The National Renewable Energy Centre Narec Test Site Albert Street Blyth Northumberland NE24 1LZ Data via plota.co.uk

25/04567/FUL - Full Application Approved

Proposal

Erection of bespoke manufacturing unit for drive train testing facility including test hall, office space, plant room, external equipment compound with associated access and infrastructure Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
18 Dec 2025
✓
Validated
8 Jan 2026
✓
Consultation
8 Jul 2026
✓
Approved
8 Jul 2026

Approved on 8 Jul 2026 · Delegated Decision · Last checked 1 Aug 2026

Documents 21

All documents on the council site ↗

Site constraints 9

South Bents to Amble across the site
Matters where it crosses or adjoins the site; the route and its margin are protected.
Coal mining development high risk area
Recorded coal mining features at or near the surface. Most planning applications here need a coal mining risk assessment.
From the Mining Remediation Authority, formerly the Coal Authority. The development high risk area marks recorded coal mining features at or near the surface: mine shafts and adits, shallow workings, mine gas and former opencast sites. Most planning applications there need a coal mining risk assessment; householder applications, changes of use and some minor works are exempt. Mine entry positions come from old plans and can be out by several metres, and unrecorded workings can exist anywhere in the coalfield.
Coal mining risk assessments ↗
In flood zones plus climate change
Inside the extent flood zones 2 and 3 could reach with climate change: the Central allowance for the 2080s on rivers, the Upper End allowance for sea level rise to 2125. From the sea. Defences are not counted.
The Environment Agency flood map for planning. Councils use it to decide when a flood risk assessment and the sequential test are needed. It is indicative and does not show whether a particular property will flood.
Flood map ↗
Special protection area 53 m away: Northumberland Marine
Work nearby can need a habitats assessment.
Harm to a protected site is only accepted where there is no alternative and an overriding public interest.
National infrastructure project 564 m away: Port Blyth New Biomass Plant
The site is 564 m from the project boundary. Generating station, decided. The project page says whether consent was granted.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Also on the record
Radon affected area, class 2; SSSI 366 m away: Northumberland Shore SSSI; Inside the Blyth (Northumberland) built-up area.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the Mining Remediation Authority, the Planning Inspectorate, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Northumberland (County) - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Full Application
Postcode
NE24 1LZ
Received
18 Dec 2025
Validated
8 Jan 2026
Ward
Croft
Parish
Blyth
Case officer
Show
Target decision
5 Feb 2026
Decision
Application Permitted
Decision date
8 Jul 2026
Decision level
Delegated Decision
Applicant
Show
Agent
Lichfields

How this decision compares

Decided in 181 days from validation, 125 days slower than Northumberland (County)'s median of 56 for commercial and major works. Approved, as 87% of commercial and major works here are.

55%decided within 8 weeks
87%approved
111decided in the last year

Plota live figures for commercial and major works decided by Northumberland (County) in the last twelve months, from validation. Northumberland (County) decision record →

Public comments

1comment received
1 supporting

62 neighbours consulted · Last counted 1 Aug 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-14552720
Planning Portal ref
PP-14552720
Neighbours
9 Jan 2026
Consultation
8 Jul 2026
Comments by
8 Jul 2026
Site or press notice
14 Jan 2026
Statutory expiry
5 Feb 2026
Env. assessment
No
Northumberland (County)
Planning Authority Score
3.8/10
Below average
#207 of 296 councils
Relevant to this application:
Householder decisions

Northumberland (County) ranks #167 out of 296 councils for householder decision speed. 47% of applications have the time limit extended, above the 41% national average. Householder applications are slightly more likely to be approved here (91%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
Northumberland (County) decision statistics
Based on MHCLG data, the year to March 2026
88%
Overall approval rate
Above avg (87%) #158 of 296
91%
Householder approved
Above avg (90%) #178 of 296
62%
Decided in 8 weeks
Below avg (63%) #167 of 296
47%
Extended time limit
Above avg (41%) #210 of 296
80%
Minor dwellings approved
223 decided (1-9 homes)
89%
Major dwellings approved
36 decided (10+ homes)
86%
Change of use approved
71 decided
2,013
Total decisions
233 refused in the year to March 2026