Land Adjacent Short Furlong Short Furlong Beer Data via plota.co.uk

26/1544/VAR - Variation of Condition Awaiting decision

Proposal

Variation of conditions 5 (Construction Management Plan), 11 (temporary surface water management system for construction period) and 17 (lighting scheme for construction period) of planning permission (Construction of up to 30 new dwellings (including affordable housing provision) outline application with all matters apart from access reserved) to move the trigger point from 'prior to commencement' to 'other than the excavation of the first 5m of the approved access into the site, together with installation of associated subbase, no other development shall commence until ...' Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
31 Jul 2026
Decision
Expected by 25 Sept 2026

Under consideration

No decision has been issued yet. A decision is expected by 25 Sept 2026.

Associated applications 2

  • Part of

    OutlineApprovedcouncil archive

    Conditions 5, 11, 17 variation sought

    • VariationVariation of conditions 5 (Construction Management Plan), 11 (temporary surface water…This application26/1544/VAR

Site constraints 7

East Devon National Landscape
Great weight to conserving the landscape; major development restricted.
Previously an area of outstanding natural beauty, which is still the designation in law. Since 2023 authorities must seek to further its purpose, not merely have regard to it.
Heritage coast: East Devon
A defined stretch of undeveloped coastline.
Development inconsistent with keeping the coast undeveloped is resisted.
Agricultural land, grade 4
Poor quality farmland, not best and most versatile. Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. Natural England's Provisional ALC map (1:250,000, 1970s), which most planning maps still show, had this area as grade 3. The predicted grade is Defra's current estimate; only a site survey settles it.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Habitat network: Network Enhancement Zone 1
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Radon affected area, class 5
An estimated 10 to 30% of homes reach the radon action level. Indicative for the 1 km square, which takes the highest class found in it; a radon test gives the answer for a building.
From the British Geological Survey and UK Health Security Agency indicative atlas. Under building regulations, as the BRE guide BR 211 (2023) sets out, new buildings and extensions need basic radon protection from class 3 in England and Wales and from class 2 in Scotland, and full protection from class 5. The class at the site itself, from the detailed BGS map, decides which.
UKHSA radon ↗
Also on the record
1 listed building within 150 m; Conservation area 96 m away: Beer.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in East Devon - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
East Devon
Application type
Variation of Condition
Received
31 Jul 2026
Validated
31 Jul 2026
Ward
Beer And Branscombe
Parish
Beer
Applicant
Show
Agent
PCL Planning Ltd

Public comments

3comments received
3 objecting

100% object · above the UK average of 74%

49 neighbours consulted · Last counted 7 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-15102289
Planning Portal ref
PP-15102289
Site or press notice
12 Aug 2026
Env. assessment
No
East Devon
Planning Authority Score
6.7/10
Good
#72 of 296 councils
Relevant to this application:
Householder decisions

East Devon ranks #103 out of 296 councils for householder decision speed. Householder applications are slightly more likely to be approved here (94%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
East Devon decision statistics
Based on MHCLG data, the year to March 2026
88%
Overall approval rate
Above avg (87%) #152 of 296
94%
Householder approved
Above avg (90%) #104 of 296
72%
Decided in 8 weeks
Above avg (63%) #103 of 296
34%
Extended time limit
Below avg (41%) #86 of 296
63%
Minor dwellings approved
168 decided (1-9 homes)
74%
Major dwellings approved
23 decided (10+ homes)
88%
Change of use approved
25 decided
1,321
Total decisions
157 refused in the year to March 2026