Plot C7 St Asaph Business Park, St Asaph, LL17 0JB Data via plota.co.uk

40/2026/0508/AC - Approval of Planning Condition Pending Consideration

Proposal

Manylion gwaith mynediad/priffordd (amod 3) a Datganiad Dull/Asesiad Risg ar gyfer amddiffyn y brif bibell ddwr sy'n croesi'r safle (amod 10) a gyflwynwyd yn unol a chais rhif / Details of access/highway works (condition 3) and Method Statement/Risk Assessment for the protection of the water main crossing the site (condition 10) submitted in accordance with application code no. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
30 Sept 2026
Decision
Expected by 14 Jan 2027

Under consideration

No decision has been issued yet. A decision is expected by 14 Jan 2027.

Site constraints 4

Agricultural land, grade 3a
Best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. A site survey can differ.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
National infrastructure project 113 m away: Awel y Môr Offshore Wind Farm
The site is 113 m from the project boundary. Generating station, decided. The project page says whether consent was granted. Also within 2 km: Mona Offshore Wind Farm (decided, 953 m); North Wales Wind Farms Connection (decided, 1.3 km); SP Mid Wales (Electricity) Connections Project (SP Manweb) (at pre-application, 1.6 km).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
Radon affected area, class 2; Registered park or garden 245 m away: Bodelwyddan Castle.
Not affected
Outside flood zones 2 and 3 · No listed building at the site · No scheduled monument at the site

Checked on 19 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Denbighshire - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Approval of Planning Condition
Postcode
LL17 0JB
Received
30 Sept 2026
Validated
30 Sept 2026
Ward
WD01 - Bodelwyddan
Parish
Bodelwyddan CC (40)
Case officer
Show
Target decision
14 Jan 2027
Decision level
Dirprwyedig/Delegated
Applicant
Show
Agent
Grimster Planning Ltd.

Consultation & key dates

Statutory expiry
14 Jan 2027