Higher Goonamarth St Austell Cornwall PL25 5RD Data via plota.co.uk
Description
Non Material Amendment in respect of decision dated 18.09.2023, namely Changes to the design of the approved substation buildings. Key changes include a significant reduction in the substation building footprints, some modification to the associated elevations and a slight relocation of the substation footprints. Data via plota.co.uk
Last checked
Associated applications 5
Part of
- AmendmentNon Material Amendment in respect of decision, namely Changes to the design of the approved…This applicationPA25/06067
Site constraints 6
Checked on 2 November 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.
Every application in Cornwall - and every UK council - as a live feed, an API, or a bulk CSV export.
Historical activity at this location
2 nearby applications on record - archival context, not part of the live application.
Nearby activity
Cornwall is faster than most councils at deciding householder applications: #64 of 296 on speed. Householder applications are more likely to be approved here than most councils, with a 97% approval rate vs 90% nationally.
Referenced application
Council archive
Land At Higher Goonamarth Farm St Austell Cornwall PL25 5RD
Erection of two Substations and associated cabling on land at Higher Goonamarth
- Received
- 25 Jul 2023
- Decided
- 18 Sep 2023
- Outcome
- Approved
Land NW Of Carthew Farm At Wheal Martyn Carthew St Austell Cornwall PL26 8XQ
Install single wind turbine with a maximum blade tip height of 135m, with a 3-bladed rotor design, and associated infrastructure including a crane pad, access track, and electrical housing.
- Received
- 13 Jul 2021
- Decided
- 17 Feb 2022
- Outcome
- Approved
