Carlton Centre, Granville Centre, 21-53 and 111-149 Granville Road, St Augustines Sports Centre, Woodrow… Data via plota.co.uk

26/2102 - Deemed (Reg4 Councils Other Development) Registered

Proposal

Installation of district heating network pipework (Phase 1) and installation of individual building connection pipework and associated Glass Reinforced Plastic (GRP) cabinets to Carlton Centre, 78 Granville Road, Granville Centre, 80 Granville Road, Granville New Homes East (21-53 Granville Road), Granville New Homes West (111-149 Granville Road), St Augustines Sports Centre, Rudolph Road, Woodrow House, Canterbury Road and Talbot Centre, 151 Granville Road in connection with the proposed South Kilburn District Heating Network,including associated external and internal works Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
18 Aug 2026
✓
Validated
29 Sept 2026
Decision
Expected by 24 Nov 2026

This application is under consideration - no decision has been issued yet. Plota predicts a decision around 24 Nov 2026, from Brent's recent utility and infrastructure works.

Documents 58

Plans & drawings 35

PDF Overall red line boundary Submitted Drawings Plans · 18 Aug 2026 View ↗ PDF Dh red line boundary brent council Submitted Drawings Plans · 18 Aug 2026 View ↗ PDF Overall - red line boundary with dh Submitted Drawings Plans · 18 Aug 2026 View ↗ PDF Traffic management plan Supporting Documents · 18 Aug 2026 View ↗ PDF Construction environmental plan (cep) Supporting Documents · 18 Aug 2026 View ↗ PDF Overall red line boundary with dh Submitted Drawings Plans · 18 Aug 2026 View ↗ PDF St augustines sports centre - location plan Submitted Drawings Plans · 18 Aug 2026 View ↗ PDF St augustines sports centre - proposed site plan Submitted Drawings Plans · 18 Aug 2026 View ↗ PDF St augustine's sport centre - existing elevation Submitted Drawings Plans · 18 Aug 2026 View ↗ PDF St augustine's sport centre - existing site plan Submitted Drawings Plans · 18 Aug 2026 View ↗ PDF St augustine's sport centre- proposed elevations Submitted Drawings Plans · 18 Aug 2026 View ↗ PDF Talbot centre location plan Submitted Drawings Plans · 18 Aug 2026 View ↗ PDF Tabot centre - existing site plan Submitted Drawings Plans · 18 Aug 2026 View ↗ PDF Tabot centre - existing elevations Submitted Drawings Plans · 18 Aug 2026 View ↗ PDF Tabot centre - proposed elevations Submitted Drawings Plans · 18 Aug 2026 View ↗ PDF Tabot centre - proposed site plan Submitted Drawings Plans · 18 Aug 2026 View ↗ PDF Carlton & granville non residential - location plan Submitted Drawings Plans · 18 Aug 2026 View ↗ PDF Carlton & granville non residential - existing basement plan Submitted Drawings Plans · 18 Aug 2026 View ↗ PDF Carlton & granville non residential - existing elevation Submitted Drawings Plans · 18 Aug 2026 View ↗ PDF Proposed basement plan Submitted Drawings Plans · 18 Aug 2026 View ↗ PDF Granville new homes - east location plan Supporting Documents · 18 Aug 2026 View ↗ PDF Granville new homes - east proposed site plan Supporting Documents · 18 Aug 2026 View ↗ PDF Granville new homes - east existing site plan Submitted Drawings Plans · 18 Aug 2026 View ↗ PDF Granville new homes east - existing elevation Submitted Drawings Plans · 18 Aug 2026 View ↗ PDF Granville new homes east - proposed elevation Submitted Drawings Plans · 18 Aug 2026 View ↗ PDF Granville new homes - west- proposed site plan Submitted Drawings Plans · 18 Aug 2026 View ↗ PDF Granville new homes - west - location plan Submitted Drawings Plans · 18 Aug 2026 View ↗ PDF Granville new homes - west- proposed elevation Submitted Drawings Plans · 18 Aug 2026 View ↗ PDF Granville new homes - west- existing elevation Submitted Drawings Plans · 18 Aug 2026 View ↗ PDF Granville new homes - west - existing site plan Submitted Drawings Plans · 18 Aug 2026 View ↗ PDF Peel block e - location plan Submitted Drawings Plans · 18 Aug 2026 View ↗ PDF Peel block e - existing site plan Submitted Drawings Plans · 18 Aug 2026 View ↗ PDF Peel block e - proposed site plan Submitted Drawings Plans · 18 Aug 2026 View ↗ PDF Peel block e - existing elevations Submitted Drawings Plans · 18 Aug 2026 View ↗ PDF Peel block e - proposed elevation Submitted Drawings Plans · 18 Aug 2026 View ↗

All documents on the council site ↗

Site constraints 4

South Kilburn conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Council document ↗
Air quality management area: Brent AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
7 listed buildings within 150 m
Nearest: 1,2,24 and 25, Cambridge Gardens Nw6, Grade II, 55 m away · 1 Grade I, 6 Grade II
The site itself is not listed. Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show all 7 with distances
Historic England ↗
Also on the record
Inside the Brent built-up area.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 2 October 2026. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Brent - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Brent
Application type
Deemed (Reg4 Councils Other Development)
Postcode
NW6 5AW
Received
18 Aug 2026
Validated
29 Sept 2026
Ward
Kilburn
Case officer
Show
Decision level
Delegated Team Manager
Applicant
Show
Agent
Turley

Decision outlook

Day 5 of the 56-day target. Brent usually decides utility and infrastructure works by day 56.

Day 551 days to the 56-day target
76%decided within 8 weeks
84%approved
58decided in the last year

Plota live figures for utility and infrastructure works decided by Brent in the last twelve months, from validation. Brent decision record →

Public comments

No public comments yet.

Last counted 2 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-15131442
Env. assessment
No
Brent
Planning Authority Score
5.7/10
Average
#113 of 296 councils
Relevant to this application:
Householder decisions

Brent is faster than most councils at deciding householder applications, ranking #91 out of 296. Only 28% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Householder applications are slightly less likely to be approved here (85%) than the national average (90%).

Faster than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Brent decision statistics
Based on MHCLG data, the year to March 2026
78%
Overall approval rate
Below avg (87%) #269 of 296
85%
Householder approved
Below avg (90%) #247 of 296
73%
Decided in 8 weeks
Above avg (63%) #91 of 296
28%
Extended time limit
Below avg (41%) #42 of 296
53%
Minor dwellings approved
73 decided (1-9 homes)
85%
Major dwellings approved
13 decided (10+ homes)
54%
Change of use approved
193 decided
1,963
Total decisions
431 refused in the year to March 2026