Redcar Bulk Terminal Redcar Bulk Terminal Redcar Data via plota.co.uk

R/2026/0468/CD - Condition Discharge Approved

Proposal

Discharge of condition 6 (DMP) on planning approval for for Demolition of two existing rail mounted cranes and existing rails (with a combined capacity facilitating the harbour facility’s handling capability of 18.5 million tonnes per annum of bulky cargo); and the erection of two replacement rail mounted cranes and the installation of replacement rails (with a combined capacity facilitating the harbour facility’s handling capability of 18.5 million tonnes per annum of bulky cargo) Data via plota.co.uk

View original council record ↗Last checked

Application progress

Received
5 Jul 2026
Approved

Approved on · Last checked 6 Sept 2026

Associated applications 2

  • Part of

    Fullcouncil archive

    Conditions details submitted for 6

    • ConditionsDischarge of condition 6 (DMP) for Demolition of two existing rail mounted cranes and existing…This applicationR/2026/0468/CD

Site constraints 5

Nutrient neutrality catchment: Teesmouth and Cleveland Coast SPA/Ramsar
New homes and overnight accommodation must show nutrient neutrality before approval.
Natural England advice: extra wastewater in these catchments harms protected habitats, so schemes must offset their nutrient load, usually through credits.
Filey Brigg to Newport Bridge across the site
Matters where it crosses or adjoins the site; the route and its margin are protected.
Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Also on the record
Nature recovery project: Tees Estuary Recovering Nature (TERN); Inside the Redcar built-up area.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 11 September 2026. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Redcar and Cleveland - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Condition Discharge
Postcode
TS6 7RP
Received
5 Jul 2026
Validated
5 Jul 2026
Case officer
Show
Decision
CONDITION DISCHARGE GRANTED
Applicant
Show
Agent
Tetratech
Redcar and Cleveland
Planning Authority Score
6.8/10
Good
#69 of 296 councils
Relevant to this application:
Householder decisions

Redcar and Cleveland ranks #169 out of 296 councils for householder decision speed. Only 30% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Householder applications are slightly more likely to be approved here (96%) than the national average (90%).

Rarely extends deadlines
decisions usually arrive on time
These figures are council-wide context, not a prediction for this application. View full council performance
Redcar and Cleveland decision statistics
Based on MHCLG data, the year to March 2026
96%
Overall approval rate
Above avg (87%) #15 of 296
96%
Householder approved
Above avg (90%) #58 of 296
62%
Decided in 8 weeks
Below avg (63%) #169 of 296
30%
Extended time limit
Below avg (41%) #56 of 296
78%
Minor dwellings approved
18 decided (1-9 homes)
100%
Major dwellings approved
9 decided (10+ homes)
95%
Change of use approved
37 decided
418
Total decisions
16 refused in the year to March 2026