Former LEB Site, 255-279 Cambridge Heath Road, London, E2 0EL Data via plota.co.uk

PA/25/01931/NC - Screening Opinion (EIA Regs) Decided

Proposal

Request for Screening Opinion as to whether an Environmental Impact Assessment (EIA) is required in accordance with the Town and Country Planning (Environmental Impact Assessment) Regulations 2017 (as amended) (the 'EIA Regulations') for the demolition of the existing buildings on site and the construction of a single building with stepped massing of up to 11 storeys in height consisting of the following: ? Provision of up to 550 purpose-built student accommodation units (PBSA); ? Provision of up to 400m2 employment generating floorspace (likely to come forward as commercial and community floorspace as Use Class E / F1 / F2); ? Provision of 2 blue badge parking spaces and up to 220 cycle parking spaces; and ? Associated public realm, amenity space and associated landscaping. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
around 4 Nov 2025
✓
EIA not required
25 Nov 2025

EIA not required on 25 Nov 2025 · Delegated · Last checked 1 Nov 2026

Site constraints 12

Archaeological priority area: Tower Hamlets APA 2.4
An assessment or field evaluation may be asked for before ground works.
The council or Historic England considers archaeology likely here. A desk-based assessment, and sometimes trial trenching, can be asked for with the application.
Air quality management area: Tower Hamlets AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
11 listed buildings within 150 m
Nearest: K2 Telephone Kiosk Outside Number 289, Grade II, 55 m away · 1 Grade I, 10 Grade II
The site itself is not listed. Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show all 11 with distances
Historic England ↗
Opportunity area
Where the London Plan expects significant growth.
Boundaries are indicative and the borough holds the detailed plan.
Also on the record
Conservation area 25 m away: Bethnal Green Gardens; Registered park or garden 125 m away: Bethnal Green Gardens; National infrastructure project 1286 m away: Thames Tideway Tunnel; Inside the Tower Hamlets built-up area; Public transport access: PTAL 6a (excellent), TfL 2023, for the 100 m square; Town centre 29 m away: Bethnal Green; Priority habitat 38 m away: Deciduous woodland; Designated open space 36 m away.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 1 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Tower Hamlets - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Screening Opinion (EIA Regs)
Postcode
E2 0EL
Received
around 4 Nov 2025
Validated
4 Nov 2025
Ward
Bethnal Green West
Case officer
Show
Target decision
25 Nov 2025
Decision
EIA not required
Decision date
25 Nov 2025
Decision level
Delegated
Applicant
Show
Agent
DP9

Consultation & key dates

Statutory expiry
25 Nov 2025
Env. assessment
No
Tower Hamlets
Planning Authority Score
3.9/10
Below average
#201 of 296 councils
Relevant to this application:
Householder decisions

Tower Hamlets is slower than most councils at deciding householder applications, ranking #207 out of 296. Householder applications are slightly more likely to be approved here (92%) than the national average (90%).

Slower than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Tower Hamlets decision statistics
Based on MHCLG data, the year to March 2026
84%
Overall approval rate
Below avg (87%) #229 of 296
92%
Householder approved
Above avg (90%) #167 of 296
56%
Decided in 8 weeks
Below avg (63%) #207 of 296
42%
Extended time limit
Above avg (41%) #167 of 296
63%
Minor dwellings approved
52 decided (1-9 homes)
80%
Major dwellings approved
15 decided (10+ homes)
55%
Change of use approved
67 decided
998
Total decisions
164 refused in the year to March 2026