Scartho Gateway Academy Matthew Telford Park Grimsby North East Lincolnshire Data via plota.co.uk

DM/0575/26/FUL - Full Application Pending Consideration

Proposal

Variation of Conditions 1 (Approved Plans) and 9 (Ball Strike) following DM/0460/25/FUL to retain the installed ball netting to the west of the football pitch Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
around 29 Oct 2026
✓
Consultation
2 Nov 2026
Decision
Expected by 7 Jan 2027

Under consideration

No decision has been issued yet. A decision is expected by 7 Jan 2027.

Comments are open until 29 Nov 2026

Comment on this application ↗

Site constraints 2

Agricultural land, grade 2, surveyed
Best and most versatile land (grades 1, 2 and 3a). Source: Natural England's post-1988 ALC field survey (Leeds). Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 3; the survey is the definitive reading.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Survey report ↗
Also on the record
National infrastructure project 1.7 km away: Hornsea Offshore Wind Farm (Zone 4) - Project Two.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in North East Lincs - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Full Application
Received
around 29 Oct 2026
Validated
29 Oct 2026
Ward
Scartho
Case officer
Show
Target decision
7 Jan 2027

Public comments

No public comments yet.

160 neighbours consulted · Last counted 17 Nov 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-15109742
Planning Portal ref
PP-15109742
Consultation
2 Nov 2026
Comments by
29 Nov 2026
Site or press notice
5 Nov 2026
Statutory expiry
7 Jan 2027
Env. assessment
No
North East Lincs
Planning Authority Score
5.3/10
Average
#132 of 296 overall
Relevant to this application:
Householder decisions

North East Lincs is #151 of 296 councils on householder decision speed. 52% of applications have the time limit extended, above the 41% national average. Householder applications are more likely to be approved here than most councils, with a 97% approval rate vs 90% nationally.

More permissive than most councils
97% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
North East Lincs decision statistics
Based on MHCLG data, the year to March 2026
95%
Overall approval rate
Above avg (87%) #22 of 296
97%
Householder approved
Above avg (90%) #35 of 296
64%
Decided in 8 weeks
Above avg (63%) #151 of 296
52%
Extended time limit
Above avg (41%) #235 of 296
95%
Minor dwellings approved
43 decided (1-9 homes)
87%
Major dwellings approved
15 decided (10+ homes)
82%
Change of use approved
22 decided
467
Total decisions
24 refused in the year to March 2026