Unit 4, Tamworth Logistics Park, Signet Way, Dordon, B78 2FG Data via plota.co.uk
Pending
2026/0493/ADV - Other Development
Description
Display of 2No. Non-illuminated fascia signs to two elevations (Retrospective) Data via plota.co.uk
Historical activity at this location
6 nearby applications on record - archival context, not part of the live application.
Within ~100m
Nearby activity
2024
Approved
Unit 7 And 8 Tamworth Logistics Park Signet Way Dordon Tamworth B78 2FG
Retrospective application for construction and operation of fire suppression water storag…
2024
Approved
Unit 7 And 8 Tamworth Logistics Park Signet Way Dordon Tamworth B78 2FG
Retrospective application for construction and operation of fire suppression water storag…
2021
Approved
Unit 5 Tamworth Logistics Park Signet Way Dordon Tamworth B78 2FG
Advertisement Consent for No.2 non illuminated signs
2021
Approved
Unit 5 Tamworth Logistics Park Signet Way Dordon Tamworth B78 2FG
Advertisement Consent for No.2 non illuminated signs
2021
Approved
Unit 5 - Tamworth Logistics Park Signet Way Dordon Warwickshire B78 2FG
Retrospective application for installation for 14No. 1000 x 500mm Louvre vents installed…
2021
Approved
Unit 5 - Tamworth Logistics Park Signet Way Dordon Warwickshire B78 2FG
Retrospective application for installation for 14No. 1000 x 500mm Louvre vents installed…
North Warwickshire
Planning Authority Score
3.9/10
Below average
#199 of 296 councils
Relevant to this application:
Householder decisions
North Warwickshire is slower than most councils at deciding householder applications, ranking #246 out of 296. The council extends the time limit on 57% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are more likely to be approved here than most councils, with a 97% approval rate vs 90% nationally.
Frequently extends decision deadlines
expect longer than the statutory limit
These figures are council-wide context, not a prediction for this application.
View full council performance
North Warwickshire decision performance
Based on MHCLG data, the year to March 2026
93%
Overall approval rate
Above avg (87%) #63 of 296
97%
Householder approved
Above avg (90%) #37 of 296
48%
Decided in 8 weeks
Below avg (63%) #246 of 296
57%
Extended time limit
Above avg (41%) #258 of 296
84%
Minor dwellings approved
63 decided (1-9 homes)
80%
Major dwellings approved
5 decided (10+ homes)
88%
Change of use approved
26 decided
368
Total decisions
24 refused in the year to March 2026