Land South Of Fossefield Road Fosse Way Stratton On The Fosse Shepton Mallet Somerset Data via plota.co.uk

2026/0217/FUL - Full Application Approved

Proposal

Temporary Construction Access to Land off Fosseway. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
3 Feb 2026
✓
Validated
19 Feb 2026
✓
Approved
12 May 2026

Approved on 12 May 2026 · Delegated Decision · Last checked 25 Jul 2026

Site constraints 3

Radon affected area, class 6
An estimated 30% or more of homes reach the radon action level. Indicative for the 1 km square, which takes the highest class found in it; a radon test gives the answer for a building.
From the British Geological Survey and UK Health Security Agency indicative atlas. Under building regulations, as the BRE guide BR 211 (2023) sets out, new buildings and extensions need basic radon protection from class 3 in England and Wales and from class 2 in Scotland, and full protection from class 5. The class at the site itself, from the detailed BGS map, decides which.
UKHSA radon ↗
Also on the record
Coalfield, development low risk area; Inside the Midsomer Norton built-up area.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 13 November 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Mining Remediation Authority, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Mendip - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Mendip
Application type
Full Application
Received
3 Feb 2026
Validated
19 Feb 2026
Ward
Mendip Hills Division
Parish
Kilmersdon Parish Council
Case officer
Show
Target decision
16 Apr 2026
Decision
Approval
Decision date
12 May 2026
Decision level
Delegated Decision
Applicant
Show

How this decision compares

Decided in 82 days from validation, 18 days slower than Mendip's median of 64 for full applications. Approved, as 78% of full applications here are.

41%decided within 8 weeks
78%approved
277decided in the last year

Plota live figures for full applications decided by Mendip in the last twelve months, from validation. Mendip decision record →

Consultation & key dates

Alt. reference
PP-14664963
Planning Portal ref
PP-14664963
Comments by
17 Mar 2026
Statutory expiry
16 Apr 2026
Env. assessment
No