01436/26/DPC - Discharge of Planning Conditions Decided

Proposal

Discharge of condition 3 (landscaping), condition 4 (Ecological mitigation measures), condition 6 (archaeological investigation), condition 7 (notification of archaeological works), condition 8 (archaeological archiving) and the standard BNG condition imposed on . Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
2 Sept 2026
✓
Responded
12 Nov 2026

Responded on 12 Nov 2026 · Delegated Decision · Last checked 13 Nov 2026

Documents 20

All documents on the council site ↗

Associated applications 2

  • Part of

    FullApprovedcouncil archive

    Conditions 3, 4, 6, 7, 8 decided (outcome not recorded)

    • ConditionsDischarge of condition 3 (landscaping), condition 4 (Ecological mitigation measures)…This application01436/26/DPC

Site constraints 3

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Agricultural land, grade 3b
Not best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. Natural England's Provisional ALC map (1:250,000, 1970s) agrees.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
National infrastructure project 1 km away: Triton Knoll Electrical System
The site is 1 km from the project boundary. Electricity line, decided. The project page says whether consent was granted. Also within 2 km: Outer Dowsing Offshore Wind (Generating Station) (decided, 1.8 km); Grimsby to Walpole (at pre-application, 925 m); Eastern Green Link 3 and Eastern Green Link 4 (at pre-application, 1.5 km).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Not affected
Not green belt · No listed building at the site · No scheduled monument at the site

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in East Lindsey - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Discharge of Planning Conditions
Postcode
PE24 5HL
Received
2 Sept 2026
Validated
2 Sept 2026
Ward
Burgh Le Marsh Ward
Parish
Burgh Le Marsh
Case officer
Show
Target decision
20 Nov 2026
Decision
Responded
Decision date
12 Nov 2026
Decision level
Delegated Decision
Applicant
Show
Agent
Paul Robinson Partnership

Public comments

No public comments yet.

Last counted 13 Nov 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-15140824
Planning Portal ref
PP-15140824
Comments by
7 Oct 2026
Statutory expiry
28 Oct 2026
Env. assessment
No
East Lindsey
Planning Authority Score
4.5/10
Below average
#171 of 296 overall
Relevant to this application:
Householder decisions

East Lindsey is #182 of 296 councils on householder decision speed. 47% of applications have the time limit extended, above the 41% national average. Householder applications are slightly more likely to be approved here (94%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
East Lindsey decision statistics
Based on MHCLG data, the year to March 2026
94%
Overall approval rate
Above avg (87%) #36 of 296
94%
Householder approved
Above avg (90%) #105 of 296
60%
Decided in 8 weeks
Below avg (63%) #182 of 296
47%
Extended time limit
Above avg (41%) #206 of 296
86%
Minor dwellings approved
146 decided (1-9 homes)
100%
Major dwellings approved
24 decided (10+ homes)
95%
Change of use approved
109 decided
817
Total decisions
53 refused in the year to March 2026