Land Between Little Hale Fen And National Grid Bicker Fen Substation Data via plota.co.uk

B/26/0016 - Consultation to LPA Decided

Proposal

Consultation to BBC under s37 of the Electricity Act 1989 on the proposal to install an electric line above ground Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
15 Jan 2026
Decision
Target date was 14 Mar 2026

Under consideration

No decision has been issued yet. Plota predicted a decision around 23 Nov 2026; it is now day 312.

Site constraints 2

Agricultural land, grade 3a
Best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. Natural England's Provisional ALC map (1:250,000, 1970s), which most planning maps still show, had this area as grade 2. The predicted grade is Defra's current estimate; only a site survey settles it.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
National infrastructure project 43 m away: Heckington Fen Solar Park
The site is 43 m from the project boundary. Generating station, decided. The project page says whether consent was granted. Also within 2 km: Triton Knoll Electrical System (decided, 102 m); Beacon Fen Energy Park (decided, 198 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Boston - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Boston
Application type
Consultation to LPA
Received
15 Jan 2026
Validated
15 Jan 2026
Target decision
14 Mar 2026
Decision level
Delegated Decision
Applicant
Show

Decision outlook

Day 312, past the statutory target. 85% of utility and infrastructure works in Boston are decided within thirteen weeks; extensions of time are common, and the council need not decide on the day. Last seen undecided on 20 Nov 2026.

Day 312256 days past the 56-day target
81%decided within 8 weeks
96%approved
26decided in the last year

Plota live figures for utility and infrastructure works decided by Boston in the last twelve months, from validation. Boston decision record →

Public comments

No public comments yet.

Last counted 20 Nov 2026

Read the comments on the council site ↗

Consultation & key dates

Statutory expiry
14 Mar 2026
Env. assessment
No