Camberwell Leisure Centre Artichoke Place London Southwark SE5 8TS Data via plota.co.uk

26/AP/2538 - Certificate of Lawful Dev. - Proposed Approved

Proposal

Lawful Development Certificate (Proposed) confirming that a proposed preliminary phase of development comprising the construction of a new electric substation and relocation of bin storage areas and cycle parking to accommodate an ASHP enclosure constitutes development for the purposes of Section 55 of the Act and a lawful implementation of the planning permission for the purposes of Section 56 of the Act by way of commencement. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
25 Aug 2026
✓
Validated
26 Aug 2026
✓
Approved
20 Oct 2026

Approved on 20 Oct 2026 · Delegated - GOLD · Last checked 21 Oct 2026

Site constraints 10

Grade II listed: Camberwell Public Baths
List entry 1376535 · The pin is inside its outline · 4 more listed buildings within 150 m (4 Grade II)
Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show the other 4 with distances
Historic England ↗
Flood zone 2, rivers and sea
Medium chance: between a 1 in 100 and 1 in 1,000 annual chance from rivers, or 1 in 200 to 1 in 1,000 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Camberwell Green conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Council document ↗
Article 4 direction
Camberwell District Town Centre. Named permitted development rights are withdrawn here.
An Article 4 direction withdraws particular permitted development rights, so work that would normally need no application needs one here. Not every council has published its directions.
Archaeological priority area
An assessment or field evaluation may be asked for before ground works.
The council or Historic England considers archaeology likely here. A desk-based assessment, and sometimes trial trenching, can be asked for with the application.
Air quality management area: Southwark AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Town centre: Camberwell
A designated centre in the London Plan.
Shops, services and active frontages are protected in centres, and main town centre uses are steered here first.
Also on the record
National infrastructure project 1.7 km away: Thames Tideway Tunnel; Inside the Southwark built-up area; Public transport access: PTAL 5 (very good), TfL 2023, for the 100 m square.
Not affected
Not green belt · No scheduled monument at the site

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Southwark - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Southwark
Application type
Certificate of Lawful Dev. - Proposed
Postcode
SE5 8TS
Received
25 Aug 2026
Validated
26 Aug 2026
Ward
St Giles
Case officer
Show
Target decision
20 Oct 2026
Decision
Certificate of Lawfulness Prop- GRANTED
Decision date
20 Oct 2026
Decision level
Delegated - GOLD
Applicant
Show
Agent
RENEW Planning Limited
Freehold owner
Show

How this decision compares

Decided in 55 days from validation, about the council's usual 54 days. Approved, as 88% of utility and infrastructure works here are.

61%decided within 8 weeks
88%approved
78decided in the last year

Plota live figures for utility and infrastructure works decided by Southwark in the last twelve months, from validation. Southwark decision record →

Public comments

No public comments yet.

Last counted 21 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Statutory expiry
20 Oct 2026
Env. assessment
No
Southwark
Planning Authority Score
7/10
Good
#64 of 296 overall
Relevant to this application:
Householder decisions

Southwark is faster than most councils at deciding householder applications: #54 of 296 on speed. Householder applications are slightly more likely to be approved here (95%) than the national average (90%).

Faster than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Southwark decision statistics
Based on MHCLG data, the year to March 2026
92%
Overall approval rate
Above avg (87%) #93 of 296
95%
Householder approved
Above avg (90%) #92 of 296
78%
Decided in 8 weeks
Above avg (63%) #54 of 296
37%
Extended time limit
Below avg (41%) #122 of 296
92%
Minor dwellings approved
259 decided (1-9 homes)
86%
Major dwellings approved
14 decided (10+ homes)
82%
Change of use approved
38 decided
1,622
Total decisions
132 refused in the year to March 2026

Freehold owner and leaseholders: Information produced by HM Land Registry. © Crown copyright 2026. Source: HM Land Registry, UK and overseas companies that own property in England and Wales, September 2026 release.