Canalside Wall (N) Islington Tunnel - Danbury St, Danbury Street, London, Data via plota.co.uk

P2026/2659/LBC - Listed Building Approved

Proposal

Intrusive Investigations to Grade II Listed Islington Tunnel and Portals, Compri Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
8 Oct 2026
✓
Consultation
29 Oct 2026
✓
Approved
20 Nov 2026

Approved on 20 Nov 2026 · Last checked 14 Nov 2026

Site constraints 16

Article 4 directionCrossrail 2CITY ROAD - ST JOHNS WOOD 1CITY ROAD - ST JOHNS WOOD 2Regent's Canal (East)Duncan Terrace/Colebrooke RowII
Air quality management area: Islington AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Town centre: Angel
A designated centre in the London Plan.
Shops, services and active frontages are protected in centres, and main town centre uses are steered here first.
Central activities zone
The core of central London in the London Plan.
Offices, culture and the other strategic functions of the centre take priority over new housing here.
Article 4 directionCouncil record
Some permitted development rights are withdrawn. The direction is on the council's register but not published as open data.
Council site ↗
Crossrail 2Council record
Recorded by the council for this site.
Council site ↗
CITY ROAD - ST JOHNS WOOD 1Council record
Recorded by the council for this site.
Council site ↗
CITY ROAD - ST JOHNS WOOD 2Council record
Recorded by the council for this site.
Council site ↗
Regent's Canal (East)Council record
Recorded by the council for this site.
Council site ↗
Duncan Terrace/Colebrooke RowCouncil record
Recorded by the council for this site.
Council site ↗
IICouncil record
Recorded by the council for this site.
Council site ↗
Also on the record
Conservation area 24 m away: Chapel Market/Penton Street; 2 listed buildings within 150 m; Heritage at risk 24 m away: Chapel Market; Inside the Islington built-up area; Public transport access: PTAL 6a (excellent), TfL 2023, for the 100 m square; Designated open space 40 m away.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 1 November 2026. Historic England, the Environment Agency, Natural England, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Islington - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Islington
Application type
Listed Building
Received
8 Oct 2026
Ward
St Peter's & Canalside
Case officer
Show
Target decision
16 Dec 2026
Decision date
20 Nov 2026
Applicant
Show

How this decision compares

Decided in 43 days from validation, 13 days faster than Islington's median of 56 for listed building works. Approved, as 94% of listed building works here are.

50%decided within 8 weeks
94%approved
347decided in the last year

Plota live figures for listed building works decided by Islington in the last twelve months, from validation. Islington decision record →

Consultation & key dates

Alt. reference
PP-15261926
Comments by
18 Nov 2026
Site or press notice
29 Oct 2026
Statutory expiry
18 Nov 2026
Islington
Planning Authority Score
2.9/10
Poor
#237 of 296 overall
Relevant to this application:
Other decisions

Islington is slower than most councils at deciding householder applications: #260 of 296 on speed. 53% of applications have the time limit extended, above the 41% national average. Householder applications are slightly more likely to be approved here (93%) than the national average (90%).

Slower than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Islington decision statistics
Based on MHCLG data, the year to March 2026
89%
Overall approval rate
Above avg (87%) #132 of 296
93%
Householder approved
Above avg (90%) #130 of 296
43%
Decided in 8 weeks
Below avg (63%) #260 of 296
53%
Extended time limit
Above avg (41%) #241 of 296
89%
Minor dwellings approved
499 decided (1-9 homes)
100%
Major dwellings approved
1 decided (10+ homes)
89%
Change of use approved
19 decided
1,488
Total decisions
167 refused in the year to March 2026