Former Bank Hill House Bank Hill Woodborough Nottinghamshire NG14 6EF Data via plota.co.uk

2025/0162DOC - Approval of detail reserved by condition Approved

Proposal

Approval of details reserved by conditions 6 (levels), 7 and 10 (highways), 11 (boundary treatment), 12 (landscaping), 13 (materials) and 14 (hard surfacing) of planning permission Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
4 Mar 2025
✓
Validated
14 Apr 2025
✓
Consultation
30 May 2025
✓
Approved
2 Jul 2025

Approved on 2 Jul 2025 · Delegated Decision · Last checked 18 Oct 2026

Associated applications 3

Site constraints 6

Green belt: Derby and Nottingham
Inappropriate development needs very special circumstances.
Green belt policy allows a short list of exceptions, such as limited extensions and replacement buildings. Anything else needs very special circumstances that clearly outweigh the harm. Some green belt land can count as grey belt, where it does not strongly serve the green belt's purposes. The council decides this in its green belt assessment or on each application, so we do not mark it here.
Read the government guidance ↗
Priority habitat: Traditional orchard
A habitat of principal importance. It shapes the ecology work and the biodiversity net gain a scheme has to show.
Agricultural land, grade 3b
Not best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. Natural England's Provisional ALC map (1:250,000, 1970s), which most planning maps still show, had this area as grade 2. The predicted grade is Defra's current estimate; only a site survey settles it.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Habitat network: Traditional orchards
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Also on the record
Radon affected area, class 2; Coalfield, development low risk area.
Not affected
Outside flood zones 2 and 3 · No listed building at the site · No scheduled monument at the site

Checked on 1 November 2026. Historic England, the Environment Agency, Natural England, the Mining Remediation Authority, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Gedling - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Gedling
Application type
Approval of detail reserved by condition
Postcode
NG14 6EF
Received
4 Mar 2025
Validated
14 Apr 2025
Ward
Dumbles Ward 2015
Parish
Woodborough Parish
Case officer
Show
Target decision
9 Jun 2025
Decision
DOC-Acceptable
Decision date
2 Jul 2025
Decision level
Delegated Decision
Applicant
Show
Agent
CBP Architects Ltd

Consultation & key dates

Alt. reference
PP-13822726
Planning Portal ref
PP-13822726
Consultation
30 May 2025
Comments by
20 Jun 2025
Statutory expiry
9 Jun 2025
Env. assessment
No
Gedling
Planning Authority Score
5.5/10
Average
#119 of 296 overall
Relevant to this application:
Major dwellings

Gedling is #162 of 296 councils on householder decision speed. Householder applications are slightly more likely to be approved here (95%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
Gedling decision statistics
Based on MHCLG data, the year to March 2026
94%
Overall approval rate
Above avg (87%) #37 of 296
95%
Householder approved
Above avg (90%) #77 of 296
62%
Decided in 8 weeks
Below avg (63%) #162 of 296
42%
Extended time limit
Above avg (41%) #164 of 296
86%
Minor dwellings approved
37 decided (1-9 homes)
100%
Major dwellings approved
9 decided (10+ homes)
92%
Change of use approved
37 decided
415
Total decisions
26 refused in the year to March 2026