Adventure Playground Peckham Rye Park Homestall Road London Southwark Data via plota.co.uk

Pending 26/AP/1754
Date received
17 Jun 2026
Date validated
19 Jun 2026

Description

Details of Condition 8 - Method statement for habitat improvements as required by full planning permission dated 26/03/2025 for Installation of new play equipment (to replace existing), play safety surfacing, pathways, outdoor furniture, soft landscaping and tree planting within Peckham Rye Park. Data via plota.co.uk

Last checked

Decision outlook

Plota predicted a decision around 23 Nov 2026; it is now day 157.

Day 157, past the statutory target. 70% of community buildings in Southwark are decided within thirteen weeks; extensions of time are common, and the council need not decide on the day. Last seen undecided on 20 Nov 2026.

Day 157101 days past the 56-day target
54%decided within 8 weeks
98%approved
55decided in the last year

Plota live figures for community buildings decided by Southwark in the last twelve months, from validation. Southwark decision record →

Associated applications 6

Site constraints 9

Listed building: Peckham Rye Park
The pin is inside its outline
Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Metropolitan Open Land
Green belt level protection inside London.
The London Plan gives Metropolitan Open Land the same protection as green belt: inappropriate development needs very special circumstances.
Registered park or garden: Peckham Rye Park
Nationally designated heritage. Its significance and setting carry great weight.
Registered parks and gardens, battlefields, world heritage sites and protected wrecks are designated heritage assets: harm needs clear and convincing justification.
Historic England ↗
Air quality management area: Southwark AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Habitat network: Wood pasture and parkland
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Also on the record
Local nature reserve 393 m away: Nunhead Cemetery; Inside the Southwark built-up area; Public transport access: PTAL 2 (poor), TfL 2023, for the 100 m square; Priority habitat 16 m away: Deciduous woodland.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Southwark - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service
Southwark
Planning Authority Score
7/10
Good
#64 of 296 overall
Relevant to this application:
Householder decisions

Southwark is faster than most councils at deciding householder applications: #54 of 296 on speed. Householder applications are slightly more likely to be approved here (95%) than the national average (90%).

Faster than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Southwark decision statistics
Based on MHCLG data, the year to March 2026
92%
Overall approval rate
Above avg (87%) #93 of 296
95%
Householder approved
Above avg (90%) #92 of 296
78%
Decided in 8 weeks
Above avg (63%) #54 of 296
37%
Extended time limit
Below avg (41%) #122 of 296
92%
Minor dwellings approved
259 decided (1-9 homes)
86%
Major dwellings approved
14 decided (10+ homes)
82%
Change of use approved
38 decided
1,622
Total decisions
132 refused in the year to March 2026