NP/DDD/0725/0663 - Listed Building Consent (alter or extend) Approved

Proposal

Listed Building consent - Minor alterations to existing office room and tea point facility, to include new subdividing stud wall, upgrades to fixtures and fittings, and redecoration works. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
2 Jul 2025
✓
Validated
23 Jul 2025
✓
Approved
13 Oct 2025

Approved on 13 Oct 2025 · Last checked 15 Oct 2026

Planning committee

Decided by Peak District Planning Committee on 10 Oct 2025.

Approved

As officers recommended.

  • Officers advised approval because the minor harm to the ceiling would be outweighed by public benefits and other works would enhance the building.
  • The town council had no objections, while no representations were received.
Read how the committee decided The proposal, site history, officers’ assessment, consultation, public views, committee debate, vote and decision.

Source: Plota analysis of Peak District's committee minutes of 10 Oct 2025.

Site constraints 6

Peak District National Park
The park authority decides applications here. Great weight to conserving the landscape; major development restricted.
Landscape, scenic beauty and wildlife carry great weight, and major development is only allowed in exceptional circumstances.
1 listed building within 150 m of the postcode pin
Nearest: Aldern House (Eastern Part Only), Grade II, about 4 m from the postcode pin
The site itself is not listed. Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Historic England ↗
Radon affected area, class 6
An estimated 30% or more of homes reach the radon action level. Indicative for the 1 km square, which takes the highest class found in it; a radon test gives the answer for a building.
From the British Geological Survey and UK Health Security Agency indicative atlas. Under building regulations, as the BRE guide BR 211 (2023) sets out, new buildings and extensions need basic radon protection from class 3 in England and Wales and from class 2 in Scotland, and full protection from class 5. The class at the site itself, from the detailed BGS map, decides which.
UKHSA radon ↗
Also on the record
Inside the Bakewell built-up area; Priority habitat about 45 m away: Deciduous woodland; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 4, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 17 October 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Building

Floor area103 m² (1,109 sq ft)
Energy ratingC (72 out of 100), could reach B
PropertySemi-detached house, 4 habitable rooms
Built1930 to 1949
HeatingBoiler and radiators, mains gas
WallsCavity wall, filled cavity

From the energy performance certificate lodged in February 2013, the latest held for this property. The building may have changed since. View the certificate

Work with planning data?

Every application in Peak District - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Listed Building Consent (alter or extend)
Received
2 Jul 2025
Validated
23 Jul 2025
Parish
Bakewell
Case officer
Show
Decision
GRANTED CONDITIONALLY
Decision date
13 Oct 2025
Applicant
Show

How this decision compares

Decided in 82 days from validation, 26 days slower than Peak District's median of 56 for listed building works. Approved, as 89% of listed building works here are.

53%decided within 8 weeks
89%approved
89decided in the last year

Plota live figures for listed building works decided by Peak District in the last twelve months, from validation. Peak District decision record →

Consultation & key dates

Consultation
28 Jul 2025
Comments by
1 Sept 2025
Statutory expiry
16 Sept 2025

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.