Kingsbury Manor Summer House, Kingsbury Road, London Data via plota.co.uk

Registered 26/2498
Council
Date received
1 Oct 2026
Date validated
6 Oct 2026

Description

Proposed installation of a timber gazebo within the forest area of the school. Data via plota.co.uk

Last checked

Decision outlook

Plota predicts a decision around 1 Dec 2026, from Brent's recent extensions.

Day 3 of the 56-day target. Brent usually decides extensions by day 56.

Day 353 days to the 56-day target
79%decided within 8 weeks
77%approved
1,134decided in the last year

Plota live figures for extensions decided by Brent in the last twelve months, from validation. Brent decision record →

Site constraints 9

Grade II listed: Summerhouse Approximately 10 Metres North of Kingsbury Manor
List entry 1322049 · The pin is inside its outline · 1 more listed building within 150 m (1 Grade II)
Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show the other one with distances
Historic England ↗
Article 4 direction
Article 4 for HMOs. Named permitted development rights are withdrawn here.
An Article 4 direction withdraws particular permitted development rights, so work that would normally need no application needs one here. Not every council has published its directions.
Designated open space
Borough-designated open space.
Loss of protected open space is resisted unless it is replaced by space of equal or better quality nearby.
Heritage at risk: Summerhouse, Kingsbury Manor, 288, Kingsbury Road
On the register of historic places assessed as at risk.
A designated building, monument, park or conservation area assessed as at risk from neglect, decay or development. Proposals that secure its future are looked on favourably.
Historic England ↗
Priority habitat: Deciduous woodland
A habitat of principal importance. It shapes the ecology work and the biodiversity net gain a scheme has to show.
Air quality management area: Brent AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Also on the record
Local nature reserve 341 m away: Masons Field; Inside the Brent built-up area; Public transport access: PTAL 3 (moderate), TfL 2023, for the 100 m square.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 8 October 2026. Historic England, the Environment Agency, Natural England, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Brent - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service
Brent
Planning Authority Score
5.7/10
Average
#113 of 296 councils
Relevant to this application:
Householder decisions

Brent is faster than most councils at deciding householder applications, ranking #91 out of 296. Only 28% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Householder applications are slightly less likely to be approved here (85%) than the national average (90%).

Faster than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Brent decision statistics
Based on MHCLG data, the year to March 2026
78%
Overall approval rate
Below avg (87%) #269 of 296
85%
Householder approved
Below avg (90%) #247 of 296
73%
Decided in 8 weeks
Above avg (63%) #91 of 296
28%
Extended time limit
Below avg (41%) #42 of 296
53%
Minor dwellings approved
73 decided (1-9 homes)
85%
Major dwellings approved
13 decided (10+ homes)
54%
Change of use approved
193 decided
1,963
Total decisions
431 refused in the year to March 2026