The Old Schools, Registrarys Office Trinity Lane Cambridge Cambridgeshire CB2 1TN Data via plota.co.uk

26/02501/LBC - Listed Building Consent Approved

Proposal

Re-configuration to offices, including removal of modern partitions and additions of partitioning, with associated adjustments to building services. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
1 Jul 2026
✓
Consultation
9 Jul 2026
✓
Approved
26 Aug 2026

Approved on 26 Aug 2026 · Delegated Decision · Last checked 27 Aug 2026

Site constraints 7

Grade I listed: The Law School and University Offices
List entry 1126279 · The pin is inside its outline · 62 more listed buildings within 150 m (17 Grade I, 3 Grade II*, 42 Grade II)
Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show the other 62 with distances
Historic England ↗
Historic Core conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Council document ↗
In flood zones plus climate change
Inside the extent flood zones 2 and 3 could reach with climate change: the Central allowance for the 2080s on rivers, the Upper End allowance for sea level rise to 2125. From rivers. Defences are not counted.
The Environment Agency flood map for planning. Councils use it to decide when a flood risk assessment and the sequential test are needed. It is indicative and does not show whether a particular property will flood.
Flood map ↗
Air quality management area: Cambridge AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Registered park or garden 5 m away: King's College
Its setting is a consideration for work nearby.
Registered parks and gardens, battlefields, world heritage sites and protected wrecks are designated heritage assets: harm needs clear and convincing justification.
Historic England ↗
Also on the record
Inside the Cambridge (Cambridge) built-up area; National infrastructure project 1729 m away: East West Rail - Bedford to Cambridge and Western improvements, at pre-application.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Building

Floor area46 m² (495 sq ft)
Energy ratingA (asset rating 21)
UseD2 General Assembly and Leisure plus Night Clubs and Theatres
HeatingAir Conditioning

From the energy performance certificate lodged in April 2021, the latest held for this property. The building may have changed since. View the certificate

Work with planning data?

Every application in Cambridge - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Cambridge
Application type
Listed Building Consent
Postcode
CB2 1TN
Received
1 Jul 2026
Validated
1 Jul 2026
Ward
Newnham
Case officer
Show
Target decision
26 Aug 2026
Decision
Granted Permission
Decision date
26 Aug 2026
Decision level
Delegated Decision
Applicant
Show
Agent
Head of Estates

How this decision compares

Decided in 56 days from validation, about the council's usual 56 days. Approved, as 94% of changes of use here are.

52%decided within 8 weeks
94%approved
61decided in the last year

Plota live figures for changes of use decided by Cambridge in the last twelve months, from validation. Cambridge decision record →

Public comments

No public comments yet.

Last counted 27 Aug 2026

Read the comments on the council site ↗

Consultation & key dates

Site or press notice
9 Jul 2026
Statutory expiry
26 Aug 2026
Env. assessment
No
Cambridge
Planning Authority Score
8.3/10
Excellent
#18 of 296 councils
Relevant to this application:
Other decisions

Cambridge is one of the fastest councils in England for householder decisions, ranking #21 out of 296. Only 26% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Householder applications are slightly more likely to be approved here (94%) than the national average (90%).

Among the fastest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Cambridge decision statistics
Based on MHCLG data, the year to March 2026
90%
Overall approval rate
Above avg (87%) #108 of 296
94%
Householder approved
Above avg (90%) #100 of 296
86%
Decided in 8 weeks
Above avg (63%) #21 of 296
26%
Extended time limit
Below avg (41%) #34 of 296
74%
Minor dwellings approved
86 decided (1-9 homes)
80%
Major dwellings approved
5 decided (10+ homes)
80%
Change of use approved
41 decided
1,014
Total decisions
100 refused in the year to March 2026

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.