What was proposed
The application proposed a data centre building and compound, engineering works, security fencing, parking and a renewable-energy connection.
“Engineering operations are also proposed to install a private wire connection to the neighbouring Valencia Energy Centre, which would provide to provide a source of electricity for the data centre from renewable energy generated from landfill gas.”
“The proposed data centre would deliver sovereign AI infrastructure for the UK. This proposed data centre would form part of the first phase of the proposed network of next generation modular and small purpose-built AI factories that are co-located with renewable energy sources. The data centre would operate continuously and would only be staffed by a security team and occasional maintenance/servicing visits.”
Officer report
The site and its surroundings
The site is hardstanding within the Shelford Landfill site, surrounded by vegetation and neighbouring waste and energy infrastructure.
“The site is located within the Shelford Landfill site and is accessed via a private driveway from Broad Oak Road to the south. A Heavy Goods Vehicle (HGV) turning and parking/holding area associated with the landfill site is located directly to the north of the site, which together with the application site, is enclosed to all sides by a mature…”
Officer report
Earlier permissions
Earlier permissions covered landfill expansion, a materials recycling facility, restoration and a green-waste composting facility.
“In 1997 KCC granted planning permission for an extension to existing landfill operation, incorporating materials recycling facility and restoration to public amenity, nature conservation, woodland and agriculture.”
“In 1999 further permission was granted for the construction and operation of green waste composting facility for the production of horticultural compost.”
Officer report
Main planning issues
The assessment considered the principle of development, energy and water, landscape, living conditions, highways, ecology, drainage, contamination and archaeology.
“The application has been brought before the Planning Committee for determination at the request of Councillor McKenzie and Councillor Ricketts for Members to consider the impact of the proposed development on water demand and pollution, energy use and security, and increased traffic.”
“Principle ● Energy and Water Usage ● Character and Appearance ● Living Conditions ● Highways ● Ecology and Biodiversity ● Flooding and Drainage ● Contaminated Land ● Archaeology…”
Officer report
Consultation responses
Highways, ecology, drainage, environmental health, water, the Environment Agency and other consultees raised no objection, subject to conditions or further details.
“KCC Highways – No objection, subject to conditions to install vehicle parking, cycle parking and EV charging and Construction Environmental Management Plan.”
“South East Water – No objection, subject to conditions for limit of 20 cubic metres of water usage per day and for submission and approval of details of cooling system.”
Officer report
Objections received
Three neighbouring representations, the parish council and CPRE objected over water, energy, pollution, ecology, traffic, landscape, construction and stability.
“Letters were sent to neighbouring occupiers notifying them of the application. 3 representations were received, objecting to the application on the following grounds:”
“Strain on water resources through high water consumption and competition for supply in a water-stressed area • Potential for pollution in surface water drainage • Potential for sewer network to be overwhelmed increasing risk of flooding ad pollution • Noise pollution • Inadequate energy from landfill gas energy centre to power data centre • Long-term issues with reliability of renewable energy supply with landfill gas site closing in 2036 • Potential for subsidence from…”
Officer report
Decision and added requirements
The committee approved the proposal, amended the biodiversity condition to include northern planting and a landscape plan, and required a site-stability report.
“Prior to any works above slab level, a Biodiversity Enhancement Plan (BEP) and Landscape Plan shall be submitted to and approved in writing by the local planning authority. The Plan shall include full details of the biodiversity enhancements to be implemented on-site. The Plan shall be based on the details contained in the Preliminary Ecological Appraisal (EBS, November 2025) and shall include:”
“And the addition of a condition to require the applicant to prepare a report on the effect the development will have on the stability of the site. In determining whether the land is stable and any impacts on the land around the site the survey will need to include consideration of geology and hydrology…”
Minutes
Councillors at the meeting
- Dane BuckmanLab Co-op
- Keith BothwellGreen
- Michael DixeyLib Dem
- Harry McKenzieLab Co-op
- Keji MosesLab Co-op
- Dan SmithLib Dem
- Ian StockleyConservative
- David ThomasConservative
- Tom MellishSubstitute for Pat EdwardsLabour
Apologies Pat Edwards Labour
Source: Plota analysis of the council's minutes; parties from the council's list of councillors.
Sources
- Canterbury Planning Committee minutes, 13 October 2026
- Agenda and papers (council website)
Source: Plota analysis of Canterbury's committee minutes and officer report. Quotations are the council's own words; headings and summaries are Plota's.
Committee decisions and nationwide planning applications, in one API
The Plota API returns planning applications from every council we cover, each with its decision, whether a committee or officers decided it, and the committee date. Build it into your own tools.
See the API →At the meeting
- Committee
- Canterbury Planning Committee
- Council
- Canterbury
- Date
- Tuesday 13 October 2026
- Committee decided
- Approved
- Councillors
- 9Lab Co-op 3Conservative 2Lib Dem 2Green 1Labour 1Show councillors
- Minutes
- The council's minutes
- Meeting
- Agenda and papers (council website)
- Application
- View application →
- All decisions
- Canterbury committee decisions →
This committee's year
26 decisions in the 12 months to this meeting, 2 against officer advice.
Source: Plota analysis of the committee's minutes.