Unit R08 Paddington Station Praed Street London W2 1HB Data via plota.co.uk

26/07539/CLLB - Cert of Law - Prposed works to LB Pending

Proposal

Network Rail contractor to run 125m of white 8mm diameter Openreach fibre telecom cable internally from an existing distribition point in the basement intake room to the fat face store within the station. the cable will be run entirely on existing cable trays, on established cable routes without the need to drill any new holes in brickwork. Please see attacheed annotated photos showing the entire route. We are confident these works are classed as de-minimis however Network Rail consent requires proof of this. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
5 Nov 2026
Decision
Expected by 17 Dec 2026

Under consideration

No decision has been issued yet. Plota predicts a decision between 28 Dec 2026 and 9 Jan 2027, from Westminster's recent utility and infrastructure works.

Site constraints 9

Grade I listed: Paddington Station Including the Lawn, Gwr Office Block on London Street and Offices Along Eastbourne Terrace
List entry 1066881 · The pin is inside its outline · 4 more listed buildings within 150 m (4 Grade II)
Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show the other 4 with distances
Historic England ↗
Bayswater conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Council document ↗
2 Article 4 directions
Article 4 Basement Development Permitted Rights Removed · Article 4 Direction Class E To C3 In Central Activities Zone. Named permitted development rights are withdrawn here.
An Article 4 direction withdraws particular permitted development rights, so work that would normally need no application needs one here. Not every council has published its directions.
Air quality management area: Westminster AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Opportunity area
Where the London Plan expects significant growth.
Boundaries are indicative and the borough holds the detailed plan.
Also on the record
National infrastructure project 870 m away: London Strategic Heat Main Project, at pre-application; Inside the City of Westminster built-up area; Public transport access: PTAL 6b (excellent), TfL 2023, for the 100 m square; Town centre 33 m away: Praed Street/ Paddington.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 7 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Westminster - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Cert of Law - Prposed works to LB
Postcode
W2 1HB
Received
5 Nov 2026
Validated
5 Nov 2026
Ward
Hyde Park
Case officer
Show
Target decision
17 Dec 2026
Applicant
Show

Decision outlook

Day 13 of the 56-day target. Westminster usually decides utility and infrastructure works by day 57.

Day 1344 days to the predicted decision (day 57)
48%decided within 8 weeks
90%approved
500decided in the last year

Plota live figures for utility and infrastructure works decided by Westminster in the last twelve months, from validation. Westminster decision record →

Public comments

No public comments yet.

Last counted 14 Nov 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-15349419
Planning Portal ref
PP-15349419
Env. assessment
No
Westminster
Planning Authority Score
3.5/10
Below average
#221 of 296 councils
Relevant to this application:
Householder decisions

Westminster is slower than most councils at deciding householder applications, ranking #258 out of 296. Only 28% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Westminster is also one of the strictest councils - it refuses more householder applications than almost any other, with only 81% approved vs 90% nationally.

One of the strictest councils
only 81% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
Westminster decision statistics
Based on MHCLG data, the year to March 2026
86%
Overall approval rate
Below avg (87%) #201 of 296
81%
Householder approved
Below avg (90%) #277 of 296
44%
Decided in 8 weeks
Below avg (63%) #258 of 296
28%
Extended time limit
Below avg (41%) #46 of 296
83%
Minor dwellings approved
12 decided (1-9 homes)
67%
Major dwellings approved
3 decided (10+ homes)
81%
Change of use approved
133 decided
4,602
Total decisions
648 refused in the year to March 2026