27 Fir Avenue Bourne Lincolnshire PE10 9RY Data via plota.co.uk

S26/1809 - Householder Awaiting decision

Proposal

One storey side, rear elevation, integrated garage, internal alterations and replacing existing windows with grey upvc windows Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
14 Oct 2026
Decision
Expected by 9 Dec 2026

Under consideration

No decision has been issued yet. Plota predicts a decision between 9 Dec 2026 and 18 Dec 2026, from South Kesteven's recent extensions.

Comments are open until 19 Nov 2026

Comment on this application ↗

Site constraints 1

Also on the record
Inside the Bourne built-up area.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 1 November 2026. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Building

Floor area138 m² (1,485 sq ft)
Energy ratingD (61 out of 100), could reach C
PropertyDetached bungalow, 5 habitable rooms
Built1967 to 1975
HeatingBoiler and radiators, mains gas
WallsCavity wall, filled cavity

From the energy performance certificate lodged in June 2025, the latest held for this property. The building may have changed since. View the certificate

Work with planning data?

Every application in South Kesteven - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Householder
Postcode
PE10 9RY
Received
14 Oct 2026
Validated
14 Oct 2026
Ward
Bourne West Ward
Parish
Bourne Town Council
Case officer
Show
Target decision
9 Dec 2026
Applicant
Show
Agent
Aspect Architectural Design

Decision outlook

Day 35 of the 56-day target. South Kesteven usually decides extensions by day 62.

Day 3527 days to the predicted decision (day 62)
41%decided within 8 weeks
92%approved
378decided in the last year

Plota live figures for extensions decided by South Kesteven in the last twelve months, from validation. South Kesteven decision record →

Public comments

No public comments yet.

8 neighbours consulted · Last counted 14 Nov 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-15207453
Planning Portal ref
PP-15207453
Comments by
19 Nov 2026
Statutory expiry
9 Dec 2026
Env. assessment
No
South Kesteven
Planning Authority Score
2.7/10
Poor
#244 of 296 councils
Relevant to this application:
Householder decisions

South Kesteven is slower than most councils at deciding householder applications, ranking #262 out of 296. The council extends the time limit on 60% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are slightly more likely to be approved here (94%) than the national average (90%).

Frequently extends decision deadlines
expect longer than the statutory limit
These figures are council-wide context, not a prediction for this application. View full council performance
South Kesteven decision statistics
Based on MHCLG data, the year to March 2026
91%
Overall approval rate
Above avg (87%) #100 of 296
94%
Householder approved
Above avg (90%) #118 of 296
43%
Decided in 8 weeks
Below avg (63%) #262 of 296
60%
Extended time limit
Above avg (41%) #270 of 296
69%
Minor dwellings approved
110 decided (1-9 homes)
90%
Major dwellings approved
20 decided (10+ homes)
87%
Change of use approved
55 decided
1,002
Total decisions
95 refused in the year to March 2026

Freehold boundary: © Crown copyright and database rights 2026, HM Land Registry. Polygons © Crown copyright and database rights 2026 Ordnance Survey 100026316. Conditions of use

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.