Land At Park Road Little Easton Essex Data via plota.co.uk

UTT/26/2871/OHL - Overhead Power Lines Awaiting decision

Proposal

Notification under the Electricity Act 1989 Overhead Line (Exemption) (England & Wales) Regulations 2009 Statutory Instrument 2009 No. 640 Electricity, Paragraph 3 (1) - Upgrade existing HV spans between 320582 & 320584 to three phase 50AAAC, upgrade existing Park Road Footpath pole to 100kVA to three phase, restring two spans of existing low voltage overhead to 95ABC 4W between poles 376844 and 376849 and install LV underground cable Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
12 Nov 2026
Decision
Expected by 24 Dec 2026

Under consideration

No decision has been issued yet. Plota predicts a decision around 31 Dec 2026, from Uttlesford's recent utility and infrastructure works.

Site constraints 2

Agricultural land, grade 3a
Best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. Natural England's Provisional ALC map (1:250,000, 1970s) agrees.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Habitat network: Network Enhancement Zone 1
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 14 November 2026. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Uttlesford - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Uttlesford
Application type
Overhead Power Lines
Received
12 Nov 2026
Validated
12 Nov 2026
Ward
Thaxted And The Eastons
Parish
Little Easton
Target decision
24 Dec 2026
Decision level
Delegated Decision
Applicant
Show

Decision outlook

Day 11 of the 56-day target. Uttlesford usually decides utility and infrastructure works by day 49.

Day 1145 days to the 56-day target
83%decided within 8 weeks
94%approved
54decided in the last year

Plota live figures for utility and infrastructure works decided by Uttlesford in the last twelve months, from validation. Uttlesford decision record →

Public comments

No public comments yet.

Last counted 21 Nov 2026

Read the comments on the council site ↗

Consultation & key dates

Statutory expiry
24 Dec 2026
Env. assessment
No
Uttlesford
Planning Authority Score
6.2/10
Average
#95 of 296 overall
Relevant to this application:
Householder decisions

Uttlesford is faster than most councils at deciding householder applications: #31 of 296 on speed. Only 25% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Uttlesford is also one of the strictest councils - it refuses more householder applications than almost any other, with only 82% approved vs 90% nationally.

One of the strictest councils
only 82% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
Uttlesford decision statistics
Based on MHCLG data, the year to March 2026
77%
Overall approval rate
Below avg (87%) #280 of 296
82%
Householder approved
Below avg (90%) #272 of 296
82%
Decided in 8 weeks
Above avg (63%) #31 of 296
25%
Extended time limit
Below avg (41%) #33 of 296
71%
Minor dwellings approved
276 decided (1-9 homes)
87%
Major dwellings approved
23 decided (10+ homes)
64%
Change of use approved
28 decided
1,247
Total decisions
288 refused in the year to March 2026