LA07/2026/1035/F - Full Site Inspection Complete

Proposal

Environmental improvements to Kilkeel Lower Square, Augrim River Walk & Rooney Play Park, to include: replacement of the existing pedestrian footbridge linking the Square to the river walk, resurfacing of asphalt footway and provision of a new footway connection to the ramped footbridge access within the Lower Square car park, enhancement of the riverside walkway to include new pathway surfacing, wildlife friendly lighting, seating, signage and planting along the route of the existing path, and redevelopment of existing play park to include new surfacing, play equipment, fencing and connecting path. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
1 Sept 2026
✓
Validated
4 Sept 2026
✓
Consultation
7 Sept 2026
Decision
Expected by 30 Oct 2026

Under consideration

No decision has been issued yet. Plota predicts a decision between 5 Dec 2026 and 15 Jan 2027, from Newry Mourne Down's recent full applications.

The consultation period closed on 30 Sept 2026.

Documents 45

Statements & assessments 20

PDF El Scheme Preliminary Ecological Appraisal Final V2 Other Supporting Information · 8 Sept 2026 View ↗ PDF Climate Change Statement Other Supporting Information · 4 Sept 2026 View ↗ PDF El Scheme Bat Survey Report Final V2 Other Supporting Information · 4 Sept 2026 View ↗ PDF Kilkeel Eip Planning Design And Access Statement Other Supporting Information · 4 Sept 2026 View ↗ PDF Kilkeel Lower And River Walk, Newry (tree Survey And Aia) Other Supporting Information · 4 Sept 2026 View ↗ PDF Eis Flood Risk Assessment Issue 1 Part1 Redacted Other Supporting Information · 4 Sept 2026 View ↗ PDF 02 existing layout topographical survey Site Layout or Block Plan · 4 Sept 2026 View ↗ PDF 23 eis_flood risk assessment_issue 1_part2_5 Detailed Drawing Plans · 4 Sept 2026 View ↗ PDF 22 eis_flood risk assessment_issue 1_part2_4 Detailed Drawing Plans · 4 Sept 2026 View ↗ PDF 21 eis_flood risk assessment_issue 1_part2_3 Detailed Drawing Plans · 4 Sept 2026 View ↗ PDF 20 eis_flood risk assessment_issue 1_part2_2 Detailed Drawing Plans · 4 Sept 2026 View ↗ PDF 19 eis_flood risk assessment_issue 1_part2_1 Detailed Drawing Plans · 4 Sept 2026 View ↗ PDF 30 eis_flood risk assessment_issue 1_part3_9 Detailed Drawing Plans · 4 Sept 2026 View ↗ PDF 29 eis_flood risk assessment_issue 1_part3_8 Detailed Drawing Plans · 4 Sept 2026 View ↗ PDF 28 eis_flood risk assessment_issue 1_part3_6 Detailed Drawing Plans · 4 Sept 2026 View ↗ PDF 26 eis_flood risk assessment_issue 1_part3_3 Detailed Drawing Plans · 4 Sept 2026 View ↗ PDF 27 eis_flood risk assessment_issue 1_part3_4 Detailed Drawing Plans · 4 Sept 2026 View ↗ PDF 25 eis_flood risk assessment_issue 1_part3_2 Detailed Drawing Plans · 4 Sept 2026 View ↗ PDF 24 eis_flood risk assessment_issue 1_part3_1 Detailed Drawing Plans · 4 Sept 2026 View ↗ PDF eis - topographical survey Detailed Drawing Plans · 4 Sept 2026 View ↗

All documents on the council site ↗

Work with planning data?

Every application in Newry Mourne Down - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Full
Received
1 Sept 2026
Validated
4 Sept 2026
Ward
Kilkeel
Applicant
Show
Agent
Braniff Associates

Decision outlook

Day 35 of the 56-day target. Newry Mourne Down usually decides full applications by day 111.

Day 3576 days to the predicted decision (day 111)
17%decided within 8 weeks
100%approved
44decided in the last year

Plota live figures for full applications decided by Newry Mourne Down in the last twelve months, from validation. Newry Mourne Down decision record →

Consultation & key dates

Neighbours
7 Sept 2026
Consultation
7 Sept 2026
Comments by
30 Sept 2026
Site or press notice
16 Sept 2026