30 Omega Business Park Neptune Street Kingston Upon Hull HU3 2BP Data via plota.co.uk

25/00076/PD - permitted development enquiry Decided

Proposal

Extension to existing industrial unit Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
23 Jan 2025
✓
Advice Given
14 Feb 2025

Advice Given on 14 Feb 2025 · Delegated Decision · Last checked 18 Oct 2026

Site constraints 7

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Air quality management area: Hull AQMA No.1(A)
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
National infrastructure project 21 m away: A63 Castle Street Improvement-Hull
The site is 21 m from the project boundary. Highway, decided. The project page says whether consent was granted.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Special area of conservation 224 m away: Humber Estuary
Work nearby can need a habitats assessment.
Harm to a protected site is only accepted where there is no alternative and an overriding public interest.
Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Also on the record
SSSI 224 m away: Humber Estuary - 2000480 SSSI; Inside the Kingston upon Hull built-up area.
Not affected
Not green belt · No listed building at the site · No scheduled monument at the site

Checked on 1 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Hull - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Hull
Application type
permitted development enquiry
Postcode
HU3 2BP
Received
23 Jan 2025
Validated
23 Jan 2025
Ward
St Andrews And Dockland
Case officer
Show
Decision
Advice Given
Decision date
14 Feb 2025
Decision level
Delegated Decision
Agent
Innovation Architecture

Public comments

No public comments yet.

Last counted 18 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
EM
Env. assessment
No
Hull
Planning Authority Score
2.6/10
Poor
#248 of 296 overall
Relevant to this application:
Householder decisions

Hull is slower than most councils at deciding householder applications: #231 of 296 on speed. The council extends the time limit on 62% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are slightly more likely to be approved here (92%) than the national average (90%).

Frequently extends decision deadlines
expect longer than the statutory limit
These figures are council-wide context, not a prediction for this application. View full council performance
Hull decision statistics
Based on MHCLG data, the year to March 2026
92%
Overall approval rate
Above avg (87%) #85 of 296
92%
Householder approved
Above avg (90%) #156 of 296
51%
Decided in 8 weeks
Below avg (63%) #231 of 296
62%
Extended time limit
Above avg (41%) #273 of 296
88%
Minor dwellings approved
16 decided (1-9 homes)
86%
Major dwellings approved
14 decided (10+ homes)
88%
Change of use approved
33 decided
436
Total decisions
36 refused in the year to March 2026

Freehold boundary: © Crown copyright and database rights 2026, HM Land Registry. Polygons © Crown copyright and database rights 2026 Ordnance Survey 100026316. Conditions of use