Development at Land and Buildings on the South West of Brisbane Road Rear of 190, Balfour Road, Ilford Data via plota.co.uk

3404/25 - Full Planning Permission Approved

Proposal

Demolish block of garages. Reinstate pavement and reduction of width of existing means of access to a highway (Brisbane Road). Erection of boarded fencing. Erection of one (one x 2-bedroom) bungalow with associated hard/soft landscaping works, installation of an air source heat pump, EV charging point, car parking, cycle storage, waste/refuse storage and amenity space. (Summary). Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
17 Dec 2025
✓
Consultation
26 Dec 2025
✓
Approved
17 Feb 2026

Approved on 17 Feb 2026 · Delegated C/Signed A. Van Overbeke · Last checked 8 Oct 2026

Associated applications 3

Site constraints 24

LBR LP39 (Nature Conservation and Biodiversity)LBR LP29 (Amenity and Internal Space Standards)LBR LP26 (Promoting High Quality Design)LBR LP24 (Pollution)LBR LP23 (Cycle and Car Parking)LBR LP22 (Promoting Sustainable Transport)LBR LP5 (Dwelling Mix)LBR LP2 (Delivering Housing Growth)LP D3 (Optimising site capacity through the design-led approach)LP D6 (Housing quality and standards)LP D12 (Fire safety)LP D13 (Agent of Change)LP D14 (Noise)LP H1 (Increasing housing supply)LP H2 (Small sites)LP H10 (Housing size mix)LP G6 (Biodiversity and access to nature)LP SI.5 (Water infrastructure)LP T2 (Healthy Streets)LP T5 (Cycling)LP T6.1 (Residential parking)
Air quality management area: Redbridge AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
LBR LP39 (Nature Conservation and Biodiversity)Council record
Recorded by the council for this site.
Council site ↗
LBR LP29 (Amenity and Internal Space Standards)Council record
Recorded by the council for this site.
Council site ↗
LBR LP26 (Promoting High Quality Design)Council record
Recorded by the council for this site.
Council site ↗
LBR LP24 (Pollution)Council record
Recorded by the council for this site.
Council site ↗
LBR LP23 (Cycle and Car Parking)Council record
Recorded by the council for this site.
Council site ↗
LBR LP22 (Promoting Sustainable Transport)Council record
Recorded by the council for this site.
Council site ↗
LBR LP5 (Dwelling Mix)Council record
Recorded by the council for this site.
Council site ↗
LBR LP2 (Delivering Housing Growth)Council record
Recorded by the council for this site.
Council site ↗
LP D3 (Optimising site capacity through the design-led approach)Council record
Recorded by the council for this site.
Council site ↗
LP D6 (Housing quality and standards)Council record
Recorded by the council for this site.
Council site ↗
LP D12 (Fire safety)Council record
Recorded by the council for this site.
Council site ↗
LP D13 (Agent of Change)Council record
Recorded by the council for this site.
Council site ↗
LP D14 (Noise)Council record
Recorded by the council for this site.
Council site ↗
LP H1 (Increasing housing supply)Council record
Recorded by the council for this site.
Council site ↗
LP H2 (Small sites)Council record
Recorded by the council for this site.
Council site ↗
LP H10 (Housing size mix)Council record
Recorded by the council for this site.
Council site ↗
LP G6 (Biodiversity and access to nature)Council record
Recorded by the council for this site.
Council site ↗
LP SI.5 (Water infrastructure)Council record
Recorded by the council for this site.
Council site ↗
LP T2 (Healthy Streets)Council record
Recorded by the council for this site.
Council site ↗
LP T5 (Cycling)Council record
Recorded by the council for this site.
Council site ↗
LP T6.1 (Residential parking)Council record
Recorded by the council for this site.
Council site ↗
Also on the record
Inside the Redbridge built-up area; Public transport access: PTAL 1b (very poor), TfL 2023, for the 100 m square.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Redbridge - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Redbridge
Application type
Full Planning Permission
Received
17 Dec 2025
Validated
17 Dec 2025
Ward
Ilford Town
Case officer
Show
Target decision
10 Feb 2026
Decision
Granted/Approved - with conditions
Decision date
17 Feb 2026
Decision level
Delegated C/Signed A. Van Overbeke
Applicant
Show

How this decision compares

Decided in 62 days from validation, 8 days slower than Redbridge's median of 54 for full applications. Approved, as 55% of full applications here are.

60%decided within 8 weeks
55%approved
549decided in the last year

Plota live figures for full applications decided by Redbridge in the last twelve months, from validation. Redbridge decision record →

Consultation & key dates

Alt. reference
PP-14540193
Comments by
14 Jan 2026
Site or press notice
22 Dec 2025
Statutory expiry
17 Jan 2026
Redbridge
Planning Authority Score
4.5/10
Below average
#174 of 296 councils
Relevant to this application:
Householder decisions

Redbridge ranks #129 out of 296 councils for householder decision speed. Redbridge is also one of the strictest councils - it refuses more householder applications than almost any other, with only 82% approved vs 90% nationally.

One of the strictest councils
only 82% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
Redbridge decision statistics
Based on MHCLG data, the year to March 2026
72%
Overall approval rate
Below avg (87%) #292 of 296
82%
Householder approved
Below avg (90%) #267 of 296
69%
Decided in 8 weeks
Above avg (63%) #129 of 296
34%
Extended time limit
Below avg (41%) #90 of 296
57%
Minor dwellings approved
152 decided (1-9 homes)
83%
Major dwellings approved
12 decided (10+ homes)
32%
Change of use approved
192 decided
1,673
Total decisions
461 refused in the year to March 2026