDIX 02 Correspondence · 20 Oct 2025 View ↗ PDF KILN COURTS PHOTO SCHEDULE Photo · 20 Oct 2025 View ↗

All documents on the council site ↗

Site constraints 12

St Annes Church conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
In flood zones plus climate change
Inside the extent flood zones 2 and 3 could reach with climate change: the Central allowance for the 2080s on rivers, the Upper End allowance for sea level rise to 2125. From the sea. Defences are not counted.
The Environment Agency flood map for planning. Councils use it to decide when a flood risk assessment and the sequential test are needed. It is indicative and does not show whether a particular property will flood.
Flood map ↗
National infrastructure project: Thames Tideway Tunnel
The site is inside the project boundary. Waste water treatment, decided. The project page says whether consent was granted.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Heritage at risk: St Anne's Church
On the register of historic places assessed as at risk.
A designated building, monument, park or conservation area assessed as at risk from neglect, decay or development. Proposals that secure its future are looked on favourably.
Historic England ↗
Archaeological priority area: Tower Hamlets APA 2.15
An assessment or field evaluation may be asked for before ground works.
The council or Historic England considers archaeology likely here. A desk-based assessment, and sometimes trial trenching, can be asked for with the application.
Air quality management area: Tower Hamlets AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
11 listed buildings within 150 m of the postcode pin
Nearest: 11-23, Newell Street E14, Grade II, about 10 m from the postcode pin · 1 Grade I, 10 Grade II
The site itself is not listed. Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show all 11 with distances
Historic England ↗
Opportunity area
Where the London Plan expects significant growth.
Boundaries are indicative and the borough holds the detailed plan.
Also on the record
Inside the Tower Hamlets built-up area; Public transport access: PTAL 6a (excellent), TfL 2023, for the 100 m square; Priority habitat about 15 m away: Deciduous woodland; Designated open space about 15 m away.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 2 November 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Tower Hamlets - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Full Planning Permission
Received
around 10 Nov 2025
Validated
10 Nov 2025
Ward
Limehouse
Case officer
Show
Target decision
20 Aug 2026
Decision level
Delegated
Applicant
Show
Agent
Ridge and Partners LLP

Decision outlook

Day 378, past the statutory target. 83% of full applications in Tower Hamlets are decided within thirteen weeks; extensions of time are common, and the council need not decide on the day. Last seen undecided on 18 Nov 2026.

Day 378322 days past the 56-day target
60%decided within 8 weeks
86%approved
623decided in the last year

Plota live figures for full applications decided by Tower Hamlets in the last twelve months, from validation. Tower Hamlets decision record →

Consultation & key dates

Comments by
5 Dec 2025
Statutory expiry
5 Jan 2026
Env. assessment
No
Tower Hamlets
Planning Authority Score
3.9/10
Below average
#201 of 296 overall
Relevant to this application:
Householder decisions

Tower Hamlets is slower than most councils at deciding householder applications: #207 of 296 on speed. Householder applications are slightly more likely to be approved here (92%) than the national average (90%).

Slower than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Tower Hamlets decision statistics
Based on MHCLG data, the year to March 2026
84%
Overall approval rate
Below avg (87%) #229 of 296
92%
Householder approved
Above avg (90%) #167 of 296
56%
Decided in 8 weeks
Below avg (63%) #207 of 296
42%
Extended time limit
Above avg (41%) #167 of 296
63%
Minor dwellings approved
52 decided (1-9 homes)
80%
Major dwellings approved
15 decided (10+ homes)
55%
Change of use approved
67 decided
998
Total decisions
164 refused in the year to March 2026