House of Hair Chapel Walk Rawmarsh Data via plota.co.uk

RB2026/1285 Approved

Proposal

Installation of roof mounted air conditioning unit Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
14 Sept 2026
✓
Validated
30 Sept 2026
✓
Approved
19 Nov 2026

Approved on 19 Nov 2026 · Delegated (Part 2A) · Last checked 19 Nov 2026

Site constraints 6

Coal mining development high risk area
Recorded coal mining features at or near the surface. Most planning applications here need a coal mining risk assessment.
From the Mining Remediation Authority, formerly the Coal Authority. The development high risk area marks recorded coal mining features at or near the surface: mine shafts and adits, shallow workings, mine gas and former opencast sites. Most planning applications there need a coal mining risk assessment; householder applications, changes of use and some minor works are exempt. Mine entry positions come from old plans and can be out by several metres, and unrecorded workings can exist anywhere in the coalfield.
Coal mining risk assessments ↗
Public footpath about 13 m away
Matters where it crosses or adjoins the site: obstructing a path without a diversion order is an offence, and work cannot start until the order is confirmed.
Compiled from highway authority data, not the legal definitive map. A few authorities have not published, so no path shown is not proof there is none.
Also on the record
Radon affected area, class 3; Inside the Rawmarsh built-up area; Green belt about 29 m away: South and West Yorkshire; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 3, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Outside flood zones 2 and 3 · No scheduled monument at the site

Checked on 2 November 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Mining Remediation Authority, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Rotherham - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Rotherham
Received
14 Sept 2026
Validated
30 Sept 2026
Ward
Rawmarsh West Ward
Parish
Non-Parished
Case officer
Show
Decision
GRANTED CONDITIONALLY
Decision date
19 Nov 2026
Decision level
Delegated (Part 2A)
Applicant
Show
Agent
Cadventure (Europe) Ltd

How this decision compares

Decided in 50 days from validation, 4 days faster than Rotherham's median of 54 for utility and infrastructure works. Approved, as 100% of utility and infrastructure works here are.

54%decided within 8 weeks
100%approved
30decided in the last year

Plota live figures for utility and infrastructure works decided by Rotherham in the last twelve months, from validation. Rotherham decision record →

Public comments

18comments received

Last counted 18 Nov 2026

Read the comments on the council site ↗

Consultation & key dates

Consultation
5 Oct 2026
Comments by
2 Nov 2026
Statutory expiry
25 Nov 2026
Rotherham
Planning Authority Score
4.7/10
Below average
#167 of 296 overall
Relevant to this application:
Householder decisions

Rotherham is #107 of 296 councils on householder decision speed. Rotherham is also one of the strictest councils - it refuses more householder applications than almost any other, with only 71% approved vs 90% nationally.

One of the strictest councils
only 71% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
Rotherham decision statistics
Based on MHCLG data, the year to March 2026
79%
Overall approval rate
Below avg (87%) #266 of 296
71%
Householder approved
Below avg (90%) #295 of 296
72%
Decided in 8 weeks
Above avg (63%) #107 of 296
32%
Extended time limit
Below avg (41%) #68 of 296
78%
Minor dwellings approved
63 decided (1-9 homes)
100%
Major dwellings approved
20 decided (10+ homes)
83%
Change of use approved
58 decided
750
Total decisions
156 refused in the year to March 2026