26/02245/FULL - Full Planning Permission Application Approved

Proposal

Variation of Condition 1 of planning permission dated 13th August 2025 (RN: 25/04545/FULL) for, 'Change of use of part-basement, part-ground floor and part-first floor to provide a food hall premises (Sui Generis). Alterations and extensions at roof level, including the creation of a roof terrace, green roof, and replacement of plant; replacement of windows throughout the building, alterations to the ground floor facades, creation of a new terrace at second floor level on Air Street and creation of new cycle facilities.' Namely, removal of office floorspace at Level 7, alterations at roof level including to the roof terrace and green roof and the replacement of plant plus other associated works. (Applicaion under Section 73). Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
2 Apr 2026
✓
Consultation
20 Apr 2026
✓
Approved
10 Jun 2026

Approved on 10 Jun 2026 · Delegated Decision · Last checked 19 Jul 2026

Documents 100

Plans & drawings 81

PDF PROPOSED DEMOLITION ELEVATION - PICCADILLY Drawing · 11 May 2026 View ↗ PDF PROPOSED DEMOLITION ELEVATION - PICCADILLY CIRCUS Drawing · 11 May 2026 View ↗ PDF PROPOSED DEMOLITION ELEVATION - AIR STREET Drawing · 11 May 2026 View ↗ PDF PROPOSED GA PLAN - LEVEL 06 Drawing · 11 May 2026 View ↗ PDF PROPOSED GA PLAN - LEVEL 07 Drawing · 11 May 2026 View ↗ PDF PROPOSED GA PLAN - LEVEL 08 Drawing · 11 May 2026 View ↗ PDF PROPOSED GA ELEVATION - PICCADILLY Drawing · 11 May 2026 View ↗ PDF PROPOSED GA ELEVATION - PICCADILLY CIRCUS Drawing · 11 May 2026 View ↗ PDF PROPOSED GA ELEVATION - REGENT STREET Drawing · 11 May 2026 View ↗ PDF PROPOSED GA ELEVATION - AIR STREET Drawing · 11 May 2026 View ↗ PDF PROPOSED GA SECTION - AA Drawing · 11 May 2026 View ↗ PDF DRAWING REGISTER Background Papers · 11 May 2026 View ↗ PDF DRAWING REGISTER Superseded document · 2 Apr 2026 View ↗ PDF APPROVED DEMOLITION ELEVATION - AIR STREET Drawing · 2 Apr 2026 View ↗ PDF APPROVED DEMOLITION ELEVATION - PICCADILLY CIRCUS Drawing · 2 Apr 2026 View ↗ PDF APPROVED DEMOLITION ELEVATION - PICCADILLY Drawing · 2 Apr 2026 View ↗ PDF APPROVED DEMOLITION ELEVATION - REGENT STREET Drawing · 2 Apr 2026 View ↗ PDF APPROVED DEMOLITION PLAN - LEVEL 00 Drawing · 2 Apr 2026 View ↗ PDF APPROVED DEMOLITION PLAN - LEVEL 01 Drawing · 2 Apr 2026 View ↗ PDF APPROVED DEMOLITION PLAN - LEVEL 02 Drawing · 2 Apr 2026 View ↗ PDF APPROVED DEMOLITION PLAN - LEVEL 03 Drawing · 2 Apr 2026 View ↗ PDF APPROVED DEMOLITION PLAN - LEVEL 04 Drawing · 2 Apr 2026 View ↗ PDF APPROVED DEMOLITION PLAN - LEVEL 05 Drawing · 2 Apr 2026 View ↗ PDF APPROVED DEMOLITION PLAN - LEVEL 06 Drawing · 2 Apr 2026 View ↗ PDF APPROVED DEMOLITION PLAN - LEVEL 07 Drawing · 2 Apr 2026 View ↗ PDF APPROVED DEMOLITION PLAN - LEVEL 08 Drawing · 2 Apr 2026 View ↗ PDF APPROVED DEMOLITION PLAN - LEVEL B1 Drawing · 2 Apr 2026 View ↗ PDF APPROVED DEMOLITION PLAN - LEVEL B2 Drawing · 2 Apr 2026 View ↗ PDF APPROVED GA ELEVATION - AIR STREET Drawing · 2 Apr 2026 View ↗ PDF APPROVED GA ELEVATION - PICCADILLY CIRCUS Drawing · 2 Apr 2026 View ↗ PDF APPROVED GA ELEVATION - PICCADILLY Drawing · 2 Apr 2026 View ↗ PDF APPROVED GA ELEVATION - REGENT STREET Drawing · 2 Apr 2026 View ↗ PDF APPROVED GA PLAN - LEVEL 00 Drawing · 2 Apr 2026 View ↗ PDF APPROVED GA PLAN - LEVEL 01 Drawing · 2 Apr 2026 View ↗ PDF APPROVED GA PLAN - LEVEL 02 Drawing · 2 Apr 2026 View ↗ PDF APPROVED GA PLAN - LEVEL 03 Drawing · 2 Apr 2026 View ↗ PDF APPROVED GA PLAN - LEVEL 04 Drawing · 2 Apr 2026 View ↗ PDF APPROVED GA PLAN - LEVEL 05 Drawing · 2 Apr 2026 View ↗ PDF APPROVED GA PLAN - LEVEL 06 Drawing · 2 Apr 2026 View ↗ PDF APPROVED GA PLAN - LEVEL 07 Drawing · 2 Apr 2026 View ↗ PDF APPROVED GA PLAN - LEVEL 08 Drawing · 2 Apr 2026 View ↗ PDF APPROVED GA PLAN - LEVEL B1 Drawing · 2 Apr 2026 View ↗ PDF APPROVED GA PLAN - LEVEL B2 Drawing · 2 Apr 2026 View ↗ PDF APPROVED GA SECTION - AA Drawing · 2 Apr 2026 View ↗ PDF APPROVED GA SECTION - BB Drawing · 2 Apr 2026 View ↗ PDF APPROVED GA SECTION - CC Drawing · 2 Apr 2026 View ↗ PDF APPROVED GA SECTION - DD Drawing · 2 Apr 2026 View ↗ PDF PROPOSED DEMOLITION ELEVATION - AIR STREET Superseded document · 2 Apr 2026 View ↗ PDF PROPOSED DEMOLITION ELEVATION - PICCADILLY CIRCUS Superseded document · 2 Apr 2026 View ↗ PDF PROPOSED DEMOLITION ELEVATION - PICCADILLY Superseded document · 2 Apr 2026 View ↗ PDF PROPOSED DEMOLITION ELEVATION - REGENT STREET Drawing · 2 Apr 2026 View ↗ PDF PROPOSED DEMOLITION PLAN - LEVEL 00 Drawing · 2 Apr 2026 View ↗ PDF PROPOSED DEMOLITION PLAN - LEVEL 01 Drawing · 2 Apr 2026 View ↗ PDF PROPOSED DEMOLITION PLAN - LEVEL 02 Drawing · 2 Apr 2026 View ↗ PDF PROPOSED DEMOLITION PLAN - LEVEL 03 Drawing · 2 Apr 2026 View ↗ PDF PROPOSED DEMOLITION PLAN - LEVEL 04 Drawing · 2 Apr 2026 View ↗ PDF PROPOSED DEMOLITION PLAN - LEVEL 05 Drawing · 2 Apr 2026 View ↗ PDF PROPOSED DEMOLITION PLAN - LEVEL 06 Drawing · 2 Apr 2026 View ↗ PDF PROPOSED DEMOLITION PLAN - LEVEL 07 Drawing · 2 Apr 2026 View ↗ PDF PROPOSED DEMOLITION PLAN - LEVEL 08 Drawing · 2 Apr 2026 View ↗ PDF PROPOSED DEMOLITION PLAN - LEVEL B1 Drawing · 2 Apr 2026 View ↗ PDF PROPOSED DEMOLITION PLAN - LEVEL B2 Drawing · 2 Apr 2026 View ↗ PDF PROPOSED GA ELEVATION - AIR STREET Superseded document · 2 Apr 2026 View ↗ PDF PROPOSED GA ELEVATION - PICCADILLY CIRCUS Superseded document · 2 Apr 2026 View ↗ PDF PROPOSED GA ELEVATION - PICCADILLY Superseded document · 2 Apr 2026 View ↗ PDF PROPOSED GA ELEVATION - REGENT STREET Superseded document · 2 Apr 2026 View ↗ PDF PROPOSED GA PLAN - LEVEL 00 Drawing · 2 Apr 2026 View ↗ PDF PROPOSED GA PLAN - LEVEL 01 Drawing · 2 Apr 2026 View ↗ PDF PROPOSED GA PLAN - LEVEL 02 Drawing · 2 Apr 2026 View ↗ PDF PROPOSED GA PLAN - LEVEL 03 Drawing · 2 Apr 2026 View ↗ PDF PROPOSED GA PLAN - LEVEL 04 Drawing · 2 Apr 2026 View ↗ PDF PROPOSED GA PLAN - LEVEL 05 Drawing · 2 Apr 2026 View ↗ PDF PROPOSED GA PLAN - LEVEL 06 Superseded document · 2 Apr 2026 View ↗ PDF PROPOSED GA PLAN - LEVEL 07 Superseded document · 2 Apr 2026 View ↗ PDF PROPOSED GA PLAN - LEVEL 08 Superseded document · 2 Apr 2026 View ↗ PDF PROPOSED GA PLAN - LEVEL B1 Drawing · 2 Apr 2026 View ↗ PDF PROPOSED GA PLAN - LEVEL B2 Drawing · 2 Apr 2026 View ↗ PDF PROPOSED GA SECTION - AA Superseded document · 2 Apr 2026 View ↗ PDF PROPOSED GA SECTION - BB Drawing · 2 Apr 2026 View ↗ PDF PROPOSED GA SECTION - CC Drawing · 2 Apr 2026 View ↗ PDF PROPOSED GA SECTION - DD Drawing · 2 Apr 2026 View ↗

All documents on the council site ↗

Associated applications 9

Site constraints 12

Grade II listed: The Quadrant
List entry 1235117 · The pin is inside its outline · 26 more listed buildings within 150 m (2 Grade I, 3 Grade II*, 21 Grade II)
Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show the other 26 with distances
Historic England ↗
Regent Street conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Council document ↗
2 Article 4 directions
Article 4 Basement Development Permitted Rights Removed · Article 4 Direction Class E To C3 In Central Activities Zone. Named permitted development rights are withdrawn here.
An Article 4 direction withdraws particular permitted development rights, so work that would normally need no application needs one here. Not every council has published its directions.
Protected view corridor: 4A.2 Primrose Hill summit to the Palace of Westminster
Inside the landmark viewing corridor of a protected vista. A building that rises above the corridor's threshold height should be refused. How high that is depends on where along the view the site is.
The London Plan (policy HC4) designates strategic views, and the Mayor's London View Management Framework (March 2012) gives 13 of them a protected vista toward St Paul's Cathedral, the Palace of Westminster or the Tower of London. A vista has a threshold height that rises or falls with the line of sight. In the landmark viewing corridor, a building above it would harm the view and should be refused. In the wider setting consultation area around the corridor, a building above it is referred for consultation and its effect on the view is judged. The threshold changes along each view and is set out in the framework. A revised framework is out for consultation until 4 December 2026 and is not yet in force.
London View Management Framework ↗
Archaeological priority area: City of Westminster APA 2.5
An assessment or field evaluation may be asked for before ground works.
The council or Historic England considers archaeology likely here. A desk-based assessment, and sometimes trial trenching, can be asked for with the application.
Air quality management area: Westminster AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Town centre: West End
A designated centre in the London Plan.
Shops, services and active frontages are protected in centres, and main town centre uses are steered here first.
National infrastructure project 532 m away: Thames Tideway Tunnel
The site is 532 m from the project boundary. Waste water treatment, decided. The project page says whether consent was granted. Also within 2 km: London Strategic Heat Main Project (at pre-application, 188 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Central activities zone
The core of central London in the London Plan.
Offices, culture and the other strategic functions of the centre take priority over new housing here.
Also on the record
Registered park or garden 217 m away: St James's Square; Inside the City of Westminster built-up area; Public transport access: PTAL 6b (excellent), TfL 2023, for the 100 m square.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Building

Floor area7,240 m² (77,931 sq ft)
Energy ratingE (asset rating 124)
UseB1 Offices and Workshop businesses
HeatingAir Conditioning

From the energy performance certificate lodged in December 2016, the latest held for this property. The building may have changed since. View the certificate

Work with planning data?

Every application in Westminster - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Full Planning Permission Application
Postcode
W1J 0DD
Received
2 Apr 2026
Validated
2 Apr 2026
Ward
West End
Case officer
Show
Target decision
28 May 2026
Decision
Application Permitted
Decision date
10 Jun 2026
Decision level
Delegated Decision
Applicant
Show
Leaseholder
Show

Consultation & key dates

Alt. reference
PP-14658461
Planning Portal ref
PP-14658461
Comments by
11 May 2026
Site or press notice
20 Apr 2026
Env. assessment
No
Westminster
Planning Authority Score
3.5/10
Below average
#221 of 296 councils
Relevant to this application:
Change of use

Westminster is slower than most councils at deciding householder applications, ranking #258 out of 296. Only 28% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Westminster is also one of the strictest councils - it refuses more householder applications than almost any other, with only 81% approved vs 90% nationally.

One of the strictest councils
only 81% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
Westminster decision statistics
Based on MHCLG data, the year to March 2026
86%
Overall approval rate
Below avg (87%) #201 of 296
81%
Householder approved
Below avg (90%) #277 of 296
44%
Decided in 8 weeks
Below avg (63%) #258 of 296
28%
Extended time limit
Below avg (41%) #46 of 296
83%
Minor dwellings approved
12 decided (1-9 homes)
67%
Major dwellings approved
3 decided (10+ homes)
81%
Change of use approved
133 decided
4,602
Total decisions
648 refused in the year to March 2026

Freehold boundary: © Crown copyright and database rights 2026, HM Land Registry. Polygons © Crown copyright and database rights 2026 Ordnance Survey 100026316. Conditions of use

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.

Leaseholders: Information produced by HM Land Registry. © Crown copyright 2026. Source: HM Land Registry, UK and overseas companies that own property in England and Wales, September 2026 release.