14 Queen Street Peterhead Aberdeenshire AB42 1TS Data via plota.co.uk

APP/2026/0781 - Full Planning Permission Approved

Proposal

Installation of External Air Conditioning Condensers Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
11 May 2026
✓
Validated
15 May 2026
✓
Approved
29 Jun 2026

Approved on 29 Jun 2026 · Delegated · Last checked 19 Jul 2026

Site constraints 3

Radon affected area, class 6
An estimated 30% or more of homes reach the radon action level. Indicative for the 1 km square, which takes the highest class found in it; a radon test gives the answer for a building.
From the British Geological Survey and UK Health Security Agency indicative atlas. Under building regulations, as the BRE guide BR 211 (2023) sets out, new buildings and extensions need basic radon protection from class 3 in England and Wales and from class 2 in Scotland, and full protection from class 5. The class at the site itself, from the detailed BGS map, decides which.
UKHSA radon ↗
Also on the record
4 listed buildings within 150 m; Conservation area 43 m away: Peterhead Central.
Not affected
Outside flood zones 2 and 3 · No scheduled monument at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Aberdeenshire - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Full Planning Permission
Postcode
AB42 1TS
Received
11 May 2026
Validated
15 May 2026
Ward
Peterhead North And Rattray
Parish
Peterhead
Case officer
Show
Target decision
14 Jul 2026
Decision
Approved
Decision date
29 Jun 2026
Decision level
Delegated
Applicant
Show
Agent
Space Solutions

How this decision compares

Decided in 45 days from validation, 16 days faster than Aberdeenshire's median of 61 for utility and infrastructure works. Approved, as 100% of utility and infrastructure works here are.

33%decided within 8 weeks
100%approved
58decided in the last year

Plota live figures for utility and infrastructure works decided by Aberdeenshire in the last twelve months, from validation. Aberdeenshire decision record →

Consultation & key dates

Alt. reference
100753974-001
Comments by
22 Jun 2026
Site or press notice
26 May 2026
Statutory expiry
14 Jul 2026
Env. assessment
No