Sambuca, WATERGATE BUILDINGS, 57 - 60 Sandhill, Quayside, Newcastle Upon Tyne, NE1 3RG Data via plota.co.uk

2025/0972/01/LBC - Listed Building Consent Approved

Proposal

Listed Building Application: Introduction of handrails internally to the ground floor restaurant and one externally to the entrance. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
26 Jun 2025
✓
Approved
19 Sept 2025

Approved on 19 Sept 2025 · Delegated decision · Last checked 1 Oct 2026

Licence at this address

  • Licence Sambuca Benvenuto Premises licence · in force since 12 May 2015 Licensed hours: alcohol until 23:00 (Fri-Sat 01:00, Sun midnight)

Licensed hours are what the licence permits, not opening times.

Site constraints 10

Grade II listed: Watergate Buildings
List entry 1024780 · The pin is inside its outline · 45 more listed buildings within 150 m (8 Grade I, 8 Grade II*, 28 Grade II)
Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show the other 45 with distances
Historic England ↗
Flood zone 2, rivers and sea
Medium chance: between a 1 in 100 and 1 in 1,000 annual chance from rivers, or 1 in 200 to 1 in 1,000 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Central conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Council document ↗
Scheduled monument 13 m away: Old Tyne Bridge (land arches)
Its setting is a consideration for work nearby.
Nationally important archaeology protected by the Secretary of State. Work that affects the monument or its setting is rarely permitted.
Historic England ↗
Air quality management area: AQMA No.1b (City Centre)
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
World heritage site 60 m away: Frontiers of the Roman Empire (Hadrian's Wall)
Its setting is a consideration for work nearby.
Registered parks and gardens, battlefields, world heritage sites and protected wrecks are designated heritage assets: harm needs clear and convincing justification.
Historic England ↗
Also on the record
Hadrian's Wall Path 27 m away; Coalfield, development low risk area; Inside the Newcastle upon Tyne built-up area; Flood defence 34 m away (natural high ground, designed for a 1 in 25 year flood).
Not affected
Not green belt

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England, the Mining Remediation Authority and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Newcastle upon Tyne - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Listed Building Consent
Postcode
NE1 3RG
Received
26 Jun 2025
Validated
26 Jun 2025
Ward
y_Monument (up to May 2026)
Parish
Not Within A Parish Boundary
Case officer
Show
Target decision
21 Aug 2025
Decision
Grant Conditionally
Decision date
19 Sept 2025
Decision level
Delegated decision
Applicant
Show
Agent
Collaborative Design
Leaseholder
Show

How this decision compares

Decided in 85 days from validation, 20 days slower than Newcastle upon Tyne's median of 65 for listed building works. Approved, as 98% of listed building works here are.

36%decided within 8 weeks
98%approved
200decided in the last year

Plota live figures for listed building works decided by Newcastle upon Tyne in the last twelve months, from validation. Newcastle upon Tyne decision record →

Consultation & key dates

Statutory expiry
21 Aug 2025
Newcastle upon Tyne
Planning Authority Score
4.9/10
Below average
#154 of 296 overall
Relevant to this application:
Other decisions

Newcastle upon Tyne is slower than most councils at deciding householder applications: #205 of 296 on speed. Householder applications are slightly more likely to be approved here (95%) than the national average (90%).

Slower than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Newcastle upon Tyne decision statistics
Based on MHCLG data, the year to March 2026
90%
Overall approval rate
Above avg (87%) #113 of 296
95%
Householder approved
Above avg (90%) #86 of 296
56%
Decided in 8 weeks
Below avg (63%) #205 of 296
42%
Extended time limit
Above avg (41%) #165 of 296
84%
Minor dwellings approved
37 decided (1-9 homes)
95%
Major dwellings approved
22 decided (10+ homes)
71%
Change of use approved
70 decided
1,005
Total decisions
103 refused in the year to March 2026

Leaseholders: Information produced by HM Land Registry. © Crown copyright 2026. Source: HM Land Registry, UK and overseas companies that own property in England and Wales, September 2026 release.