Stanlow Refinery Oil Sites Road Ellesmere Port CH65 4BD Data via plota.co.uk

26/01255/REM - Approval of Reserved Matters Awaiting decision

Proposal

Details of reserved matters (appearance, layout and scale )for Air Separation Unit, Oxygen and Nitrogen Storage Tanks, and other associated infrastructure following outline approval under - Hybrid Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
24 Apr 2026
✓
Validated
12 Jun 2026
Decision
Target date was 7 Aug 2026

Under consideration

No decision has been issued yet. Plota predicted a decision around 23 Nov 2026; it is now day 164.

The consultation period closed on 16 Jul 2026.

Site constraints 4

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Air quality management area: Thornton le Moors AQMA No. 4
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
National infrastructure project about 1.1 km away: HyNet Carbon Dioxide Pipeline
The site is about 1.1 km from the project boundary. Pipeline, decided. The project page says whether consent was granted. Also within 2 km: Frodsham Solar (awaiting the Secretary of State's decision, about 1.1 km); Stanlow Hydrogen Ready Modular Combined Heat and Power Project (at pre-application, about 79 m); Hynet North West Hydrogen Pipeline (at pre-application, about 1.1 km).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
Inside the Ellesmere Port built-up area.
Not affected
Not green belt · No scheduled monument at the site

Checked on 2 November 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Chester - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Chester
Application type
Approval of Reserved Matters
Postcode
CH65 4BD
Received
24 Apr 2026
Validated
12 Jun 2026
Ward
Gowy Rural
Applicant
Show
Agent
Jason McElhoney

Decision outlook

Day 164, past the statutory target. 63% of commercial and major works in Chester are decided within thirteen weeks; extensions of time are common, and the council need not decide on the day. Last seen undecided on 19 Nov 2026.

Day 164108 days past the 56-day target
41%decided within 8 weeks
94%approved
36decided in the last year

Plota live figures for commercial and major works decided by Chester in the last twelve months, from validation. Chester decision record →

Public comments

No public comments yet.

11 neighbours consulted · Last counted 19 Nov 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-14734480
Planning Portal ref
PP-14734480
Comments by
16 Jul 2026
Env. assessment
No