Land OS 0188 And 0489 Main Street Glooston Leicestershire Data via plota.co.uk

26/00598/PDN - Permitted Development Notification Approved

Proposal

The Electronic Communications Code (Conditions and restrictions) Regulations 2003 (as amended) - Regulation 5 Notice of Intention to Install Fixed Line Broadband Apparatus (two 10m light wooden poles) - Permitted Development - For information purposes only. This is not an application to which comments can be made. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
21 Apr 2026
✓
Approved
8 May 2026

Approved on 8 May 2026 · Delegated · Last checked 19 Jul 2026

Site constraints 3

Grade II listed: K6 Kiosk
List entry 1252065 · 8 m away · 5 more listed buildings within 150 m (5 Grade II)
Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show the other 5 with distances
Historic England ↗
Agricultural land, grade 3b
Not best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. Natural England's Provisional ALC map (1:250,000, 1970s) agrees.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Also on the record
National infrastructure project: Weston Marsh to East Leicestershire, at pre-application.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Harborough - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Harborough
Application type
Permitted Development Notification
Received
21 Apr 2026
Validated
21 Apr 2026
Ward
Nevill
Parish
Glooston
Case officer
Show
Target decision
19 May 2026
Decision
Permitted Development
Decision date
8 May 2026
Decision level
Delegated
Applicant
Show

How this decision compares

Decided in 17 days from validation, 39 days faster than Harborough's median of 56 for utility and infrastructure works. Approved, as 95% of utility and infrastructure works here are.

53%decided within 8 weeks
95%approved
5%go to committee

Plota live figures for utility and infrastructure works decided by Harborough in the last twelve months, from validation. Harborough decision record →

Consultation & key dates

Statutory expiry
19 May 2026
Env. assessment
No
Harborough
Planning Authority Score
4.2/10
Below average
#187 of 296 overall
Relevant to this application:
Householder decisions

Harborough is slower than most councils at deciding householder applications: #230 of 296 on speed. Householder applications are slightly more likely to be approved here (92%) than the national average (90%).

Slower than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Harborough decision statistics
Based on MHCLG data, the year to March 2026
89%
Overall approval rate
Above avg (87%) #131 of 296
92%
Householder approved
Above avg (90%) #155 of 296
51%
Decided in 8 weeks
Below avg (63%) #230 of 296
38%
Extended time limit
Below avg (41%) #128 of 296
74%
Minor dwellings approved
96 decided (1-9 homes)
67%
Major dwellings approved
12 decided (10+ homes)
76%
Change of use approved
50 decided
814
Total decisions
90 refused in the year to March 2026