, Land Adjacent To Recreation Field Fillace Park, Horrabridge, Devon, PL20 7TB Data via plota.co.uk

0300/26 - Full Planning Permission Pending Consideration

Proposal

Installation of InPost Parcel lockers Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
13 Aug 2026
✓
Validated
23 Sept 2026
Decision
Expected by 18 Nov 2026

Under consideration

No decision has been issued yet. Plota predicts a decision between 17 Nov 2026 and 22 Dec 2026, from Dartmoor's recent utility and infrastructure works.

Site constraints 5

Dartmoor National Park
The park authority decides applications here. Great weight to conserving the landscape; major development restricted.
Landscape, scenic beauty and wildlife carry great weight, and major development is only allowed in exceptional circumstances.
Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Radon affected area, class 6
An estimated 30% or more of homes reach the radon action level. Indicative for the 1 km square, which takes the highest class found in it; a radon test gives the answer for a building.
From the British Geological Survey and UK Health Security Agency indicative atlas. Under building regulations, as the BRE guide BR 211 (2023) sets out, new buildings and extensions need basic radon protection from class 3 in England and Wales and from class 2 in Scotland, and full protection from class 5. The class at the site itself, from the detailed BGS map, decides which.
UKHSA radon ↗
Also on the record
Inside the Horrabridge built-up area; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 3, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Dartmoor - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Dartmoor
Application type
Full Planning Permission
Postcode
PL20 7TB
Received
13 Aug 2026
Validated
23 Sept 2026
Ward
West Devon
Parish
Horrabridge
Case officer
Show
Target decision
18 Nov 2026
Decision level
Delegated decision
Applicant
Show

Decision outlook

Day 16 of the 56-day target. Dartmoor usually decides utility and infrastructure works by day 62.

Day 1646 days to the predicted decision (day 62)
41%decided within 8 weeks
92%approved
40decided in the last year

Plota live figures for utility and infrastructure works decided by Dartmoor in the last twelve months, from validation. Dartmoor decision record →

Consultation & key dates

Statutory expiry
18 Nov 2026