Asda, 151 East Ferry Road, London, E14 3BT Data via plota.co.uk

PA/26/01459/S - Variation / Removal Condition (TCPA S73) Registered

Proposal

Variation of Condition 2, 36 and 39 of planning permission to increase the number of private homes and reduce the number of affordable homes, and to reconfigure internal layouts and external elevations. This application is accompanied by an Environmental Statement. The description of development of permission dated 01/07/2024 is as follows: 'A hybrid planning application (part detailed, part outline) for the demolition of existing buildings and the comprehensive, mixed-use, re-development of the site, comprising a maximum of 218,991sqm (GEA) of floorspace. Full details are submitted for 526 residential units (Class C3), flexible commercial floorspace, including a new foodstore (17,087sqm GIA - A1-A4/B1/D2), a primary school (D1), community uses (D1), public bus parking and a site wide basement, with associated uses as part of the development including car parking (up to 410 spaces), cycle parking, and an energy centre. Building heights would range between a maximum of 17.4m AOD (3 storeys above ground level) and 60m AOD (15 storeys above ground level). Creation of new vehicular and pedestrian access and public realm works, including all ground floor hard and soft landscaping and other works incidental to the proposals, including a programme of interim works (which include a temporary multi-storey car park with 349 car parking spaces and a temporary access lobby to the retail foodstore). [Detailed Component] Outline permission (with layout, scale, appearance and landscaping at upper levels being reserved) is sought for up to 111,137sqm GEA above podium level, comprising of between 1217 and 1446 residential units (C3), with associated private and communal podium amenity and landscaping, within four buildings with maximum heights ranging between up to 45.850m (AOD)/12 storeys and up to 115.50m (AOD)/32 storeys. [Outline Component]' Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
around 18 Aug 2026
✓
Consultation
18 Sept 2026
Decision
Expected by 8 Dec 2026

Under consideration

No decision has been issued yet. A decision is expected by 8 Dec 2026.

The consultation period closed on 2 Oct 2026.

Documents 228

Statements & assessments 75

PDF ADDENDUM AND RESPONSE TO FINAL REVIEW REPORT - PART 2 Environmental Statement · 20 Aug 2026 View ↗ PDF VOLUME 2: FIGURES - PART 2 Environmental Statement · 20 Aug 2026 View ↗ PDF VOLUME 2: FIGURES - PART 3 Environmental Statement · 20 Aug 2026 View ↗ PDF VOLUME 2: FIGURES - PART 4 Environmental Statement · 20 Aug 2026 View ↗ PDF VOLUME 3: TOWNSCAPE, VISUAL IMPACT AND BUILT HERITAGE ASSESSMENT - PART 1 Environmental Statement · 20 Aug 2026 View ↗ PDF VOLUME 3: TOWNSCAPE, VISUAL IMPACT AND BUILT HERITAGE ASSESSMENT - PART 2 Environmental Statement · 20 Aug 2026 View ↗ PDF VOLUME 3: TOWNSCAPE, VISUAL IMPACT AND BUILT HERITAGE ASSESSMENT - PART 3 Environmental Statement · 20 Aug 2026 View ↗ PDF NON-TECHNICAL SUMMARY Environmental Statement · 20 Aug 2026 View ↗ PDF CHAPTER 18 CUMULATIVE EFFECTS Environmental Statement · 20 Aug 2026 View ↗ PDF CHAPTER 17 GREENHOUSE GASES Environmental Statement · 20 Aug 2026 View ↗ PDF CHAPTER 16 DAYLIGHT, SUNLIGHT Environmental Statement · 20 Aug 2026 View ↗ PDF CHAPTER 15 WIND MICROCLIMATE Environmental Statement · 20 Aug 2026 View ↗ PDF CHAPTER 14 WATER RESOURCES Environmental Statement · 20 Aug 2026 View ↗ PDF CHAPTER 13 ECOLOGY Environmental Statement · 20 Aug 2026 View ↗ PDF CHAPTER 12 HISTORIC ENVIRONMENT Environmental Statement · 20 Aug 2026 View ↗ PDF CHAPTER 11 GROUND CONDITIONS Environmental Statement · 20 Aug 2026 View ↗ PDF CHAPTER 10 NOISE AND VIBRATION Environmental Statement · 20 Aug 2026 View ↗ PDF CHAPTER 09 AIR QUALITY Environmental Statement · 20 Aug 2026 View ↗ PDF CHAPTER 08 TRANSPORTATION Environmental Statement · 20 Aug 2026 View ↗ PDF CHAPTER 07 SOCIO-ECONOMICS Environmental Statement · 20 Aug 2026 View ↗ PDF CHAPTER 06 DEV PROGRAMME Environmental Statement · 20 Aug 2026 View ↗ PDF CHAPTER 05 THE DEVELOPMENT. Environmental Statement · 20 Aug 2026 View ↗ PDF CHAPTER 04 ALTERNATIVES Environmental Statement · 20 Aug 2026 View ↗ PDF CHAPTER 03 EXISTING LAND USE Environmental Statement · 20 Aug 2026 View ↗ PDF CHAPTER 02 EIA METHODOLOGY Environmental Statement · 20 Aug 2026 View ↗ PDF CHAPTER 01 INTRODUCTION Environmental Statement · 20 Aug 2026 View ↗ PDF Planning Statement Planning Statement · 20 Aug 2026 View ↗ PDF LONDON PLAN FIRE STATEMENT - PART 1 Report · 20 Aug 2026 View ↗ PDF LONDON PLAN FIRE STATEMENT - PART 2 Report · 20 Aug 2026 View ↗ PDF LONDON PLAN FIRE STATEMENT - PART 3 Report · 20 Aug 2026 View ↗ PDF LONDON PLAN FIRE STATEMENT - PART 4 Report · 20 Aug 2026 View ↗ PDF LONDON PLAN FIRE STATEMENT - PART 5 Report · 20 Aug 2026 View ↗ PDF APPENDIX 9.3 - AIR QUAILTY NEUTRAL ASSESSMENT Environmental Statement · 20 Aug 2026 View ↗ PDF APPENDIX 9.2 - AIR QUALITY MODELLING STUDY Environmental Statement · 20 Aug 2026 View ↗ PDF APPENDIX 9.1 - AIR QUALITY MONITORING REPORT Environmental Statement · 20 Aug 2026 View ↗ PDF APPENDIX 7.1 - POPULATION YIELD CALCULATION Environmental Statement · 20 Aug 2026 View ↗ PDF APPENDIX 2.3 - SCOPING RESPONSES Environmental Statement · 20 Aug 2026 View ↗ PDF APPENDIX 2.2 - EIA SCOPING OPINION Environmental Statement · 20 Aug 2026 View ↗ PDF APPENDIX 2.1 - EIA SCOPING REPORT Environmental Statement · 20 Aug 2026 View ↗ PDF APPENDIX 18.1 - CUMULATIVE SCHEMES Environmental Statement · 20 Aug 2026 View ↗ PDF APPENDIX 17.1 TO 17.3 - GREENHOUSE GAS Environmental Statement · 20 Aug 2026 View ↗ PDF APPENDIX 16.4 - SUN HOURS ON GROUND Environmental Statement · 20 Aug 2026 View ↗ PDF APPENDIX 16.3 - TRANSIENT OVERSHADOWING Environmental Statement · 20 Aug 2026 View ↗ PDF APPENDIX 16.2 - DAYLIGHT AND SUNLIGHT ASSESSMENT Environmental Statement · 20 Aug 2026 View ↗ PDF APPENDIX 16.1 - DRAWINGS Environmental Statement · 20 Aug 2026 View ↗ PDF APPENDIX 15.1 - WIND_PART 1 Environmental Statement · 20 Aug 2026 View ↗ PDF APPENDIX 15.1 - WIND_PART 2 Environmental Statement · 20 Aug 2026 View ↗ PDF APPENDIX 14.1 - FLOOD RISK ASSESSMENT_PART 3 Environmental Statement · 20 Aug 2026 View ↗ PDF APPENDIX 14.1 - FLOOD RISK ASSESSMENT_PART 2 Environmental Statement · 20 Aug 2026 View ↗ PDF APPENDIX 13.1 - PRELIMINARY ECOLOGICAL APPRAISAL Environmental Statement · 20 Aug 2026 View ↗ PDF APPENDIX 11.1 - PERA_PART 1 Environmental Statement · 20 Aug 2026 View ↗ PDF APPENDIX 11.1 - PERA_PART 2 Environmental Statement · 20 Aug 2026 View ↗ PDF APPENDIX 11.1 -PERA_PART 3 Environmental Statement · 20 Aug 2026 View ↗ PDF APPENDIX 11.1 - PERA_PART 4 Environmental Statement · 20 Aug 2026 View ↗ PDF APPENDIX 10.4 - ROAD TRAFFIC NOISE Environmental Statement · 20 Aug 2026 View ↗ PDF APPENDIX 10.3 - DEMO & CONS ASSESSMENT Environmental Statement · 20 Aug 2026 View ↗ PDF APPENDIX 10.2 - BASELINE NOISE MONITORING 2019 Environmental Statement · 20 Aug 2026 View ↗ PDF APPENDIX 10.1 - ACOUSTIC TERMINOLOGY 2019 Environmental Statement · 20 Aug 2026 View ↗ PDF APPENDIX 12.1 - HE DBA Environmental Statement · 20 Aug 2026 View ↗ PDF STATEMENT OF CONFORMITY AUGUST 2026 S73 AMENDMENTS Environmental Statement · 20 Aug 2026 View ↗ PDF VOLUME 4: TECHNICAL APPENDICES - APPENDIX 1.1 - COMPETENT EXPERTS Environmental Statement · 20 Aug 2026 View ↗ PDF ENVIRONMENTAL IMPACT ASSESSMENT ES STATEMENT OF CONFORMITY Report · 20 Aug 2026 View ↗ PDF VOLUME 2: FIGURES - PART 1 Environmental Statement · 20 Aug 2026 View ↗ PDF ENVIRONMENTAL IMPACT ASSESSMENT ES STATEMENT OF CONFORMITY Report · 20 Aug 2026 View ↗ PDF APPENDIX 13.2 - ARBORICULTURAL IMPACT ASSESSMENT Environmental Statement · 20 Aug 2026 View ↗ PDF APPENDIX 14.1 - FLOOD RISK ASSESSMENT_PART 1 Environmental Statement · 20 Aug 2026 View ↗ PDF PART 1 Design & Access Statement · 19 Aug 2026 View ↗ PDF PART 2 Design & Access Statement · 19 Aug 2026 View ↗ PDF PART 3 Design & Access Statement · 19 Aug 2026 View ↗ PDF PART 4 Design & Access Statement · 19 Aug 2026 View ↗ PDF PART 5 Design & Access Statement · 19 Aug 2026 View ↗ PDF PART 6 Design & Access Statement · 19 Aug 2026 View ↗ PDF PART 7 Design & Access Statement · 19 Aug 2026 View ↗ PDF PART 8 Design & Access Statement · 19 Aug 2026 View ↗ PDF VOLUME 1: MAIN TEXT Environmental Statement · 19 Aug 2026 View ↗

Plans & drawings 132

PDF 1987-00-DR-0005 P04 EXISTING SITE PLAN Current Plan · 20 Aug 2026 View ↗ PDF Drawing/Document Issue Register Drawing/Document Issue Register · 20 Aug 2026 View ↗ PDF 1987-32-DR-0098L-P02 BUILDING L CORES 1-2-3 GROUND FLOOR PLAN Current Plan · 20 Aug 2026 View ↗ PDF 1987-32-DR-0097L-P02 BUILDING L CORE 1 BASEMENT Current Plan · 20 Aug 2026 View ↗ PDF 1987-31-DR-0098K-P02 BUILDING K CORES 1-2 GROUND FLOOR PLAN Current Plan · 20 Aug 2026 View ↗ PDF 1987-31-DR-0097K-P02 BUILDING K CORE 1 BASEMENT Current Plan · 20 Aug 2026 View ↗ PDF 1987-22-DR-0098J-P02 BUILDING J CORES 1-2 GROUND FLOOR PLAN Current Plan · 20 Aug 2026 View ↗ PDF 1987-22-DR-0097J-P02 BUILDING J CORES 1-2 BASEMENT Current Plan · 20 Aug 2026 View ↗ PDF 1987-21-DR-0098H-P02 BUILDING H CORES 1-2-3-4 GROUND FLOOR PLAN Current Plan · 20 Aug 2026 View ↗ PDF 1987-21-DR-0097H-P02 BUILDING H CORES 1-2-3-4 BASEMENT Current Plan · 20 Aug 2026 View ↗ PDF 1987-16-SA-1001-P08 BUILDING F SCHEDULE OF ACCOMMODATION Current Plan · 20 Aug 2026 View ↗ PDF 1987-16-DR-0602-P11 BUILDING F - NORTH AND EAST ELEVATION Current Plan · 20 Aug 2026 View ↗ PDF 1987-16-DR-0601-P10 BUILDING F - SOUTH AND WEST ELEVATION Current Plan · 20 Aug 2026 View ↗ PDF 1987-16-DR-0113-P07 BUILDING F - LEVEL 13 ROOF. Current Plan · 20 Aug 2026 View ↗ PDF 1987-16-DR-0112-P11 BUILDING F - LEVEL 12 Current Plan · 20 Aug 2026 View ↗ PDF 1987-16-DR-0111-P11 BUILDING F - LEVEL 11 Current Plan · 20 Aug 2026 View ↗ PDF 1987-16-DR-0110-P11 BUILDING F - LEVEL 10 Current Plan · 20 Aug 2026 View ↗ PDF 1987-16-DR-0109-P11 BUILDING F - LEVEL 9 Current Plan · 20 Aug 2026 View ↗ PDF 1987-16-DR-0108-P11 BUILDING F - LEVEL 8 Current Plan · 20 Aug 2026 View ↗ PDF 1987-16-DR-0107-P11 BUILDING F - LEVEL 7 Current Plan · 20 Aug 2026 View ↗ PDF 1987-16-DR-0106-P11 BUILDING F - LEVEL 6 Current Plan · 20 Aug 2026 View ↗ PDF 1987-16-DR-0105-P11 BUILDING F - LEVEL 5 Current Plan · 20 Aug 2026 View ↗ PDF 1987-16-DR-0104-P11 BUILDING F - LEVEL 4 Current Plan · 20 Aug 2026 View ↗ PDF 1987-16-DR-0103-P11 BUILDING F - LEVEL 3 Current Plan · 20 Aug 2026 View ↗ PDF 1987-16-DR-0102-P11 BUILDING F - LEVEL 2 Current Plan · 20 Aug 2026 View ↗ PDF 1987-16-DR-0101-P11 BUILDING F - LEVEL 1 Current Plan · 20 Aug 2026 View ↗ PDF 1987-16-DR-0100-P10 BUILDING F - RESIDENTIAL GARDEN LEVEL Current Plan · 20 Aug 2026 View ↗ PDF 1987-16-DR-0099-P07 BUILDING F - BELVEDERE LEVEL Current Plan · 20 Aug 2026 View ↗ PDF 1987-16-DR-0096-P02 BUILDING F - GROUND FLOOR PLAN Current Plan · 20 Aug 2026 View ↗ PDF 1987-16-DR-0095-P02 BUILDING F - BASEMENT LEVEL Current Plan · 20 Aug 2026 View ↗ PDF 1987-15-SA-1001-P13 BUILDING E SCHEDULE OF ACCOMMODATION Current Plan · 20 Aug 2026 View ↗ PDF 1987-15-DR-0602-P12 BUILDING E - EAST AND SOUTH ELEVATIONS Current Plan · 20 Aug 2026 View ↗ PDF 1987-15-DR-0601-P12 BUILDING E - NORTH AND WEST ELEVATIONS Current Plan · 20 Aug 2026 View ↗ PDF 1987-15-DR-0401-P10 BUILDING E - SECTIONS A, B & C Current Plan · 20 Aug 2026 View ↗ PDF 1987-15-DR-0113-P08 BUILDING E - LEVEL 13 ROOF Current Plan · 20 Aug 2026 View ↗ PDF 1987-15-DR-0112-P12 BUILDING E -LEVEL 12 Current Plan · 20 Aug 2026 View ↗ PDF 1987-15-DR-0111-P12 BUILDING E - LEVEL 11 Current Plan · 20 Aug 2026 View ↗ PDF 1987-15-DR-0110-P12 BUILDING E - LEVEL 10 Current Plan · 20 Aug 2026 View ↗ PDF 1987-15-DR-0109-P12 BUILDING E - LEVEL 09 Current Plan · 20 Aug 2026 View ↗ PDF 1987-15-DR-0108-P12 BUILDING E - LEVEL 08 Current Plan · 20 Aug 2026 View ↗ PDF 1987-15-DR-0107-P12 BUILDING E - LEVEL 07 Current Plan · 20 Aug 2026 View ↗ PDF 1987-15-DR-0106-P12 BUILDING E - LEVEL 06 Current Plan · 20 Aug 2026 View ↗ PDF 1987-15-DR-0105-P12 BUILDING E - LEVEL 05 Current Plan · 20 Aug 2026 View ↗ PDF 1987-15-DR-0104-P12 BUILDING E - LEVEL 04 Current Plan · 20 Aug 2026 View ↗ PDF 1987-15-DR-0103-P12 BUILDING E - LEVEL 03 Current Plan · 20 Aug 2026 View ↗ PDF 1987-15-DR-0102-P12 BUILDING E - LEVEL 02 Current Plan · 20 Aug 2026 View ↗ PDF 1987-15-DR-0101-P12 BUILDING E - LEVEL 01 Current Plan · 20 Aug 2026 View ↗ PDF 1987-15-DR-0100-P12 BUILDING E - RESIDENTIAL GARDEN LEVEL Current Plan · 20 Aug 2026 View ↗ PDF 1987-15-DR-0099-P12 BUILDING E - BELVEDERE LEVEL Current Plan · 20 Aug 2026 View ↗ PDF 1987-15-DR-0096-P09 BUILDING E - GROUND FLOOR LEVEL Current Plan · 20 Aug 2026 View ↗ PDF 1987-15-DR-0095-P02 BUILDING E - BASEMENT LEVEL Current Plan · 20 Aug 2026 View ↗ PDF 1987-13-SA-1003-P02 SCHEDULE OF ACCOMMODATION BUILDING C Current Plan · 20 Aug 2026 View ↗ PDF 1987-13-DR-0107 C1-P01 BUILDING C1 LEVEL 07 ROOF Current Plan · 20 Aug 2026 View ↗ PDF 1987-13-DR-0106 C1-P10 BUILDING C1 LEVEL 06 Current Plan · 20 Aug 2026 View ↗ PDF 1987-13-DR-0105 C1-P10 BUILDING C1 LEVEL 05 Current Plan · 20 Aug 2026 View ↗ PDF 1987-13-DR-0104 C1-P10 BUILDING C1 LEVEL 04 Current Plan · 20 Aug 2026 View ↗ PDF 1987-13-DR-0103 C1-P11 BUILDING C1 LEVEL 03 Current Plan · 20 Aug 2026 View ↗ PDF 1987-13-DR-0102 C1-P10 BUILDING C1 LEVEL 02 Current Plan · 20 Aug 2026 View ↗ PDF 1987-13-DR-0101 C1-P10 BUILDING C1 LEVEL 01 Current Plan · 20 Aug 2026 View ↗ PDF 1987-13-DR-0100 C1-P10 BUILDING C1 RESIDENTIAL GARDEN LEVEL Current Plan · 20 Aug 2026 View ↗ PDF 1987-13-DR-0099 C1-P06 BUILDING C1 BELVEDERE LEVEL Current Plan · 20 Aug 2026 View ↗ PDF 1987-13-DR-0098 C1-P02 BUILDING C1 GROUND FLOOR LEVEL Current Plan · 20 Aug 2026 View ↗ PDF 1987-13-DR-0097 C1-P02 BUILDING C1 BASEMENT Current Plan · 20 Aug 2026 View ↗ PDF 1987-12-SA-1002-P02 SCHEDULE OF ACCOMMODATION BUILDING B Current Plan · 20 Aug 2026 View ↗ PDF 1987-12-DR-0602-P11 BUILDINGS B&C - SOUTH AND WEST Current Plan · 20 Aug 2026 View ↗ PDF 1987-12-DR-0601-P11 BUILDINGS B&C - NORTH AND EAST Current Plan · 20 Aug 2026 View ↗ PDF 1987-12-DR-0401-P10 BUILDING B&C - SECTIONS A, BT Current Plan · 20 Aug 2026 View ↗ PDF 1987-12-DR-0107 B2-P01 BUILDING B2 LEVEL 07 ROOF Current Plan · 20 Aug 2026 View ↗ PDF 1987-12-DR-0107 B1-P01 BUILDING B1 LEVEL 07 ROOF Current Plan · 20 Aug 2026 View ↗ PDF 1987-12-DR-0106 B2-P10 BUILDING B2 LEVEL 06 Current Plan · 20 Aug 2026 View ↗ PDF 1987-12-DR-0106 B1-P10 BUILDING B1 LEVEL 06 Current Plan · 20 Aug 2026 View ↗ PDF 1987-12-DR-0105 B2-P10 BUILDING B2 LEVEL 05 Current Plan · 20 Aug 2026 View ↗ PDF 1987-12-DR-0105 B1-P11 BUILDING B1 LEVEL 05 Current Plan · 20 Aug 2026 View ↗ PDF 1987-12-DR-0104 B2-P10 BUILDING B2 LEVEL 04 Current Plan · 20 Aug 2026 View ↗ PDF 1987-12-DR-0104 B1-P11 BUILDING B1 LEVEL 04 Current Plan · 20 Aug 2026 View ↗ PDF 1987-12-DR-0103 B2-P12 BUILDING B2 LEVEL 03 Current Plan · 20 Aug 2026 View ↗ PDF 1987-12-DR-0103 B1-P11 BUILDING B1 LEVEL 03 Current Plan · 20 Aug 2026 View ↗ PDF 1987-12-DR-0102 B2-P09 BUILDING B2 LEVEL 02 Current Plan · 20 Aug 2026 View ↗ PDF 1987-12-DR-0102 B1-P10 BUILDING B1 LEVEL 02 Current Plan · 20 Aug 2026 View ↗ PDF 1987-12-DR-0101 B2-P09 BUILDING B2 LEVEL 01 Current Plan · 20 Aug 2026 View ↗ PDF 1987-12-DR-0101 B1-P09 BUILDING B1 LEVEL 01 Current Plan · 20 Aug 2026 View ↗ PDF 1987-12-DR-0100 B2-P10 BUILDING B2 RESIDENTIAL GARDEN LEVEL Current Plan · 20 Aug 2026 View ↗ PDF 1987-01-DR-0095-P15 SITEWIDE GA PLAN - BASEMENT LEVEL Current Plan · 19 Aug 2026 View ↗ PDF 1987-01-DR-0096-P22 SITEWIDE GA PLAN - GROUND FLOOR LEVEL Current Plan · 19 Aug 2026 View ↗ PDF 1987-01-DR-0098-P16 SITEWIDE GA PLAN - BELVEDERE LEVEL Current Plan · 19 Aug 2026 View ↗ PDF 1987-01-DR-0100-P14 SITEWIDE GA PLAN - RESIDENTIAL GARDEN LEVEL Current Plan · 19 Aug 2026 View ↗ PDF 1987-01-DR-0101-P11 SITEWIDE GA PLAN - LEVEL 01 Current Plan · 19 Aug 2026 View ↗ PDF 1987-01-DR-0102-P11 SITEWIDE GA PLAN - LEVEL 02 Current Plan · 19 Aug 2026 View ↗ PDF 1987-01-DR-0103-P10 SITEWIDE GA PLAN - LEVEL 03 Current Plan · 19 Aug 2026 View ↗ PDF 1987-01-DR-0104-P10 SITEWIDE GA PLAN - LEVEL 04 Current Plan · 19 Aug 2026 View ↗ PDF 1987-01-DR-0105-P10 SITEWIDE GA PLAN - LEVEL 04 Current Plan · 19 Aug 2026 View ↗ PDF 1987-01-DR-0106-P10 SITEWIDE GA PLAN - LEVEL 06 Current Plan · 19 Aug 2026 View ↗ PDF 1987-01-DR-0107-P10 SITEWIDE GA PLAN - LEVEL 07 Current Plan · 19 Aug 2026 View ↗ PDF 1987-03-DR-0308-P04 OUTLINE PLAN - LEVEL 08 Current Plan · 19 Aug 2026 View ↗ PDF 1987-03-DR-0307-P05 OUTLINE PLAN - LEVEL 07 Current Plan · 19 Aug 2026 View ↗ PDF 1987-03-DR-0306-P05 OUTLINE PLAN - LEVEL 06 Current Plan · 19 Aug 2026 View ↗ PDF 1987-03-DR-0305-P04 OUTLINE PLAN - LEVEL 05 Current Plan · 19 Aug 2026 View ↗ PDF 1987-03-DR-0300-P05 OUTLINE PLAN - GARDEN TO 04 Current Plan · 19 Aug 2026 View ↗ PDF 1987-03-DR-0298-P04 OUTLINE PLAN - BELVEDERE Current Plan · 19 Aug 2026 View ↗ PDF 1987-01-DR-0604-P06 SITE WIDE ELEVATION - MUDCHUTE PARK Current Plan · 19 Aug 2026 View ↗ PDF 1987-01-DR-0603-P07 SITE WIDE ELEVATION - NORTH Current Plan · 19 Aug 2026 View ↗ PDF 1987-01-DR-0602-P06 SITE WIDE ELEVATION - FRIARS MEAD Current Plan · 19 Aug 2026 View ↗ PDF 1987-01-DR-0410-P05 SITE WIDE SECTION NORTH-SOUTH Current Plan · 19 Aug 2026 View ↗ PDF 1987-01-DR-0409-P07 SITE WIDE NORTH-WEST TO SOUTH- EAST Current Plan · 19 Aug 2026 View ↗ PDF 1987-01-DR-0408-P06 SITE WIDE SECTION NORTH-SOUTH Current Plan · 19 Aug 2026 View ↗ PDF 1987-01-DR-0407-P06 SITE WIDE SECTION NORTH-SOUTH Current Plan · 19 Aug 2026 View ↗ PDF 1987-01-DR-0130-P10 SITEWIDE GA PLAN - AREA 3 ROOF PLAN Current Plan · 19 Aug 2026 View ↗ PDF 1987-01-DR-0121-P08 SITEWIDE GA PLAN - AREA 2 ROOF PLAN Current Plan · 19 Aug 2026 View ↗ PDF 1987-01-DR-0113-P09 SITEWIDE GA PLAN - AREA 1 ROOF PLAN Current Plan · 19 Aug 2026 View ↗ PDF 1987-01-DR-0112-P10 SITEWIDE GA PLAN - LEVEL 12 Current Plan · 19 Aug 2026 View ↗ PDF 1987-01-DR-0111-P10 SITEWIDE GA PLAN - LEVEL 11 Current Plan · 19 Aug 2026 View ↗ PDF 1987-01-DR-0110-P10 SITEWIDE GA PLAN - LEVEL 10 Current Plan · 19 Aug 2026 View ↗ PDF 1987-01-DR-0109-P10 SITEWIDE GA PLAN - LEVEL 09 Current Plan · 19 Aug 2026 View ↗ PDF 1987-01-DR-0108-P10 SITEWIDE GA PLAN - LEVEL 08 Current Plan · 19 Aug 2026 View ↗ PDF 1987-03-DR-0309-P05 OUTLINE PLAN - BLOCK H ROOF Current Plan · 19 Aug 2026 View ↗ PDF 1987-03-DR-0311-P03 OUTLINE PLAN - BLOCK L ROOF Current Plan · 19 Aug 2026 View ↗ PDF 1987-03-DR-0342-P06 OUTLINE APPLICATION EXTENT SECTION Current Plan · 19 Aug 2026 View ↗ PDF 1987-03-DR-0347-P06 OUTLINE APPLICATION EXTENT SECTION Current Plan · 19 Aug 2026 View ↗ PDF 1987-03-DR-0349-P07 OUTLINE APPLICATION EXTENT SECTION Current Plan · 19 Aug 2026 View ↗ PDF 1987-03-DR-0362-P06 OUTLINE ELEVATION- FRIARS MEAD Current Plan · 19 Aug 2026 View ↗ PDF 1987-03-DR-0363-P06 OUTLINE ELEVATION- NORTH Current Plan · 19 Aug 2026 View ↗ PDF 1987-03-DR-0364-P06 OUTLINE ELEVATION- MUDCHUTE PARK Current Plan · 19 Aug 2026 View ↗ PDF 1987-11-DR-0096-P12 BUILDING A - GROUND FLOOR LEVEL & BASEMENT REFUSE Current Plan · 19 Aug 2026 View ↗ PDF 1987-11-DR-0097-P12 BUILDING A - FIRST FLOOR (UPPER GROUND LEVEL) Current Plan · 19 Aug 2026 View ↗ PDF 1987-11-DR-0098-P13 BUILDING A - SECOND FLOOR (BELVEDERE LEVEL) Current Plan · 19 Aug 2026 View ↗ PDF 1987-11-DR-0100-P11 BUILDING A - THIRD FLOOR (RESI GARDEN LEVEL) Current Plan · 19 Aug 2026 View ↗ PDF 1987-11-DR-0101-P09 BUILDING A - FOURTH FLOOR (LEVEL 01) Current Plan · 19 Aug 2026 View ↗ PDF 1987-12-DR-0097 B1-P02 BUILDING B1 BASEMENT Current Plan · 19 Aug 2026 View ↗ PDF 1987-12-DR-0098 B1-P02 BUILDING B1 GROUND FLOOR LEVEL Current Plan · 19 Aug 2026 View ↗ PDF 1987-12-DR-0099 B1-P10 BUILDING B1 BELVEDERE LEVEL Current Plan · 19 Aug 2026 View ↗ PDF 1987-12-DR-0100 B1-P09 BUILDING B1 RESIDENTIAL GARDEN LEVEL Current Plan · 19 Aug 2026 View ↗ PDF 1987-12-DR-0100 B2-P10 BUILDING B2 RESIDENTIAL GARDEN LEVEL Current Plan · 19 Aug 2026 View ↗

All documents on the council site ↗

Associated applications 7

Site constraints 9

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Article 4 direction
Crossharbour. Named permitted development rights are withdrawn here.
An Article 4 direction withdraws particular permitted development rights, so work that would normally need no application needs one here. Not every council has published its directions.
Archaeological priority area: Tower Hamlets APA 3.1
An assessment or field evaluation may be asked for before ground works.
The council or Historic England considers archaeology likely here. A desk-based assessment, and sometimes trial trenching, can be asked for with the application.
Air quality management area: Tower Hamlets AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Local nature reserve 92 m away: Mudchute Park Farm
Work nearby can need a habitats assessment.
Harm to a protected site is only accepted where there is no alternative and an overriding public interest.
National infrastructure project 493 m away: Thames Tideway Tunnel
The site is 493 m from the project boundary. Waste water treatment, decided. The project page says whether consent was granted. Also within 2 km: Silvertown Tunnel (decided, 1085 m); London Strategic Heat Main Project (at pre-application, 1366 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Opportunity area
Where the London Plan expects significant growth.
Boundaries are indicative and the borough holds the detailed plan.
Also on the record
Inside the Tower Hamlets built-up area; Public transport access: PTAL 5 (very good), TfL 2023, for the 100 m square.
Not affected
Not green belt · No listed building at the site · No scheduled monument at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Sales history 1

Last sold for £125,000,000 in July 2018. Other property, freehold.

9 July 2018£125,000,000Recorded as a transfer outside a standard sale

Sale prices from HM Land Registry's price paid record, matched to this application by its address.

Work with planning data?

Every application in Tower Hamlets - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Variation / Removal Condition (TCPA S73)
Postcode
E14 3BT
Received
around 18 Aug 2026
Validated
18 Aug 2026
Ward
Island Gardens
Case officer
Show
Target decision
8 Dec 2026
Decision level
Strategic Development Committee
Applicant
Show
Agent
DP9
Freehold owner
Show

Consultation & key dates

Comments by
2 Oct 2026
Site or press notice
18 Sept 2026
Statutory expiry
8 Dec 2026
Env. assessment
No
Tower Hamlets
Planning Authority Score
3.9/10
Below average
#201 of 296 councils
Relevant to this application:
Householder decisions

Tower Hamlets is slower than most councils at deciding householder applications, ranking #207 out of 296. Householder applications are slightly more likely to be approved here (92%) than the national average (90%).

Slower than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Tower Hamlets decision statistics
Based on MHCLG data, the year to March 2026
84%
Overall approval rate
Below avg (87%) #229 of 296
92%
Householder approved
Above avg (90%) #167 of 296
56%
Decided in 8 weeks
Below avg (63%) #207 of 296
42%
Extended time limit
Above avg (41%) #167 of 296
63%
Minor dwellings approved
52 decided (1-9 homes)
80%
Major dwellings approved
15 decided (10+ homes)
55%
Change of use approved
67 decided
998
Total decisions
164 refused in the year to March 2026

Sale prices: Contains HM Land Registry data © Crown copyright and database right 2026. This data is licensed under the Open Government Licence v3.0.

Freehold owner and leaseholders: Information produced by HM Land Registry. © Crown copyright 2026. Source: HM Land Registry, UK and overseas companies that own property in England and Wales, September 2026 release.